A Multiobjective Disassembly Planning for Value Recovery and Energy Conservation From End-of-Life Products
暂无分享,去创建一个
Chaoyong Zhang | Yaping Ren | Leilei Meng | Fu Zhao | John W. Sutherland | Ting Qu | Biao Zhang | Hongyue Jin | Geng Wang | J. Sutherland | T. Qu | Chaoyong Zhang | Leilei Meng | Yaping Ren | Fu Zhao | Hongyue Jin | Biao Zhang | Geng Wang
[1] Michael F. Ashby,et al. Materials and the Environment: Eco-informed Material Choice , 2009 .
[2] Alfred J.D. Lambert,et al. Linear programming in disassembly/clustering sequence generation , 1999 .
[3] John W. Sutherland,et al. A comparison of manufacturing and remanufacturing energy intensities with application to diesel engine production , 2008 .
[4] Min Liu,et al. An enhanced Pareto-based artificial bee colony algorithm for the multi-objective flexible job-shop scheduling , 2012 .
[5] R. Venkata Rao,et al. Decision making in the manufacturing environment using an improved PROMETHEE method , 2010 .
[6] Chaoyong Zhang,et al. Pareto based artificial bee colony algorithm for multi objective single model assembly line balancing with uncertain task times , 2014, Comput. Ind. Eng..
[7] Hua Zhang,et al. Value recovery options portfolio optimization for remanufacturing end of life product , 2019, Journal of Cleaner Production.
[8] Ying Liu,et al. An integrated decision-making method for selecting machine tool guideways considering remanufacturability , 2020, Int. J. Comput. Integr. Manuf..
[9] Dharmender Kumar,et al. A review on Artificial Bee Colony algorithm , 2013 .
[10] MengChu Zhou,et al. A systematic approach to design and operation of disassembly lines , 2006, IEEE Trans Autom. Sci. Eng..
[11] Liu Qiang,et al. Partial disassembly sequence planning based on Pareto ant colony algorithm , 2016, 2016 Chinese Control and Decision Conference (CCDC).
[12] Chaoyong Zhang,et al. A hybrid metaheuristic algorithm for a profit-oriented and energy-efficient disassembly sequencing problem , 2020, Robotics Comput. Integr. Manuf..
[13] Gianluca Percoco,et al. Preliminary Evaluation of Artificial Bee Colony Algorithm When Applied to Multi Objective Partial Disassembly Planning , 2013 .
[14] Jorge Arinez,et al. Sustainable Manufacturing Performance Indicators for a Serial Production Line , 2016, IEEE Transactions on Automation Science and Engineering.
[15] Hua Zhang,et al. A two-stage optimization method for energy-saving flexible job-shop scheduling based on energy dynamic characterization , 2018, Journal of Cleaner Production.
[16] D.A. Van Veldhuizen,et al. On measuring multiobjective evolutionary algorithm performance , 2000, Proceedings of the 2000 Congress on Evolutionary Computation. CEC00 (Cat. No.00TH8512).
[17] Shana Smith,et al. Partial disassembly sequence planning based on cost-benefit analysis , 2016 .
[18] Victor R. Prybutok,et al. An improved co-evolutionary algorithm for green manufacturing by integration of recovery option selection and disassembly planning for end-of-life products , 2016 .
[19] Li Li,et al. A knowledge-driven method of adaptively optimizing process parameters for energy efficient turning , 2019, Energy.
[20] Shahin Rahimifard,et al. A decision-making model for waste management in the footwear industry , 2007 .
[21] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[22] MengChu Zhou,et al. Stochastic Disassembly Sequence Optimization for Profit and Energy Consumption , 2018, 2018 IEEE International Conference on Systems, Man, and Cybernetics (SMC).
[23] Chaoyong Zhang,et al. Selective cooperative disassembly planning based on multi-objective discrete artificial bee colony algorithm , 2017, Eng. Appl. Artif. Intell..
[24] J. Sutherland,et al. Life Cycle Assessment of Neodymium-Iron-Boron Magnet-to-Magnet Recycling for Electric Vehicle Motors. , 2018, Environmental science & technology.
[25] MengChu Zhou,et al. Disassembly Sequence Planning Considering Fuzzy Component Quality and Varying Operational Cost , 2018, IEEE Transactions on Automation Science and Engineering.
[26] Li Li,et al. Selection of optimum parameters in multi-pass face milling for maximum energy efficiency and minimum production cost , 2017 .
[27] Dong-Ho Lee,et al. Parallel disassembly sequencing with sequence-dependent operation times , 2001 .
[28] Yixiong Feng,et al. Sequence Planning for Selective Disassembly Aiming at Reducing Energy Consumption Using a Constraints Relation Graph and Improved Ant Colony Optimization Algorithm , 2018, Energies.
[29] Dimitris Kiritsis,et al. A multi-objective evolutionary algorithm for EOL product recovery optimization: turbocharger case study , 2007 .
[30] Guoqing Jin,et al. A systematic selective disassembly approach for Waste Electrical and Electronic Equipment with case study on liquid crystal display televisions , 2017 .
[31] Rob A. Zuidwijk,et al. Strategic response to EEE returns: : Product eco-design or new recovery processes? , 2008, Eur. J. Oper. Res..
[32] Chaoyong Zhang,et al. Disassembly line balancing problem using interdependent weights-based multi-criteria decision making and 2-Optimal algorithm , 2018 .
[33] Dong-Ho Lee,et al. Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal , 2011 .
[34] MengChu Zhou,et al. Disassembly Sequence Optimization for Large-Scale Products With Multiresource Constraints Using Scatter Search and Petri Nets , 2016, IEEE Transactions on Cybernetics.
[35] Xin Zhao,et al. Expected energy analysis for industrial process planning problem with fuzzy time parameters , 2011, Comput. Chem. Eng..
[36] Thomas K. L. Tong,et al. Multi-criteria material selections and end-of-life product strategy: Grey relational analysis approach , 2007 .
[37] Z. Binder,et al. Integrated approach for disassembly processes generation and recycling evaluation of an end-of-life product , 2005 .
[38] Chaoyong Zhang,et al. An asynchronous parallel disassembly planning based on genetic algorithm , 2018, Eur. J. Oper. Res..
[39] MengChu Zhou,et al. Dual-Objective Program and Scatter Search for the Optimization of Disassembly Sequences Subject to Multiresource Constraints , 2018, IEEE Transactions on Automation Science and Engineering.
[40] M. Garetti,et al. A tool to estimate materials and manufacturing energy for a product , 2010, Proceedings of the 2010 IEEE International Symposium on Sustainable Systems and Technology.
[41] Katinka Wolter,et al. A Multiobjective Artificial Bee Colony Algorithm based on Decomposition , 2019, IJCCI.
[42] Moez Trigui,et al. A Disassembly Sequence Planning Approach Based on Particle Swarm Optimization , 2017 .
[43] MengChu Zhou,et al. Modeling and Planning for Dual-Objective Selective Disassembly Using and/or Graph and Discrete Artificial Bee Colony , 2019, IEEE Transactions on Industrial Informatics.
[44] Yuehwern Yih,et al. Sustainable Value Recovery of NdFeB Magnets: A Multi-Objective Network Design and Genetic Algorithm , 2018 .
[45] Surendra M. Gupta,et al. A Decision Maker-Centered End-of-Life Product Recovery System for Robot Task Sequencing , 2017, Journal of Intelligent & Robotic Systems.
[46] MengChu Zhou,et al. An integrated approach to disassembly planning and demanufacturing operation , 2001, IEEE Trans. Robotics Autom..
[47] Surendra M. Gupta,et al. Use of MCDM techniques in environmentally conscious manufacturing and product recovery: State of the art , 2015 .
[48] Saeed Mansour,et al. A model for integrating services and product EOL management in sustainable product service system (S-PSS) , 2012, Journal of Intelligent Manufacturing.
[49] M. H. Wang,et al. ECONOMICAL EVALUATION OF DISASSEMBLY OPERATIONS FOR RECYCLING, REMANUFACTURING AND REUSE , 1998 .
[50] Deborah L Thurston,et al. Simultaneous Selective Disassembly and End-of-Life Decision Making for Multiple Products That Share Disassembly Operations , 2010 .
[51] Carl T. Haas,et al. A novel selective disassembly sequence planning method for adaptive reuse of buildings , 2018 .
[52] Xinyu Shao,et al. Mathematical modelling and optimisation of energy-conscious hybrid flow shop scheduling problem with unrelated parallel machines , 2018, Int. J. Prod. Res..
[53] Guangdong Tian,et al. Energy evaluation method and its optimization models for process planning with stochastic characteristics: A case study in disassembly decision-making , 2012, Comput. Ind. Eng..
[54] MengChu Zhou,et al. Design and implementation of an adaptive process planner for disassembly processes , 2000, IEEE Trans. Robotics Autom..
[55] Chaoyong Zhang,et al. An improved gravitational search algorithm for profit-oriented partial disassembly line balancing problem , 2017, Int. J. Prod. Res..
[56] Surendra M. Gupta,et al. Disassembly Sequencing Using Tabu Search , 2016, J. Intell. Robotic Syst..
[57] Dimitris Kiritsis,et al. Multicriteria decision-aid approach for product end-of-life alternative selection , 2004 .
[58] Yixiong Feng,et al. Flexible Process Planning and End-of-Life Decision-Making for Product Recovery Optimization Based on Hybrid Disassembly , 2019, IEEE Transactions on Automation Science and Engineering.
[59] Peihua Gu,et al. Integrated multi-layer representation and ant colony search for product selective disassembly planning , 2016, Comput. Ind..
[60] Joseph W.K. Chan,et al. Product end-of-life options selection: grey relational analysis approach , 2008 .
[61] Surendra M. Gupta,et al. A Robotic-Driven Disassembly Sequence Generator for End-Of-Life Electronic Products , 2012, Journal of Intelligent & Robotic Systems.
[62] Ying Liu,et al. Data-driven ecological performance evaluation for remanufacturing process , 2019, Energy Conversion and Management.
[63] Tsai C. Kuo,et al. Waste electronics and electrical equipment disassembly and recycling using Petri net analysis , 2010, The 40th International Conference on Computers & Indutrial Engineering.
[64] Diala Dhouib,et al. A new multi-criteria approach dealing with dependent and heterogeneous criteria for end-of-life product strategy , 2011, Appl. Math. Comput..
[65] Carlos A. Coello Coello,et al. Solving Multiobjective Optimization Problems Using an Artificial Immune System , 2005, Genetic Programming and Evolvable Machines.
[66] Chaoyong Zhang,et al. An MCDM-Based Multiobjective General Variable Neighborhood Search Approach for Disassembly Line Balancing Problem , 2020, IEEE Transactions on Systems, Man, and Cybernetics: Systems.
[67] E Iakovou,et al. On the optimal design of the disassembly and recovery processes. , 2009, Waste management.
[68] Moez Trigui,et al. Disassembly sequence planning based on a genetic algorithm , 2015 .
[69] Aiman Ziout,et al. A holistic approach for decision on selection of end-of-life products recovery options , 2014 .
[70] Pingyu Jiang,et al. Dynamic scheduling in RFID-driven discrete manufacturing system by using multi-layer network metrics as heuristic information , 2019, J. Intell. Manuf..
[71] Nam Wook Cho,et al. A hierarchical end-of-life decision model for determining the economic levels of remanufacturing and disassembly under environmental regulations , 2010 .