PPP Social Infrastructure Procurement: Examining the Feasibility of a Lifecycle Performance Measurement Framework

Public-private partnerships (PPPs) have been extensively used to deliver an array of infrastructure projects in Australia; they have become an integral part of several state governments’ procurement strategies. Over the last decade, however, several major PPP projects have incurred significant cost and schedule overruns, which have marred their use as a mechanism for delivering much-needed infrastructure. The paucity of performance measurement frameworks has contributed to the difficulty of proactively managing the effective and efficient delivery of PPPs, particularly during operations and maintenance. With this in mind, a lifecycle and stakeholder-oriented performance measurement framework (PMF) is conceptualized within the context of social infrastructure PPPs. The opinions of 160 practitioners about the proposed measures and their core indicators were solicited using a questionnaire survey. Confirmatory factor analysis was used to test the significance of proposed measures and their relevant core indicators (CIs) for measuring the performance of PPP projects throughout their lifecycle. The analysis reveals that the proposed PMF is a reliable and robust tool that can be used to assist with ensuring that social infrastructure PPPs can be delivered successfully throughout each phase of their lifecycle. The developed PMF provides governments and private consortiums with a robust and practical tool to measure and control the performance of their future projects.

[1]  M. Lewis,et al.  Public Private Partnerships: The Worldwide Revolution in Infrastructure Provision and Project Finance , 2004 .

[2]  Olusegun O. Faniran,et al.  Structural equation model of project planning effectiveness , 2005 .

[3]  L. Cronbach Coefficient alpha and the internal structure of tests , 1951 .

[4]  P. Love,et al.  Public-Private Partnerships: A Review of Theory and Practice of Performance Measurement , 2014 .

[5]  Graeme Hodge,et al.  The Challenge of Public–Private Partnerships , 2005 .

[6]  Xiaohua Jin,et al.  Neurofuzzy Decision Support System for Efficient Risk Allocation in Public-Private Partnership Infrastructure Projects , 2010, J. Comput. Civ. Eng..

[7]  G. Hodge The risky business of public–private partnerships , 2004 .

[8]  Ghassan Aouad,et al.  Performance management in construction: a conceptual framework , 2001 .

[9]  Peter E.D. Love,et al.  Praxis of Performance Measurement in Public-Private Partnerships: Moving beyond the Iron Triangle , 2016 .

[10]  James B. Schreiber,et al.  Reporting Structural Equation Modeling and Confirmatory Factor Analysis Results: A Review , 2006 .

[11]  B. Tabachnick,et al.  Using Multivariate Statistics , 1983 .

[12]  Andy Neely,et al.  Performance measurement frameworks: A review , 2007 .

[13]  Thaddeus Tarpey,et al.  Confirmatory factor analysis of the Neurological Evaluation Scale in unmedicated schizophrenia , 2005, Psychiatry Research.

[14]  Eric R. Ziegel,et al.  Survey Sampling Principles , 1993 .

[15]  Duncan David Nulty,et al.  The adequacy of response rates to online and paper surveys: what can be done? , 2008 .

[16]  Peter E.D. Love,et al.  Ex-Ante Evaluation of Public-Private Partnerships: Macroeconomic Analysis , 2015 .

[17]  Peter E. D. Love,et al.  Construction business performance measurement: the SPM alternative , 2000, Bus. Process. Manag. J..

[18]  Andy Neely,et al.  The Performance Prism: The Scorecard for Measuring and Managing Business Success , 2002 .

[19]  Keith R. Molenaar,et al.  Key Performance Indicators in Public-Private Partnerships: A State-of-the-Practice Report , 2011 .

[20]  Champika Lasanthi Liyanage,et al.  Measuring Success of PPP Transport Projects: A Cross-Case Analysis of Toll Roads , 2015 .

[21]  Jingfeng Yuan,et al.  Developing Key Performance Indicators for Public-Private Partnership Projects: Questionnaire Survey and Analysis , 2012 .

[22]  Michael Regan,et al.  Infrastructure Procurement: Learning from Private–Public Partnership Experiences ‘Down Under’ , 2011 .

[23]  Ming Xu,et al.  Comparative performance of PPPs and traditional procurement in Australia , 2007 .

[24]  Pantaleo Mutajwaa Daniel Rwelamila,et al.  Addressing the Missing Link in PPP Projects: What Constitutes the Public? , 2015 .

[25]  Xiaohua Jin,et al.  Determinants of Efficient Risk Allocation in Privately Financed Public Infrastructure Projects in Australia , 2010 .

[26]  G. Ofori,et al.  Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: contractors' perspectives , 2011 .

[27]  N. Vajdic,et al.  Use of key performance indicators for PPP transport projects to meet stakeholders’ performance objectives , 2013 .

[28]  Konstantina Gkritza,et al.  Cost Savings Analysis of Performance-Based Contracts for Highway Maintenance Operations , 2010 .

[29]  Qiming Li,et al.  Selection of performance objectives and key performance indicators in public–private partnership projects to achieve value for money , 2009 .

[30]  P. Love,et al.  Conceptual Framework for the Performance Measurement of Public-Private Partnerships , 2015 .

[31]  A. Neely,et al.  The performance prism in practice , 2001 .

[32]  Weng Tat Chan,et al.  Interface Management for China’s Build – Operate – Transfer Projects , 2005 .

[33]  Richard P. Bagozzi,et al.  Specification, evaluation, and interpretation of structural equation models , 2012 .

[34]  Stephen O. Ogunlana,et al.  Sample Size and Model Fit Indices for Structural Equation Modelling (SEM): The Case of Construction Management Research , 2013 .

[35]  Peter E.D. Love,et al.  Future Proofing PPPs: Life-Cycle Performance Measurement and Building Information Modelling , 2015 .

[36]  Y. Kwak,et al.  Towards a Comprehensive Understanding of Public Private Partnerships for Infrastructure Development , 2009 .

[37]  Thanwadee Chinda,et al.  Structural equation model of construction safety culture , 2008 .