Comparing Team Interactions in Traditional and BIM-Lean Design Management

There is qualitative evidence showing that design teams that use BIM-lean management have a higher level of interaction than design teams that do not use this management approach. However, there is no quantitative empirical evidence of this higher level of interaction. Therefore, the objective of this paper is to present quantitative empirical evidence of the differences among the various types of interactions of a design team. Two case studies were analyzed, and their design management was assessed from a lean BIM perspective while their team interactions were assessed using social network analysis (SNA). To achieve the aim of this paper, four steps were performed: (1) case study selection; (2) description of the design management of the projects from the lean design management and BIM perspectives; (3) assessment of design team interaction; and (4) comparison using SNA. The results show that the project that applied BIM-lean management exhibited higher levels of interactions among its design team members than the traditional team; transparent, orderly, and standardized information flows; a collaborative, trusting, and learning environment; and commitment management. None of these interaction elements were visible in the project that did not apply BIM-lean management. It is suggested that an analysis be performed on a representative sample of projects in the future so that conclusive statistical inferences could be made.

[1]  S. Thomas Ng,et al.  Labour-intensive construction sub-contractors: Their critical success factors , 2010 .

[2]  Charles Leake,et al.  The Pareto principle in organizational decision making , 2002 .

[3]  Terry Winograd,et al.  The action workflow approach to workflow management technology , 1992, CSCW '92.

[4]  J. Uma Maheswari,et al.  Design iteration in construction projects Review and directions , 2017 .

[5]  Mehrdad Arashpour,et al.  Collaboration in BIM-based construction networks: A bibliometric-qualitative literature review , 2017 .

[6]  Farook Hamzeh,et al.  A Process-Social Perspective for Understanding Design Information Flow , 2017 .

[7]  Luis F. Alarcón,et al.  Developing a benchmarking system for architecture design firms , 2019, Engineering, Construction and Architectural Management.

[8]  S. Emmitt,et al.  Perceptions of lean design management , 2013 .

[9]  Bruce Hoppe,et al.  Social network analysis and the evaluation of leadership networks , 2010 .

[10]  Kerry London,et al.  Understanding and facilitating BIM adoption in the AEC industry , 2010 .

[11]  Fredrik Svalestuen,et al.  Key Elements to an Effective Building Design Team , 2015, CENTERIS/ProjMAN/HCist.

[12]  Amit Kumar Yadav,et al.  Investigating the Role of Lean Practices in Enabling BIM Adoption: Evidence from Two Indian Cases , 2015 .

[13]  Heng-Li Yang,et al.  Team structure and team performance in IS development: a social network perspective , 2004, Inf. Manag..

[14]  Luis F. Alarcón,et al.  Analyzing the Association between Lean Design Management Practices and BIM Uses in the Design of Construction Projects , 2021 .

[15]  Luis F. Alarcón,et al.  Understanding Interactions between Design Team Members of Construction Projects Using Social Network Analysis , 2020 .

[16]  John A. Gambatese,et al.  Alignment between Lean Principles and Practices and Worker Safety Behavior , 2017 .

[17]  Gregory A. Howell,et al.  Lean project management , 2003 .

[18]  Mohan M. Kumaraswamy,et al.  Effects of teamwork climate on cooperation in cross-functional temporary multi-organization workgroups , 2016 .

[19]  Matthew R. Hallowell,et al.  Collaborating in decision making of sustainable building design: An experimental study comparing CBA and WRC methods , 2016 .

[20]  B. Ashuri,et al.  BIM log mining: Discovering social networks , 2018, Automation in Construction.

[21]  Chien-Ho Ko,et al.  Lean Design Process , 2014 .

[22]  Ingrid M. Nembhard,et al.  Measuring Teamwork in Health Care Settings: A Review of Survey Instruments , 2014, Medical care.

[23]  Jane Matthews,et al.  A study of BIM collaboration requirements and available features in existing model collaboration systems , 2013, J. Inf. Technol. Constr..

[24]  Farook Hamzeh,et al.  Using social network theory and simulation to compare traditional versus BIM–lean practice for design error management , 2015 .

[25]  Jussi Savolainen,et al.  Indicators of collaborative design management in construction projects , 2018, Journal of Engineering, Design and Technology.

[26]  Vegard Knotten,et al.  Building design management – key success factors , 2017 .

[27]  Fleur Deken,et al.  Development of design collaboration skills , 2012 .

[28]  Luis F. Alarcón,et al.  An Assessment of Lean Design Management Practices in Construction Projects , 2019 .

[29]  Andrew R.J. Dainty,et al.  Subcontractor perspectives on supply chain alliances , 2001 .

[30]  Peter E.D. Love,et al.  A model for supporting inter-organizational relations in the supply chain , 2002 .

[31]  Fred Sherratt,et al.  Impact of integrated collaborative technologies to form a collaborative culture in construction projects , 2018 .

[32]  Andrew R.J. Dainty,et al.  The extent of team integration within construction projects , 2006 .

[33]  José Luis Ponz-Tienda,et al.  BIM Use Assessment (BUA) Tool for Characterizing the Application Levels of BIM Uses for the Planning and Design of Construction Projects , 2019, Advances in Civil Engineering.

[34]  Jennifer Whyte,et al.  Challenges of design management in construction , 2011 .

[35]  Robert Owen,et al.  Interaction of Lean and Building Information Modeling in Construction , 2010 .

[36]  Qing Hu,et al.  Lean thinking and organisational learning: How can they facilitate each other? , 2016 .

[37]  Carlos Torres Formoso,et al.  Modelling the Network of Commitments in the Last Planner System , 2011 .

[38]  Glenn Ballard,et al.  Explorando la relación entre los métodos de diseño lean y la reducción de residuos de construcción y demolición: tres estudios de caso de proyectos hospitalarios en California , 2016 .

[39]  Daniel Luiz de Mattos Nascimento,et al.  Digital Obeya Room: exploring the synergies between BIM and lean for visual construction management , 2018, Innovative Infrastructure Solutions.

[40]  Zofia K Rybkowski,et al.  Implementing Target Value Design , 2017, HERD.

[41]  Regan Potangaroa,et al.  Integration of Lean Design and Design Management and its Influence on the Development of a Multidisciplinary Design Management Model for Remote Site Projects , 2011 .

[42]  Iris D. Tommelein,et al.  Lean construction tools and techniques , 2007 .

[43]  Keith R. Molenaar,et al.  Risk Planning and Management for the Panama Canal Expansion Program , 2011 .

[44]  Timothy A. Salthouse,et al.  Decision Making and Problem Solving , 1982 .

[45]  John Van Reenen,et al.  New approaches to surveying organizations , 2010 .

[46]  Hans-Gerd Ridder The theory contribution of case study research designs , 2017 .

[47]  Luis F. Alarcón,et al.  Effects of Last Planner System Practices on Social Networks and the Performance of Construction Projects , 2018 .

[48]  Burcin Becerik-Gerber,et al.  BIM-Enabled Virtual and Collaborative Construction Engineering and Management , 2012 .