ROBUSTNESS OF VARIOUS PRODUCTION CONTROL POLICIES IN SEMICONDUCTOR MANUFACTURING

This paper compares several different production control policies in terms of their robustness to random disturbances such as machine failures, demand fluctuations, and system parameter changes. Simulation models based on VLSI wafer fabrication facilities are utilized to test the performance of the policies. Three different criteria, namely, the average total WIP, the average backlog, and a cost function combining these measures, are used to evaluate performance. Among the policies tested, the Two-Boundary Control policy outperforms the others.

[1]  Hong Chen,et al.  Empirical Evaluation of a Queueing Network Model for Semiconductor Wafer Fabrication , 1988, Oper. Res..

[2]  Reha Uzsoy,et al.  A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .

[3]  H. P. Tuinhout,et al.  The floating gate measurement technique for characterization of capacitor matching , 1996 .

[4]  S. Gershwin,et al.  PRODUCTION CONTROL FOR A TANDEM TWO-MACHINE SYSTEM , 1993 .

[5]  S.C.H. Lu,et al.  Efficient scheduling policies to reduce mean and variance of cycle-time in semiconductor manufacturing plants , 1994 .

[6]  Sheldon X. C. Lou Optimal control rules for scheduling job shops , 1988, Proceedings. 1988 IEEE International Conference on Robotics and Automation.

[7]  Houmin Yan,et al.  Using stochastic optimization to determine threshold values for the control of unreliable manufacturing systems , 1994 .

[8]  Suresh P. Sethi,et al.  Computational Evaluation of Hierarchical Production Control Policies for Stochastic Manufacturing Systems , 1997, Oper. Res..

[9]  P. R. Kumar,et al.  Distributed scheduling based on due dates and buffer priorities , 1991 .

[10]  P. R. Kumar,et al.  Re-entrant lines , 1993, Queueing Syst. Theory Appl..

[11]  David Y. Burman,et al.  Performance analysis techniques for IC manufacturing lines , 1986, AT&T Technical Journal.

[12]  S.X.C. Lou,et al.  A robust production control policy for VLSI wafer fabrication , 1989 .

[13]  Houmin Yan,et al.  Hub-centered production control of wafer fabrication , 1990, IEEE/SEMI Conference on Advanced Semiconductor Manufacturing Workshop.

[14]  Lawrence M. Wein,et al.  Scheduling semiconductor wafer fabrication , 1988 .

[15]  Mauricio G. C. Resende,et al.  Closed-loop job release control for VLSI circuit manufacturing , 1988 .

[16]  C. R. Glassey,et al.  Bottleneck starvation indicators for shop floor control (semiconductor manufacturing process) , 1988 .

[17]  Reha Uzsoy,et al.  A review of production planning and scheduling models in the semiconductor industry , 1994 .

[18]  David L. Woodruff,et al.  CONWIP: a pull alternative to kanban , 1990 .

[19]  William G. Oldham,et al.  A liftoff process using edge detection (LOPED) , 1988 .

[20]  Houmin Yan,et al.  Testing the robustness of two-boundary control policies in semiconductor manufacturing , 1996 .