Due-date based scheduling and control policies in a multiproduct semiconductor wafer fabrication facility
暂无分享,去创建一个
Yeong-Dae Kim | Hong-Bae Jun | Seung-Kil Lim | Jung-Ug Kim | Yeong-Dae Kim | Seungkil Lim | H. Jun | Jung-Ug Kim
[1] Mauricio G. C. Resende,et al. A scheduling rule for job release in semiconductor fabrication , 1988 .
[2] A. K. Chakravarty,et al. Capacity, cost and scheduling analysis for a multiproduct flexible manufacturing cell , 1987 .
[3] Lee W. Schruben,et al. Planning and scheduling in Japanese semiconductor manufacturing , 1994 .
[4] J.D. Shott,et al. The future of automation for high-volume Wafer fabrication and ASIC manufacturing , 1986, Proceedings of the IEEE.
[5] Peter R. Nelson,et al. Design and Analysis of Experiments, 3rd Ed. , 1991 .
[6] Reha Uzsoy,et al. A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .
[7] R. Serfozo,et al. Optimal control of batch service queues , 1973, Advances in Applied Probability.
[8] Don T. Phillips,et al. A state-of-the-art survey of dispatching rules for manufacturing job shop operations , 1982 .
[9] Reha Uzsoy,et al. A review of production planning and scheduling models in the semiconductor industry , 1994 .
[10] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .
[11] S. S. Panwalkar,et al. A Survey of Scheduling Rules , 1977, Oper. Res..
[12] Pravin K. Johri,et al. Practical issues in scheduling and dispatching in semiconductor wafer fabrication , 1993 .
[13] Margaret J. Robertson,et al. Design and Analysis of Experiments , 2006, Handbook of statistics.
[14] P. R. Kumar,et al. Distributed scheduling based on due dates and buffer priorities , 1991 .
[15] Ram Akella,et al. Control of batch processing systems in semiconductor wafer fabrication facilities , 1992 .
[16] Lawrence M. Wein,et al. Scheduling semiconductor wafer fabrication , 1988 .
[17] Mauricio G. C. Resende,et al. Closed-loop job release control for VLSI circuit manufacturing , 1988 .
[18] Ari P. J. Vepsalainen. Priority rules for job shops with weighted tardiness costs , 1987 .
[19] Bernard W. Taylor,et al. A comparative analysis of the COVERT job sequencing rule using various shop performance measures , 1987 .
[20] Lawrence M. Wein,et al. A broader view of the job-shop scheduling problem , 1992 .