Integrating Safety, Environmental and Quality Risks for Project Management Using a FMEA Method
暂无分享,去创建一个
[1] Roger M. Cooke,et al. Applications of some risk assessment techniques: Formal expert judgement and accident sequence precursors , 1997 .
[2] O. P. Gandhi,et al. FMEA—A diagraph and matrix approach , 1992 .
[3] Nigel J. Smith,et al. Application of a fuzzy based decision making methodology to construction project risk assessment , 2007 .
[4] Sheng‐Hsien Teng,et al. Failure mode and effects analysis: An integrated approach for product design and process control , 1996 .
[5] Chia-Wen Liao,et al. Data mining for occupational injuries in the Taiwan construction industry , 2008 .
[6] Akintola Akintoye,et al. Project risk management practice: The case of a South African utility company , 2008 .
[7] Kyoo-Jin Yi,et al. Scheduling-based risk estimation and safety planning for construction projects , 2006 .
[8] E. Kutsch,et al. Deliberate ignorance in project risk management , 2010 .
[9] Patrick X.W. Zou,et al. Understanding the key risks in construction projects in China , 2007 .
[10] Kathryn Mearns,et al. Safety climate responses and the perceived risk of accidents in the construction industry. , 2008 .
[11] José F. Molina-Azorín,et al. Quality Management, Environmental Management and Firm Performance: A Review of Empirical Studies and Issues of Integration , 2009 .
[12] Jonathan Jingsheng Shi,et al. A synergetic model for implementing an integrated management system: an empirical study in China , 2007 .
[13] Zhen Chen,et al. An integrative methodology for environmental management in construction , 2004 .
[14] Alena Labodová,et al. Implementing integrated management systems using a risk analysis based approach , 2004 .
[15] David Arditi,et al. Fatal accidents in nighttime vs. daytime highway construction work zones. , 2007, Journal of safety research.
[16] Johnny Dyreborg,et al. Prioritizing occupational injury prevention in the construction industry: injury severity or absence? , 2007, Journal of safety research.
[17] Mumtaz Usmen,et al. Comparative Injury and Fatality Risk Analysis of Building Trades , 2006 .
[18] Chi Ming Tam,et al. ISO 14000 and the construction industry: survey in China , 2003 .
[19] Chee Peng Lim,et al. Fuzzy FMEA with a guided rules reduction system for prioritization of failures , 2006 .
[20] Peter Hoonakker,et al. Quality and Safety Management in Construction , 2006 .
[21] Shahid Suddle,et al. The weighted risk analysis , 2009 .
[22] D. Fang,et al. Why operatives engage in unsafe work behavior: Investigating factors on construction sites , 2008 .
[23] Saixing Zeng,et al. Identifying elements of poor construction safety management in China , 2004 .
[24] Tarek Zayed,et al. Assessing risk and uncertainty inherent in Chinese highway projects using AHP , 2008 .
[25] Dragan Komljenovic,et al. Injuries in U.S. mining operations – A preliminary risk analysis , 2008 .
[26] Low Sui Pheng,et al. Implementing Total Quality Management in Construction Firms , 2004 .
[27] H. Schneider. Failure mode and effect analysis : FMEA from theory to execution , 1996 .
[28] Vivian W. Y Tam,et al. Towards occupational health and safety systems in the construction industry of China , 2008 .
[29] Low Sui Pheng,et al. Integrating ISO 9001 Quality Management System and ISO 14001 Environmental Management System for Contractors , 2005 .
[30] K. N. Jha,et al. Critical Factors Affecting Quality Performance in Construction Projects , 2006 .
[31] Simon Smith,et al. Safety hazard identification on construction projects , 2006 .
[32] Andrew Hale,et al. Quantifying Occupational Risk: The Development of an Occupational Risk Model , 2008 .