Summing-up and Analysis on Engineering of Overhaul Transformation in Mudanjiang Marshalling Station

Through making overhaul transformation for the retarder that installed in the Mudanjiang IV marshalling station,this parpe introduces their various parpring work done before engineering transformation and need attention problems in construction,so that for consulting for person of same trade colleage;