Integrating Safety, Environmental and Quality Risks for Project Management Using a FMEA Method

In recent years, many construction firms have implemented various management systems, including OHSAS 18001 for occupational health and safety (OHS) management, ISO 14001 for environmental management and ISO 9001 for quality management. With increasing interests from construction firms in implementing an integrated management system (IMS) which combines OHSAS 18001, ISO 14001 and ISO 9001, it is timely to assess, manage and control the risks resulted from OHS, environment and quality issues under this new integrated scheme. In this study, the Failure Modes and Effects Analysis (FMEA) is employed to analyze risk management for OHS, environment and quality management under an IMS in a local case study in China. FMEA is known to be a systematic procedure for the analysis of a system to identify the potential failure modes, and their causes and effects on system performance in engineering management. The analysis is performed at the early stage of a system so that removal or mitigation of the failure mode is most cost effective method. On the basis of risk priority numbers calculated from occurrence, severity, and detection of potential risks, twenty potential risk factors are graded, and their levels of acceptability are determined. The acceptability of risks is defined into four scenarios: acceptable, moderate, undesirable, and unacceptable. The findings indicate that five major potential risks, including “Roof related falls”, “Elevator shaft falls”, “Holes in flooring on construction site”, “Hit by falling objects”, and “Run over by operating equipment”, are graded to be unacceptable. These events are considered the most risky in construction. In practice, these unacceptable risks can be minimized through prevention or protection. The main goal of risk management is to keep the risks at an acceptable level by maintaining the tolerable risks and following the programs in moving unacceptable risks to an acceptable level. Risk management must involve risk mitigation measures so as to fulfill OHS, environmental and quality management programs, leading to a reduction of risk levels. All these are designed to avoid accidents, incidents, injury, or occupational diseases. In the event of an accident that has already occurred, a necessary part of risk management is the management of crisis for minimizing losses/impacts. Accordingly, measures for risk management for the twenty potential risk factors of OHS, environment and quality are recommended. It is revealed that training programs are prioritized to be the most effective measures in integrated risk management. Effective training helps personnel carry out various activities, establish a positive safety attitude, and integrate safety with environmental and quality goals. Comparing to other countries, training is believed to have a significant role in the construction industry of China due to the fact that the percentage of construction workers being trained is very low. This paper then proposes a methodology for contractors who implement the management system to integrate risk management in the pursuit of continuous improvement in project management. To achieve that, an integrated risk management is tied with a Deming’s cycle (Plan-Do-Check-Act) (P-D-C-A), in which it is necessary to add audits and management review for attaining continuous improvement.

[1]  Roger M. Cooke,et al.  Applications of some risk assessment techniques: Formal expert judgement and accident sequence precursors , 1997 .

[2]  O. P. Gandhi,et al.  FMEA—A diagraph and matrix approach , 1992 .

[3]  Nigel J. Smith,et al.  Application of a fuzzy based decision making methodology to construction project risk assessment , 2007 .

[4]  Sheng‐Hsien Teng,et al.  Failure mode and effects analysis: An integrated approach for product design and process control , 1996 .

[5]  Chia-Wen Liao,et al.  Data mining for occupational injuries in the Taiwan construction industry , 2008 .

[6]  Akintola Akintoye,et al.  Project risk management practice: The case of a South African utility company , 2008 .

[7]  Kyoo-Jin Yi,et al.  Scheduling-based risk estimation and safety planning for construction projects , 2006 .

[8]  E. Kutsch,et al.  Deliberate ignorance in project risk management , 2010 .

[9]  Patrick X.W. Zou,et al.  Understanding the key risks in construction projects in China , 2007 .

[10]  Kathryn Mearns,et al.  Safety climate responses and the perceived risk of accidents in the construction industry. , 2008 .

[11]  José F. Molina-Azorín,et al.  Quality Management, Environmental Management and Firm Performance: A Review of Empirical Studies and Issues of Integration , 2009 .

[12]  Jonathan Jingsheng Shi,et al.  A synergetic model for implementing an integrated management system: an empirical study in China , 2007 .

[13]  Zhen Chen,et al.  An integrative methodology for environmental management in construction , 2004 .

[14]  Alena Labodová,et al.  Implementing integrated management systems using a risk analysis based approach , 2004 .

[15]  David Arditi,et al.  Fatal accidents in nighttime vs. daytime highway construction work zones. , 2007, Journal of safety research.

[16]  Johnny Dyreborg,et al.  Prioritizing occupational injury prevention in the construction industry: injury severity or absence? , 2007, Journal of safety research.

[17]  Mumtaz Usmen,et al.  Comparative Injury and Fatality Risk Analysis of Building Trades , 2006 .

[18]  Chi Ming Tam,et al.  ISO 14000 and the construction industry: survey in China , 2003 .

[19]  Chee Peng Lim,et al.  Fuzzy FMEA with a guided rules reduction system for prioritization of failures , 2006 .

[20]  Peter Hoonakker,et al.  Quality and Safety Management in Construction , 2006 .

[21]  Shahid Suddle,et al.  The weighted risk analysis , 2009 .

[22]  D. Fang,et al.  Why operatives engage in unsafe work behavior: Investigating factors on construction sites , 2008 .

[23]  Saixing Zeng,et al.  Identifying elements of poor construction safety management in China , 2004 .

[24]  Tarek Zayed,et al.  Assessing risk and uncertainty inherent in Chinese highway projects using AHP , 2008 .

[25]  Dragan Komljenovic,et al.  Injuries in U.S. mining operations – A preliminary risk analysis , 2008 .

[26]  Low Sui Pheng,et al.  Implementing Total Quality Management in Construction Firms , 2004 .

[27]  H. Schneider Failure mode and effect analysis : FMEA from theory to execution , 1996 .

[28]  Vivian W. Y Tam,et al.  Towards occupational health and safety systems in the construction industry of China , 2008 .

[29]  Low Sui Pheng,et al.  Integrating ISO 9001 Quality Management System and ISO 14001 Environmental Management System for Contractors , 2005 .

[30]  K. N. Jha,et al.  Critical Factors Affecting Quality Performance in Construction Projects , 2006 .

[31]  Simon Smith,et al.  Safety hazard identification on construction projects , 2006 .

[32]  Andrew Hale,et al.  Quantifying Occupational Risk: The Development of an Occupational Risk Model , 2008 .