Grey prediction based software stage-effort estimation

The software stage-effort estimation can be used to dynamically adjust software project schedule, further to help make the project finished on budget. This paper presents a grey model Verhulst based method for stage-effort estimation during software development process, a bias correction technology was used to improve the estimation accuracy. The proposed method was evaluated with a large-scale industrial software engineering database. The results are very encouraging and indicate the method has considerable potential.

[1]  Yi-Fan Wang,et al.  On-Demand Forecasting of Stock Prices Using a Real-Time Predictor , 2003, IEEE Trans. Knowl. Data Eng..

[2]  Jer-Min Jou,et al.  The gray prediction search algorithm for block motion estimation , 1999, IEEE Trans. Circuits Syst. Video Technol..

[3]  Szu-Lin Su,et al.  Grey-based power control for DS-CDMA cellular mobile systems , 2000, IEEE Trans. Veh. Technol..

[4]  J. Deng,et al.  Introduction to Grey system theory , 1989 .

[5]  Shiuh-Jer Huang,et al.  Control of an inverted pendulum using grey prediction model , 1994, Proceedings of 1994 IEEE Industry Applications Society Annual Meeting.

[6]  Ren C. Luo,et al.  Target tracking using a hierarchical grey-fuzzy motion decision-making method , 2001, IEEE Trans. Syst. Man Cybern. Part A.