A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns"

In a recently published paper by Chiu et al. [Chiu, S.W., Wang, S.-L., Chiu, Y.-S.P., 2007. Determining the optimal run time for EPQ model with scrap, rework and stochastic breakdowns. European Journal of Operational Research 180, 664-676], a theorem on conditional convexity of the integrated total cost function was employed in their solution procedure. We reexamine this theorem and present a direct proof to the convexity of the total cost function. This proof can be used in place of Theorem 1 of Chiu et al.'s paper to enhance quality of their optimization process.

[1]  C. H. Kim,et al.  An optimal production run length in deteriorating production processes , 1999 .

[2]  Y. Chiu Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging , 2003 .

[3]  Kuo-Lung Hou,et al.  An optimal production run time with imperfect production processes and allowable shortages , 2003, Comput. Oper. Res..

[4]  Yuan-Shyi Peter Chiu,et al.  Numerical method for determination of reworking or scraping the defective items in a finite production rate model , 2005 .

[5]  Morton J. M. Posner,et al.  Production-Inventory Systems with Unreliable Machines , 1994, Oper. Res..

[6]  Sudeep Sarkar,et al.  Optimal preventive maintenance in a production inventory system , 1999 .

[7]  Meir J. Rosenblatt,et al.  Simultaneous determination of production cycle and inspection schedules in a production system , 1987 .

[8]  Jerome S. Osteryoung,et al.  Use of the EOQ model for inventory analysis , 1986 .

[9]  P. A. Hayek,et al.  Production lot sizing with the reworking of imperfect quality items produced , 2001 .

[10]  Frederick S. Hillier,et al.  Introduction of Operations Research , 1967 .

[11]  S. W. Chiu,et al.  Effects of random defective rate and imperfect rework process on economic production quantity model , 2004 .

[12]  David F. Pyke,et al.  Inventory management and production planning and scheduling , 1998 .

[13]  Kun-Jen Chung Bounds for production lot sizing with machine breakdowns , 1997 .

[14]  Philippe Solot,et al.  Do not forget the breakdowns and the maintenance operations in FMS design problems , 1990 .

[15]  Panganamala Ramana Kumar,et al.  Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems , 1988, Oper. Res..

[16]  T.C.E. Cheng,et al.  An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes , 1991 .

[17]  Ford W. Harris,et al.  How Many Parts to Make at Once , 1990, Oper. Res..

[18]  A. Seidmann,et al.  Production lot sizing with machine breakdowns , 1992 .

[19]  Kun-Jen Chung,et al.  Approximations to production lot sizing with machine breakdowns , 2003, Comput. Oper. Res..

[20]  Meir J. Rosenblatt,et al.  Economic Production Cycles with Imperfect Production Processes , 1986 .

[21]  Bin Liu,et al.  Analysis of a production-inventory system with machine breakdowns and shutdowns , 1999 .