A Note on the Expected Time Required to Construct the Outer Layer
暂无分享,去创建一个
[1] Michael Ian Shamos,et al. Divide and Conquer for Linear Expected Time , 1978, Inf. Process. Lett..
[2] F. P. Preparata,et al. Convex hulls of finite sets of points in two and three dimensions , 1977, CACM.
[3] Ronald L. Graham,et al. An Efficient Algorithm for Determining the Convex Hull of a Finite Planar Set , 1972, Inf. Process. Lett..
[4] H. T. Kung,et al. On the Average Number of Maxima in a Set of Vectors and Applications , 1978, JACM.
[5] M. Shamos. Problems in computational geometry , 1975 .