Simulations for the FEL Test Facility at MAX-lab within EUROFEL

Within the EUROFEL project an HGHG FEL will be constructed at MAX-lab in collaboration with BESSY. To predict FEL performance and stability, simulations of the photo injector, linac, recirculator, transport and undulator sections that comprises the injector FEL, has been carried out. A first step of start-to-end simulations with preliminary results will also be presented.