An inexact bi-level simulation–optimization model for conjunctive regional renewable energy planning and air pollution control for electric power generation systems

In this study, an IBSOM (inexact bi-level simulation–optimization model) is developed for conjunctive regional renewable energy planning and air pollution control for EPS (electric power systems) under uncertainty. The IBSOM integrates techniques of CFMTVW (combined forecasting model with time-varying weights), ILP (interval linear programming), MIP (mixed integer programming), CCP (chance-constrained programming), as well as BLP (bi-level programming) into a general framework. In the IBSOM, uncertainties expressed as interval and stochastic parameters within multi-period and multi-option contexts can be effectively tackled. In addition, a leader-follower decision strategy is incorporated into the optimization process where two non-competitive objectives are sequentially proposed, with the environmental sector dominating the upper-level objective (leader’s one) and the energy sector providing the lower-level objective (follower’s one). To solve the proposed model, an improved bi-level interactive solution algorithm based on satisfactory degree is introduced into the decision-making process for balancing to what extent the constraints are met and the objective reaches its optima. Then, the IBSOM is applied to a real-world case study of EPS in Fengtai District, Beijing, China. Interval solutions associated with renewable energy development, electricity generation, facility-expansion scheme, as well as pollutants mitigation can be obtained under different system-violation risk. Results indicate that a higher violation risk would lead to a decreased strictness of the constraints or an expanded decision space, which results in the decreased system cost and pollutant emissions, but increases system risk. Conversely, a lower violation risk would correspond to a lower probability of system–constraint violation, then to higher system cost and more pollutant emissions, but the risk of violating the constraints would be decreased. These variations can enable Stakeholders to coordinate the conflict interactions among system cost, pollutants mitigation, and system-violation risk under multiple uncertainties. Moreover, the performance of the IBSOM is enhanced by comparing with single-level models. Results demonstrate that the IBSOM can promote much more mutual influences and restrictions between the twofold decision makers.

[1]  Guohe Huang,et al.  Development of a stochastic simulation–optimization model for planning electric power systems – A case study of Shanghai, China , 2014 .

[2]  Tapas K. Das,et al.  Emissions control via carbon policies and microgrid generation: A bilevel model and Pareto analysis , 2015 .

[3]  M. M. Ardehali,et al.  Combined cooling, heating, and power system optimal pricing for electricity and natural gas using particle swarm optimization based on bi-level programming approach: Case study of Canadian energy sector , 2015 .

[4]  Alireza Maheri,et al.  Multi-objective design under uncertainties of hybrid renewable energy system using NSGA-II and chance constrained programming , 2016 .

[5]  Jeehoon Han,et al.  A multi-objective optimization model for sustainable electricity generation and CO2 mitigation (EGCM) infrastructure design considering economic profit and financial risk , 2012 .

[6]  Mark O'Malley,et al.  Electricity, gas, heat integration via residential hybrid heating technologies – An investment model assessment , 2016 .

[7]  Seyed Ehsan Hosseini,et al.  Utilization of palm solid residue as a source of renewable and sustainable energy in Malaysia , 2014 .

[8]  Gerardo A. Pérez-Valdés,et al.  Natural gas cash-out problem: Bilevel stochastic optimization approach , 2010, Eur. J. Oper. Res..

[9]  Brian Vad Mathiesen,et al.  Wind power integration using individual heat pumps – Analysis of different heat storage options , 2012 .

[10]  Guohe Huang,et al.  A fuzzy-stochastic simulation-optimization model for planning electric power systems with considering peak-electricity demand: A case study of Qingdao, China , 2016 .

[11]  C. Weber,et al.  China's growing CO2 emissions--a race between increasing consumption and efficiency gains. , 2007, Environmental science & technology.

[12]  Bing Chen,et al.  ITOM: an interval-parameter two-stage optimization model for stochastic planning of water resources systems , 2005 .

[13]  Taher Niknam,et al.  Coordination of combined heat and power-thermal-wind-photovoltaic units in economic load dispatch using chance-constrained and jointly distributed random variables methods , 2015 .

[14]  Yongchun Zhao,et al.  Nonrenewable energy cost and greenhouse gas emissions of a 1.5 MW solar power tower plant in China , 2011 .

[15]  A. Huang,et al.  A game theoretic framework for a next-generation retail electricity market with high penetration of distributed residential electricity suppliers , 2014 .

[16]  A. Khellaf,et al.  Contribution to the modeling and simulation of solar power tower plants using energy analysis , 2014 .

[17]  Nobuo Kato,et al.  Anthropogenic emissions of SO2 and NOx in Asia : emission inventories , 1992 .

[18]  Son-Lin Nie,et al.  A dual-interval vertex analysis method and its application to environmental decision making under uncertainty , 2010, Eur. J. Oper. Res..

[19]  David Pozo,et al.  A convex chance-constrained model for reactive power planning , 2015 .

[20]  M. Parsa Moghaddam,et al.  A bi-level optimization model for operation of distribution networks with micro-grids , 2016 .

[21]  Maged M. Dessouky,et al.  A Stochastic Mixed-Integer Programming approach to the energy-technology management problem , 2012, Comput. Ind. Eng..

[22]  Guohe Huang,et al.  An interval fixed-mix stochastic programming method for greenhouse gas mitigation in energy systems , 2010 .

[23]  Mohammad Shahidehpour,et al.  Optimal scheduling of distributed battery storage for enhancing the security and the economics of electric power systems with emission constraints , 2015 .

[24]  A. Taha,et al.  A Quasi-Feed-In-Tariff policy formulation in micro-grids: A bi-level multi-period approach , 2014 .

[25]  Narges Kazemzadeh,et al.  Economic impact assessment and operational decision making in emission and transmission constrained electricity markets , 2012 .

[26]  J. Jansen,et al.  Generation of a Pareto front for a bi-objective water flooding optimization problem using approximate ensemble gradients , 2016 .

[27]  Yuan Hu,et al.  An NSGA-II based multi-objective optimization for combined gas and electricity network expansion planning , 2016 .

[28]  Farshad Kowsary,et al.  Multi-objective optimization of the building energy performance: A simulation-based approach by means of particle swarm optimization (PSO) , 2016 .

[29]  J. Wasilewski,et al.  Integrated modeling of microgrid for steady-state analysis using modified concept of multi-carrier energy hub , 2015 .

[30]  P. Warren A review of demand-side management policy in the UK , 2014 .

[31]  Haiyan Lu,et al.  Combined modeling for electric load forecasting with adaptive particle swarm optimization , 2010 .

[32]  Guohe Huang,et al.  Feasibility-based inexact fuzzy programming for electric power generation systems planning under dual uncertainties , 2011 .

[33]  Haiyan Lu,et al.  Combining forecasts of electricity consumption in China with time-varying weights updated by a high-order Markov chain model , 2014 .

[34]  Joško Deur,et al.  A bi-level optimisation framework for electric vehicle fleet charging management , 2016 .

[35]  Li He,et al.  Greenhouse gas emissions control in integrated municipal solid waste management through mixed integer bilevel decision-making. , 2011, Journal of hazardous materials.

[36]  Marcia Helena Costa Fampa,et al.  Bilevel optimization applied to strategic pricing in competitive electricity markets , 2008, Comput. Optim. Appl..

[37]  Y. P. Li,et al.  Planning Regional Water Resources System Using an Interval Fuzzy Bi-Level Programming Method , 2010 .

[38]  Ye Xu,et al.  Regional-scale electric power system planning under uncertainty—A multistage interval-stochastic integer linear programming approach , 2010 .

[39]  Li He,et al.  Regional planning of new-energy systems within multi-period and multi-option contexts: A case study of Fengtai, Beijing, China , 2016 .

[40]  C. Granger,et al.  Improved methods of combining forecasts , 1984 .

[41]  J. Geweke,et al.  Optimal Prediction Pools , 2008 .

[42]  J. Stock,et al.  Combination forecasts of output growth in a seven-country data set , 2004 .

[43]  Tarik Kousksou,et al.  Renewable energy potential and national policy directions for sustainable development in Morocco , 2015 .

[44]  Herminia I. Calvete,et al.  Linear bilevel programs with multiple objectives at the upper level , 2010, J. Comput. Appl. Math..

[45]  Iakovos Michailidis,et al.  Occupancy-based demand response and thermal comfort optimization in microgrids with renewable energy sources and energy storage , 2016 .

[46]  Adam Kasperski,et al.  A possibilistic approach to sequencing problems with fuzzy parameters , 2005, Fuzzy Sets Syst..

[47]  M. Ouyang,et al.  Approximate Pontryagin’s minimum principle applied to the energy management of plug-in hybrid electric vehicles , 2014 .

[48]  Paul H. Calamai,et al.  Bilevel and multilevel programming: A bibliography review , 1994, J. Glob. Optim..

[49]  S. Iniyan,et al.  A methodology for the electrical energy system planning of Tamil Nadu state (India) , 2009 .

[50]  Vahid Vahidinasab,et al.  Multiobjective environmental/techno-economic approach for strategic bidding in energy markets , 2009 .

[51]  G. H. Huang,et al.  A hybrid inexact-stochastic water management model , 1998, Eur. J. Oper. Res..

[52]  O. E. Emam,et al.  A fuzzy approach for bi-level integer non-linear programming problem , 2006, Appl. Math. Comput..

[53]  Tao Jiang,et al.  Security-constrained bi-level economic dispatch model for integrated natural gas and electricity systems considering wind power and power-to-gas process , 2017 .