Equipment replacement under technological change
暂无分享,去创建一个
[1] Chung Yee Lee,et al. Error bound for the dynamic lot size model with backlogging , 1991 .
[2] Jack R. Lohmann,et al. A Dynamic Replacement Economy Decision Model , 1984 .
[3] Suresh Chand,et al. Planning Horizon Procedures for Machine Replacement Models , 1979 .
[4] Robert L. Smith,et al. Conditions for the Existence of Planning Horizons , 1984, Math. Oper. Res..
[5] Robert L. Smith,et al. Turnpike Results for Single Location Capacity Expansion , 1979 .
[6] Chung-Yee Lee,et al. Rolling Planning Horizons: Error Bounds for the Dynamic Lot Size Model , 1986, Math. Oper. Res..
[7] Candace Arai Yano,et al. Forecast horizons for the discounted dynamic lot-size problem allowing speculative motive , 1987 .
[8] Suresh Chand,et al. Planning Horizon Procedures for Machine Replacement Models with Several Possible Replacement Alternatives , 1982 .
[9] J. C. Bean,et al. A Dynamic Infinite Horizon Replacement Economy Decision Model , 1984 .
[10] Raymond L. Smith,et al. Rolling Horizon Procedures in Nonhomogeneous Markov Decision Processes , 1992, Oper. Res..
[11] Robert L. Smith,et al. Aggregation in Dynamic Programming , 1987, Oper. Res..
[12] J. C. Bean,et al. Optimal Capacity Expansion Over an Infinite Horizon , 1985 .
[13] Jeremy F. Shapiro,et al. A Finite Renewal Algorithm for the Knapsack and Turnpike Models , 1967, Oper. Res..