Chapter 7 An overview of production planning

Publisher Summary This chapter discusses practical problems related to the use of OR tools for production planning. The chapter reviews production planning, in which at least one of the following three items is viewed in an aggregated manner: production facilities, products, or time unit. There are several plans made at different levels of aggregation, using different planning horizons. Thus, many different models have been discussed. Several different production-planning environments and the type of models that are appropriate have been analyzed. A plethora of recent optimization-type models for production planning has been reviewed. Production planning must determine the planned level of production for each aggregate product category, in each time period during the planning horizon. Hierarchical production planning research analyzes ways to develop a set of models often including an aggregate planning model, so that the output from a higher level model provides good (or even optimal) input to the lower planning level. The three different levels production plannings––production planning, master production scheduling, and material and capacity (detailed) plans––have been discussed in the chapter.

[1]  Sven Axsäter,et al.  Aggregation of Product Data for Hierarchical Production Planning , 1981, Oper. Res..

[2]  Joseph M. Mellichamp,et al.  Production Switching Heuristics for the Aggregate Planning Problem , 1978 .

[3]  Khalil S. Hindi,et al.  Aggregate Capacitated Lot-Size Scheduling for a Class of Flexible Machining and Assembly Systems , 1991 .

[4]  Wlodzimierz Szwarc,et al.  A Transportation Type Aggregate Production Model with Backordering , 1983 .

[5]  Harvey M. Wagner,et al.  The Accuracy of Aggregate LP Production Planning Models , 1993 .

[6]  B. P. Dzielinski,et al.  Simulation Tests of Lot Size Programming , 1963 .

[7]  Lee J. Krajewski,et al.  Disaggregation in manufacturing and service organizations: survey of problems and research , 1977 .

[8]  Everett E. Adam,et al.  Aggregate planning in health care foodservice systems with varying technologies , 1984 .

[9]  Umit Akinc,et al.  A New Approach to Aggregate Production Planning , 1986 .

[10]  Yasser A. Hosni,et al.  Capacity planning in job-shop environment , 1987 .

[11]  D. Sterman,et al.  Misperceptions of Feedback in a Dynamic Decision Making Experiment , 1989 .

[12]  J. O. McClain,et al.  Horizon Effects in Aggregate Production Planning with Seasonal Demand , 1977 .

[13]  Louis W. Miller Using Linear Programming to Derive Planning Horizons for a Production Smoothing Problem , 1979 .

[14]  E. H. Bowman Consistency and Optimality in Managerial Decision Making , 1963 .

[15]  Hanif D. Sherali,et al.  An integer programming approach and implementation for an electric utility capacity planning problem with renewable energy sources , 1987 .

[16]  Gabriel R. Bitran,et al.  Hierarchical Production Planning: A Two-Stage System , 1982, Oper. Res..

[17]  Ludo Gelders,et al.  Production planning: a review , 1981 .

[18]  Herbert Moskowitz,et al.  The Value of Information in Aggregate Production Planning—A Behavioral Experiment , 1972 .

[19]  Luk N. Van Wassenhove,et al.  Multi Item Single Level Capacitated Dynamic Lotsizing Heuristics: A Computational Comparison (Part I: Static Case) , 1986 .

[20]  Evan L. Porteus,et al.  Setup reduction and increased effective capacity , 1987 .

[21]  David A. Goodman,et al.  A Goal Programming Approach to Aggregate Planning of Production and Work Force , 1974 .

[22]  Luk N. Van Wassenhove,et al.  Capacitated Lot Sizing for Injection Moulding: A Case Study , 1983 .

[23]  J. C. Bean,et al.  Optimal Capacity Expansion Over an Infinite Horizon , 1985 .

[24]  R. Ebert Aggregate Planning with Learning Curve Productivity , 1976 .

[25]  Norman L. Chervany,et al.  An Experimental Evaluation of Information Overload in a Production Environment , 1974 .

[26]  Joseph D. Blackburn,et al.  Improved heuristics for multistage requirements planning systems , 1982 .

[27]  Ulf Peter Welam,et al.  Multi-Item Production Smoothing Models with Almost Closed Form Solutions , 1975 .

[28]  Jeffrey Miller Hedging the master schedule , 1979 .

[29]  T. Morton,et al.  General Planning Horizons for Production Smoothing with Deterministic Demands , 1974 .

[30]  Harvey M. Wagner,et al.  Algorithms for Optimal Production Scheduling and Employment Smoothing , 1967, Oper. Res..

[31]  R. Leitch Marketing Strategy and the Optimal Production Schedule , 1974 .

[32]  Basheer M. Khumawala,et al.  Aggregate versus disaggregate production planning: a simulated experiment using LDR and MRP , 1983 .

[33]  Leroy B. Schwarz,et al.  An Appraisal of the Empirical Performance of the Linear Decision Rule for Aggregate Planning , 1978 .

[34]  Ludo Gelders,et al.  Coordinating Aggregate and Detailed Scheduling in the One-Machine Job Shop: II - Computation and Structure , 1975, Oper. Res..

[35]  Moheb A. Ghali Seasonality, Aggregation and the Testing of the Production Smoothing Hypothesis , 1987 .

[36]  Timothy L. Shaftel,et al.  A Mathematical Programming Approach to Production Decisions in the Emerging Aquaculture Industry , 1991 .

[37]  Richard A. Ashley,et al.  Further Results on Inventories and Price Stickiness , 1985 .

[38]  Richard F. Deckro,et al.  Goal Programming Approaches to Solving Linear Decision Rule Based Aggregate Production Planning Models , 1984 .

[39]  William L. Berry,et al.  AN ANALYSIS OF CAPACITY PLANNING PROCEDURES FOR A MATERIAL REQUIREMENTS PLANNING SYSTEM , 1984 .

[40]  M. Cooper,et al.  Customer Service: A Management Perspective , 1988 .

[41]  David A. Goodman,et al.  A New Approach to Scheduling Aggregate Production and Workforce , 1973 .

[42]  Roger C. Vergin,et al.  Note-On A New Look at Production Switching Heuristics for the Aggregate Planning Problem , 1980 .

[43]  Edward A. Silver,et al.  A Tutorial on Production Smoothing and Work Force Balancing , 1967, Oper. Res..

[44]  William L. Berry,et al.  MEASURING MASTER PRODUCTION SCHEDULE STABILITY UNDER ROLLING PLANNING HORIZONS , 1988 .

[45]  Chen-Hua Chung,et al.  Planning horizons for master production scheduling , 1984 .

[46]  Ulf Peter Welam,et al.  An HMMS Type Interactive Model for Aggregate Planning , 1978 .

[47]  Michael D. Oliff,et al.  A DISCRETE PRODUCTION SWITCHING RULE FOR AGGREGATE PLANNING , 1987 .

[48]  William W. Trigeiro,et al.  Capacitated lot sizing with setup times , 1989 .

[49]  Charles H. Kriebel Coefficient Estimation in Quadratic Programming Models , 1967 .

[50]  Leon S. Lasdon,et al.  An Efficient Algorithm for Multi-Item Scheduling , 1971, Oper. Res..

[51]  Gabriel R. Bitran,et al.  Hierarchical Production Planning: A Single Stage System , 1981, Oper. Res..

[52]  Sidney W. Hess,et al.  A Linear Programming Approach to Production and Employment Scheduling , 1960 .

[53]  William L. Berry,et al.  Manufacturing Planning and Control Systems , 1984 .

[54]  Pakorn Adulbhan,et al.  An aggregate production planning for a heavy manufacturing industry , 1981 .

[55]  T. S. Lee,et al.  AN EVALUATION OF FORECAST ERROR IN MASTER PRODUCTION SCHEDULING FOR MATERIAL REQUIREMENTS PLANNING SYSTEMS. , 1987 .

[56]  Charles M. Jones,et al.  Production and Workforce Scheduling Extensions , 1970 .

[57]  James R. Evans,et al.  Aggregation and Disaggregation Techniques and Methodology in Optimization , 1991, Oper. Res..

[58]  B. P. Dzielinski,et al.  Optimal Programming of Lot Sizes, Inventory and Labor Allocations , 1965 .

[59]  Terry Williams,et al.  Operations Management: Production of Goods and Services , 1980 .

[60]  G. Gaalman Optimal Aggregation of Multi-Item Production Smoothing Models , 1978 .

[61]  C. C. Holt,et al.  Planning Production, Inventories, and Work Force. , 1962 .

[62]  Hanan Luss,et al.  Operations Research and Capacity Expansion Problems: A Survey , 1982, Oper. Res..

[63]  Samuel Gorenstein,et al.  Planning Tire Production , 1970 .

[64]  Hector Guerrero Demand management strategies for assemble-to-order production environments , 1991 .

[65]  Sven Axsäter,et al.  Technical Note - On the Feasibility of Aggregate Production Plans , 1986, Oper. Res..

[66]  M. G. Korgaonker Production Smoothing Under Piecewise Concave Costs, Capacity Constraints and Nondecreasing Requirements , 1977 .

[67]  Robert C. Leachman,et al.  A general framework for modeling production , 1989 .

[68]  L. J. Thomas,et al.  Heuristics for multilevel lot-sizing with a bottleneck , 1986 .

[69]  Asher Tishler,et al.  Time Step vs. Dynamic Optimization of Generation-Capacity-Expansion Programs of Power Systems , 1983, Oper. Res..

[70]  William L. Maxwell,et al.  Establishing Consistent and Realistic Reorder Intervals in Production-Distribution Systems , 1985, Oper. Res..

[71]  Laurence A. Wolsey,et al.  Multi-item lot-sizing problems using strong cutting planes , 1991 .

[72]  Kenneth R. Baker,et al.  The effects of input control in a simple scheduling model , 1984 .

[73]  Robert L. Smith,et al.  Conditions for the Existence of Planning Horizons , 1984, Math. Oper. Res..

[74]  A. Blinder Can the Production Smoothing Model of Inventory Behavior Be Saved? , 1986 .

[75]  Arnoldo C. Hax,et al.  Production and inventory management , 1983 .

[76]  F. Hohn,et al.  Production Planning Over Time and the Nature of the Expectation and Planning Horizon , 1955 .

[77]  William L. Maxwell,et al.  A Modeling Framework for Planning and Control of Production in Discrete Parts Manufacturing and Assembly Systems , 1983 .

[78]  R. Kaplan Measuring manufacturing performance: a new challenge for managerial accounting research , 1983 .

[79]  L. V. Wassenhove,et al.  Some extensions of the discrete lotsizing and scheduling problem , 1991 .

[80]  L. J. Thomas,et al.  Efficient Solutions to a Linear Programming Model for Production Scheduling With Capacity Constraints and No Initial Stock , 1989 .

[81]  Thomas H. Johnson,et al.  Relevance Lost: The Rise and Fall of Management Accounting , 1987 .

[82]  Stephen D. Burd,et al.  Logic-based decision support for computer capacity planning , 1987, Inf. Manag..

[83]  Kenneth R. Baker,et al.  A SIMULTANEOUS PLANNING MODEL FOR PRODUCTION AND WORKING CAPITAL , 1977 .

[84]  W. Taubert A Search Decision Rule for the Aggregate Scheduling Problem , 1968 .

[85]  W. Damon,et al.  A Simultaneous Decision Model for Production, Marketing and Finance , 1972 .

[86]  Michael D. Oliff,et al.  Multiproduct Production Scheduling at Owens-Corning Fiberglas , 1985 .

[87]  A. Federgruen,et al.  A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in 0n log n or 0n Time , 1991 .

[88]  S. Graves Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems , 1982 .

[89]  K. West A Variance Bounds Test of the Linear Quadratic Inventory Model , 1985, Journal of Political Economy.

[90]  Harvey M. Wagner,et al.  Optimal Production Scheduling and Employment Smoothing with Deterministic Demands , 1967 .

[91]  Gerald L. Thompson,et al.  A forward algorithm and planning horizon procedure for the production smoothing problem without inventory , 1984 .

[92]  Joseph Thomas,et al.  Linear Programming Models for Production-Advertising Decisions , 1971 .

[93]  Christoph Haehling von Lanzenauer Production and employment scheduling in multistage production systems , 1970 .

[94]  Gabriel R. Bitran,et al.  ON THE DESIGN OF HIERARCHICAL PRODUCTION PLANNING SYSTEMS , 1977 .

[95]  H. C. Meal,et al.  Material requirements planning in hierarchical production planning systems , 1987 .

[96]  Kim B. Clark,et al.  Explaining Observed Productivity Differentials Between Plants: Implications for Operations Research , 1985 .

[97]  Vincent A. Mabert,et al.  Cyclical schedules for capacitated lot sizing with dynamic demands , 1991 .

[98]  F. J. Gould,et al.  Extensions of the Planning Horizon Theorem in the Dynamic Lot Size Model , 1969 .

[99]  John Freidenfelds,et al.  Capacity expansion: Analysis of simple models with applications , 1981 .

[100]  Behrokh Khoshnevis,et al.  A short-cycle product aggregate planning model incorporating improvement curve productivity , 1986 .

[101]  Behrokh Khoshnevis,et al.  An Aggregate Production Planning Model Incorporating Dynamic Productivity: Part I. Model Development , 1983 .

[102]  Uday S. Karmarkar,et al.  Research in Manufacturing Strategy: A Cross-Functional Perspective , 1993 .

[103]  Herbert A. Simon,et al.  The Control of Inventories and Production Rates - A Survey , 1954, Oper. Res..

[104]  H. Simon,et al.  Dynamic Programming Under Uncertainty with a Quadratic Criterion Function , 1956 .

[105]  Robert C. Leachman,et al.  A Dynamic Programming Solution to the Dynamic, Multi-Item, Single-Machine Scheduling Problem , 1988, Oper. Res..

[106]  Basheer M. Khumawala,et al.  Simulation Testing of Aggregate Production Planning Models in an Implementation Methodology , 1974 .

[107]  Paul R. Kleindorfer,et al.  Algorithms and Planning Horizon Results for Production Planning Problems with Separable Costs , 1979, Oper. Res..

[108]  John O. McClain,et al.  Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction , 1983 .

[109]  Behrokh Khoshnevis,et al.  An Aggregate Production Planning Model Incorporating Dynamic Productivity: Part II. Solution Methodology and Analysis , 1983 .

[110]  Dwight R. Lee,et al.  Further Results on Planning Horizons in the Production Smoothing Problem , 1977 .

[111]  W. H. Hausman,et al.  A Note on the Bergstrom-Smith Multi-Item Production Planning Model , 1971 .

[112]  John Sharp,et al.  Demand Forecasting and Aggregate Planning in the Electrical Supply Industry , 1984 .

[113]  V. Mabert,et al.  Quadratic Inventory Cost Approximations and the Aggregation of Individual Products , 1973 .

[114]  B. J. Davies,et al.  An Analysis of the Overtime Decision , 1982 .

[115]  E. H. Bowman Production Scheduling by the Transportation Method of Linear Programming , 1956 .

[116]  Robert S. Kaplan,et al.  One Cost System Isn't Enough , 1988 .

[117]  Arnoldo C. Hax,et al.  Hierarchical integration of production planning and scheduling , 1973 .

[118]  Paul H. Zipkin Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem , 1991, Oper. Res..

[119]  Hans-Otto Günther,et al.  A comparison of two classes of aggregate production planning models under stochastic demand , 1982 .

[120]  Samuel G. Davis Scheduling Economic Lot Size Production Runs , 1990 .

[121]  Kenneth R. Baker,et al.  AN EXPERIMENTAL STUDY OF THE EFFECTIVENESS OF ROLLING SCHEDULES IN PRODUCTION PLANNING , 1977 .

[122]  Gabriel R. Bitran,et al.  Production Planning of Style Goods with High Setup Costs and Forecast Revisions , 1986, Oper. Res..

[123]  Robin O. Roundy,et al.  A Price-Directed Approach to Real-Time Scheduling of Production Operations , 1991 .

[124]  Bezalel Gavish,et al.  Optimal Lot-Sizing Algorithms for Complex Product Structures , 1986, Oper. Res..

[125]  L. J. Thomas,et al.  STOCKLESS AND FAST PRODUCTION: REVIEW AND RESEARCH AGENDA , 1993 .

[126]  Colin E. Bell Maintaining project networks in automated artificial intelligence planning , 1989 .

[127]  James A. Kahn Inventories and the volatility of production , 1986 .

[128]  Abraham Charnes,et al.  A MODEL FOR OPTIMIZING PRODUCTION BY REFERENCE TO COST SURROGATES , 1955 .

[129]  H. B. Voelcker,et al.  Computer applications in manufacturing , 1988 .

[130]  R. Peterson,et al.  Optimal Smoothing of Shipments in Response to Orders , 1971 .

[131]  S. Eilon Five Approaches to Aggregate Production Planning , 1975 .

[132]  Luk N. Van Wassenhove,et al.  Hierarchical integration in production planning: Theory and practice , 1982 .

[133]  Curtis H. Jones Parametric Production Planning , 1967 .