Major equipment life cycle cost analysis

Equipment life-cycle cost analysis (LCCA) is typically used as one component of the equipment fleet management process and allows the fleet manager to make equipment repair, replacement, and retention decisions on the basis of a given piece of equipment’s economic life. The objective of this research is to develop a robust method that permits equipment fleet managers to maximize the cost effectiveness of the fleet by optimizing the overall lifecycle value of each piece in the fleet. Minneapolis Public Works Fleet Services Division (MPWFSD) equipment fleet data was utilized in developing the proposed stochastic LCCA model for public agency’s fleet. The research compared output using actual data from current software to the output from the new stochastic LCCA method using equipment deterioration curves and probabilistic input variables for capital costs, fuel, and other operating costs to demonstrate enhanced ability to optimize fleet management decisions. The interest rate was found to have a greater impact on economic life output than fuel prices for a dump truck. The fuel volatility did impact the life-cycle costs when applying the stochastic confidence levels. Based on Monte Carlo simulation sensitivity analysis results, the time factor and engine factor were found to be the most sensitive input variables to the LCCA model. This leads to the conclusion that when deciding to replace a piece of equipment, engine efficiency should be a high priority due to the costs associated with the time factor, engine factor, and its subsequent annual usage.

[1]  J. Taylor,et al.  A Statistical Theory of Depreciation , 1923 .

[2]  Kenneth Dixon,et al.  Introduction to Stochastic Modeling , 2011 .

[3]  Robert L. Peurifoy,et al.  Construction planning, equipment and methods , 1956 .

[4]  Chan S. Park Contemporary Engineering Economics , 1993 .

[5]  Michael C. Vorster,et al.  Using the Cumulative Cost Model to Forecast Equipment Repair Costs: Two Different Methodologies , 2011 .

[6]  Gerardo W. Flintsch,et al.  Soft Computing-Based Infrastructure Life-Cycle Cost Analysis Tools , 2004 .

[7]  Hitoshi Furuta,et al.  Life-Cycle Cost Analysis for Infrastructure Systems: Life-Cycle Cost vs. Safety Level vs. Service Life , 2003 .

[8]  J S Gillespie,et al.  THE REPLACE/REPAIR DECISION FOR HEAVY EQUIPMENT , 2004 .

[9]  James Douglas Equipment Costs by Current Methods , 1978 .

[10]  Paul Kauffmann,et al.  Criteria for Fleet Management , 2012 .

[11]  Kimberly A. Neuendorf,et al.  The Content Analysis Guidebook , 2001 .

[12]  C. Schexnayder,et al.  HEAVY CONSTRUCTION EQUIPMENT REPLACEMENT ECONOMICS , 1980 .

[13]  Enrico Tronci 1997 , 1997, Les 25 ans de l’OMC: Une rétrospective en photos.

[14]  Douglas D. Gransberg,et al.  Stochastic Life-Cycle Cost Analysis for Pavement Preservation Treatments , 2012 .

[15]  Bengt J Allen,et al.  Statistics: Concepts and Applications for Science.ByDavid LeBlanc.Sudbury (Massachusetts): Jones and Bartlett Publishers. $89.95 (two‐volume set). xvii + 382 p; ill.; index. ISBN: 0–7637–4699–1. 2004.Workbook to AccompanyStatistics: Concepts and Applications for Science.ByDavid LeBlanc.Sudbury (Mass , 2004 .

[16]  Wei Fan,et al.  Equipment Replacement Decision Making: Challenges and Opportunities , 2013 .

[17]  Stephen Richardson Economics of Commuter Rail Alternatives: Comparative Cost Perspective , 2004 .

[18]  N. G. Saleri,et al.  Discussion of stochastic modeling. Authors' reply , 1990 .

[19]  James Douglas Construction equipment policy , 1975 .

[20]  H. Haldorsen,et al.  Stochastic Modeling (includes associated papers 21255 and 21299 ) , 1990 .

[21]  D. Goldsman Operations Research Models and Methods , 2003 .

[22]  Zane Windsor Mitchell,et al.  A Statistical Analysis Of Construction Equipment Repair Costs Using Field Data & The Cumulative Cost Model. , 1998 .

[23]  Douglas Ray Asfahl,et al.  Construction Equipment Management for Engineers, Estimators, and Owners , 2006 .

[24]  Jan Palczewski,et al.  Monte Carlo Simulation , 2008, Encyclopedia of GIS.

[25]  Randy C West,et al.  A Review of the Alabama Department of Transportation’s Policies and Procedures for Life-Cycle Cost Analysis for Pavement Type Selection , 2013 .

[26]  Douglas D. Gransberg,et al.  Quantifying Uncertainty of Construction Material Price Volatility Using Monte Carlo , 2008 .

[27]  H. M. Taylor,et al.  An introduction to stochastic modeling , 1985 .

[28]  Peter M. Chisnall,et al.  Questionnaire Design, Interviewing and Attitude Measurement , 1993 .

[29]  Douglas D. Gransberg,et al.  Life-Cycle Cost Analysis of Surface Retexturing with Shotblasting as an Asphalt Pavement Preservation Tool , 2009 .

[30]  Zhigang Jin,et al.  A Study on the Factors Affecting the Economical Life of Heavy Construction Equipment , 2011 .

[31]  Scott Ferson,et al.  Sensitivity analysis for models of population viability , 1995 .

[32]  Pramodita Sharma 2012 , 2013, Les 25 ans de l’OMC: Une rétrospective en photos.