Applying the activity-based costing to cut-to-length timber harvesting and trucking.
暂无分享,去创建一个
[1] Timo Pirttilä,et al. Activity-based costing and distribution logistics management , 1995 .
[2] Torbjörn Brunberg,et al. Vad kostar det att sortera virket i skogen , 2001 .
[3] Julio Eduardo Arce,et al. A Forest-Level Bucking Optimization System that Considers Customer's Demand and Transportation Costs , 2002 .
[4] Jaakko Heinonen,et al. Characteristics and time consumption of timber trucking in Finland , 2007 .
[5] Dominik Röser,et al. Cost competitiveness of harwarders in CTL-logging conditions in Finland - a discrete-event simulation study at the contractor level , 2006 .
[6] R. Kaplan,et al. Time-driven activity-based costing. , 2003, Harvard business review.
[7] Jori Uusitalo,et al. Time consumption analysis of the mechanized cut-to-length harvesting system , 2006 .
[8] Peter B. B. Turney,et al. Common cents : the ABC performance breakthrough : how to succeed with activity-based costing , 1991 .
[9] Jori Uusitalo. A Framework for CTL Method-Based Wood Procurement Logistics , 2005 .
[10] H. Vermaas,et al. A management accounting system in sawmilling using activity based costing techniques , 1998 .
[11] Patrick Matthew Rappold. Activity-based product costing in a hardwood sawmill through the use of discrete-event simulation , 2006 .
[12] J. Lere. Activity‐based costing: a powerful tool for pricing , 2000 .
[13] Teijo Palander,et al. Impacts of interenterprise collaboration and backhauling on wood procurement in Finland , 2005 .