MODEL FOR RAILWAY INFRASTRUCTURE MANAGEMENT ORGANIZATION
暂无分享,去创建一个
[1] Majda Bastič,et al. Model for Optimal Project Portfolio for the Construction of Railway Infrastructure on Corridors V and X , 2010 .
[2] Eftihia Nathanail,et al. Measuring the quality of service for passengers on the hellenic railways , 2008 .
[3] G. Stojić,et al. Modeling evaluation of the size of countries (regions) using fuzzy logic , 2010 .
[4] Dubravka Hozjan,et al. Development of Railways in New Marketing Conditions , 2007 .
[5] Dongkon Lee,et al. An approach to case-based system for conceptual ship design assistant , 1999 .
[6] Damjan Mlakar,et al. RAILWAY TRAFFIC MANAGEMENT AS A FUNCTION OF THE NEW INFRASTRUCTURE MANAGER , 2007 .
[7] Dragan Simic,et al. Modelling Evaluation of Railway Reform Level Using Fuzzy Logic , 2009, IDEAL.
[8] David C. Wilson,et al. Combining CBR with Interactive Knowledge Acquisition, Manipulation and Reuse , 1999, ICCBR.
[9] Jasmina Pašagić Škrinjar,et al. Selecting optimal pedestrian crossing using multi-criteria decision-making , 2010 .
[10] Tomislav Josip Mlinarić,et al. OPTIMIZING TRACK INFRASTRUCTURE AVAILABILITY , 2009 .
[11] Dušan Teodorović,et al. Swarm intelligence systems for transportation engineering: Principles and applications , 2008 .
[12] D. Tsamboulas. A tool for prioritizing multinational transport infrastructure investments , 2007 .