A fuzzy due-date bargainer for the make-to-order manufacturing systems

For a make-to-order manufacturing system, the uncertainty and flexibility of the due dates required by customers and the production capacity owned by the manufacturer can be modeled in a fuzzy environment. A combined due-date assignment and production planning methodology for the make-to-order manufacturing systems is developed. The fuzzy approach determines the optimal due dates for the manufacturer based upon a "rough-cut" resource balance, while a customer can request earlier due dates by paying a higher price to cover the extra manufacturing cost incurred. The resulting fuzzy due-date bargainer is exercised using manufacturing resource planning (MRP-II) data from a furniture manufacturing company. Experimental results indicate its potential as a useful tool for real applications.

[1]  Richard Bellman,et al.  Decision-making in fuzzy environment , 2012 .

[2]  J. A. Muckstadt,et al.  An approach to production planning and scheduling in cyclically scheduled manufacturing systems , 1994 .

[3]  Hans-Jürgen Zimmermann,et al.  Fuzzy Set Theory - and Its Applications , 1985 .

[4]  Ching-Lai Hwang,et al.  Fuzzy Mathematical Programming , 1992 .

[5]  T.C.E. Cheng,et al.  Survey of scheduling research involving due date determination decisions , 1989 .

[6]  Gary D. Scudder,et al.  Sequencing with Earliness and Tardiness Penalties: A Review , 1990, Oper. Res..

[7]  Prabuddha De,et al.  Scheduling to minimize weighted earliness and tardiness about a common due-date , 1991, Comput. Oper. Res..

[8]  T.C.E. Cheng,et al.  Parallel-Machine Scheduling Problems with Earliness and Tardiness Penalties , 1994 .

[9]  T.C.E. Cheng,et al.  A Heuristic for Common Due-date Assignment and Job Scheduling on Parallel Machines , 1989 .

[10]  Thom J. Hodgson,et al.  Optimal hybrid push/pull control strategies for a parallel multistage system: Part II , 1991 .

[11]  Abraham Seidmann,et al.  Due Date Assignment for Production Systems , 1981 .

[12]  Dingwei Wang Earliness/tardiness production planning approaches for manufacturing systems , 1995 .

[13]  S. S. Panwalkar,et al.  Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem , 1982, Oper. Res..

[14]  Y. Sugimori,et al.  Toyota production system and Kanban system Materialization of just-in-time and respect-for-human system , 1977 .

[15]  Sdp Simme Douwe Flapper,et al.  Embedding JIT into MRP , 1991 .