Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction

Abstract Robust supply decision making is critical to the advanced manufacturing of prefabricated products. Previous related research focused on minimizing cost overruns in off-site construction supply networks by optimizing purchasing decisions. However, decision parameters such as strategic preferences to include or exclude certain suppliers and utilization of multi-supplier configurations are yet to be formulated and analytically solved. The proposed optimization models aim to enhance supply network performance with a smaller overall investment. Toward this aim, three research hypotheses on optimization of supply decisions and configurations are developed and tested. A real-world precast panel production project serves as the test bed to demonstrate the effectiveness of the mathematical programming and analyze cost implications of supply related decisions. The modeling method and results contribute to optimal decision making in advanced manufacturing of prefabricated products.

[1]  Iris D. Tommelein,et al.  Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain , 2004 .

[2]  M. Naim,et al.  An innovative supply chain strategy for customized housing , 2003 .

[3]  M. Skibniewski,et al.  Supply chain optimization tool for purchasing decisions in B2B construction marketplaces , 2007 .

[4]  Mehrdad Arashpour,et al.  Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction , 2016 .

[5]  C Vidalakis,et al.  Demand uncertainty in construction supply chains: a discrete event simulation study , 2013, J. Oper. Res. Soc..

[6]  Keith W. Hipel,et al.  Supplier selection process in an integrated construction materials management model , 2014 .

[7]  Anne-Françoise Cutting-Decelle,et al.  A review of approaches to supply chain communications: from manufacturing to construction , 2007, J. Inf. Technol. Constr..

[8]  Wei Pan,et al.  Major Barriers to Off-Site Construction: The Developer’s Perspective in China , 2015 .

[9]  Iris D. Tommelein,et al.  Value stream analysis of a re-engineered construction supply chain , 2003 .

[10]  Mehrdad Arashpour,et al.  Valuing the contribution of knowledge-oriented workers to projects: a merit based approach in the construction industry , 2012 .

[11]  Bonsang Koo,et al.  Formulation of a pull production system for optimal inventory control of temporary rebar assembly plants , 2009 .

[12]  Mehrdad Arashpour,et al.  Hybrid simulation modeling of hoist down-peak operations in construction sites , 2016 .

[13]  Thais da C. L. Alves,et al.  Analyzing Effective Supplier-Quality-Management Practices Using Simple Multiattribute Rating Technique and Value-Focused Thinking , 2016 .

[14]  A. Fearne,et al.  Efficiency versus effectiveness in construction supply chains: the dangers of “lean” thinking in isolation , 2006 .

[15]  Mehrdad Arashpour,et al.  Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings , 2015 .

[16]  M. Pearson,et al.  Prioritizing edge over node: process control in supply chain networks and push-pull strategies , 2008, J. Oper. Res. Soc..

[17]  I-Tung Yang,et al.  Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding , 2005 .

[18]  David Arditi,et al.  Economics of on‐site vs. off‐site fabrication of rebar , 2006 .

[19]  Mehrdad Arashpour,et al.  Single capstone or multiple cornerstones? Distributed model of capstone subjects in construction education , 2015 .

[20]  Janis Grabis,et al.  Supply chain configuration , 2007 .

[21]  Sindu Satasivam,et al.  Mechanical performance of bolted modular GFRP composite sandwich structures using standard and blind bolts , 2014 .

[22]  Seung Heon Han,et al.  Supply chain cost model for prefabricated building material based on time-driven activity-based costing , 2016 .

[23]  Keith W. Hipel,et al.  Construction contract management using value packaging systems , 2017 .

[24]  Derek Rayside,et al.  Optimizing Contractor Selection for Construction Packages in Capital Projects , 2016 .

[25]  Mehrdad Arashpour,et al.  A new approach for modelling variability in residential construction projects , 2013 .

[26]  Mehrdad Arashpour,et al.  Quantitative Analysis of Rate-Driven and Due Date–Driven Construction: Production Efficiency, Supervision, and Controllability in Residential Projects , 2016 .

[27]  Mehrdad Arashpour,et al.  Optimization of process integration and multi-skilled resource utilization in off-site construction , 2015 .

[28]  David R. Riley,et al.  Decision support for construction method selection in concrete buildings: Prefabrication adoption and optimization , 2010 .

[29]  Sang-Chan Park,et al.  An effective supplier selection method for constructing a competitive supply-relationship , 2005, Expert Syst. Appl..

[30]  Z. H. Che,et al.  Supplier selection and supply quantity allocation of common and non-common parts with multiple criteria under multiple products , 2008, Comput. Ind. Eng..

[31]  Ka Chi Lam,et al.  A material supplier selection model for property developers using Fuzzy Principal Component Analysis , 2010 .

[32]  R. Edward Minchin,et al.  Sino-American Opinions and Perceptions of Counterfeiting in the Construction Supply Chain , 2013 .

[33]  Mehrdad Arashpour,et al.  Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources , 2018 .

[34]  Chi Sun Poon,et al.  The evolution of prefabricated residential building systems in Hong Kong: A review of the public and the private sector , 2009 .

[35]  A. Weele Purchasing and Supply Chain Management: Analysis, Strategy, Planning and Practice , 2009 .

[36]  Eric Wai Ming Lee,et al.  A fully autonomous kernel-based online learning neural network model and its application to building cooling load prediction , 2014, Soft Comput..

[37]  Roberto Cigolini,et al.  Linking supply chain configuration to supply chain perfrmance: A discrete event simulation model , 2014, Simul. Model. Pract. Theory.

[38]  Peter E.D. Love,et al.  A seamless supply chain management model for construction , 2004 .

[39]  Esin Ergen,et al.  Analyzing the benefits of RFID technology for cost sharing in construction supply chains: A case study on prefabricated precast components , 2012 .

[40]  Yu Bai,et al.  Mechanical performance of modular FRP-steel composite beams for building construction , 2016 .

[41]  Mehrdad Arashpour,et al.  Integrated management of on-site, coordination and off-site uncertainty: Theorizing risk analysis within a hybrid project setting , 2017 .

[42]  Andreas Eggert,et al.  Value-Based Differentiation in Business Relationships: Gaining and Sustaining Key Supplier Status , 2006 .

[43]  Hui Lu,et al.  Construction Material Safety-Stock Determination Under Nonstationary Stochastic Demand and Random Supply Yield , 2016, IEEE Transactions on Engineering Management.

[44]  Mehdi Bijari,et al.  Effects of imperfect products on lot sizing with work in process inventory , 2011, Appl. Math. Comput..

[45]  Seyed Mojib Zahraee,et al.  System dynamics model for optimizing the recycling and collection of waste material in a closed-loop supply chain , 2015, Simul. Model. Pract. Theory.

[46]  B. L. M. Mwamila,et al.  Semi-prefabrication concrete techniques in developing countries , 1999 .

[47]  S. Thomas Ng,et al.  A parallel bargaining protocol for automated sourcing of construction suppliers , 2006 .

[48]  Mehrdad Arashpour,et al.  Autonomous production tracking for augmenting output in off-site construction , 2015 .

[49]  David K. H. Chua,et al.  IFC-Based Framework to Move beyond Individual Building Elements toward Configuring a Higher Level of Prefabrication , 2013 .

[50]  H. Stadtler Supply Chain Management: An Overview , 2015 .

[51]  R Morledge,et al.  The Concept and Development of Supply Chain Management in the UK Construction Industry , 2009 .

[52]  Margaret K.Y. Mok,et al.  Schedule risks in prefabrication housing production in Hong Kong: a social network analysis , 2016 .

[53]  Najla Aissaoui,et al.  Supplier selection and order lot sizing modeling: A review , 2007, Comput. Oper. Res..

[54]  Johannes T. Voordijk,et al.  The concept of modularity in supply chains : A multiple case-study in the construction industry , 2006 .

[55]  Niclas Björngrim,et al.  Need for innovation in supplying engineer‐to‐order joinery products to construction: A case study in Sweden , 2012 .

[56]  Hans C. Bjornsson,et al.  Agent-based construction supply chain simulator (CS2) for measuring the value of real-time information sharing in construction , 2008 .

[57]  Andrew R.J. Dainty,et al.  Subcontractor perspectives on supply chain alliances , 2001 .

[58]  Stuart Tennant,et al.  Theory to practice: A typology of supply chain management in construction , 2014 .

[59]  Mehrdad Arashpour,et al.  Analysis of disruptions caused by construction field rework on productivity in residential projects , 2014 .

[60]  Shujian Ma,et al.  Differential Dynamic Evolutionary Model of Emergency Financial Service Supply Chain in Natural Disaster Risk Management , 2016 .

[61]  Mehrdad Arashpour,et al.  Off-site construction optimization: sequencing multiple job classes with time constraints , 2016 .

[62]  Mehrdad Arashpour,et al.  Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production , 2014 .

[63]  Anil Sawhney,et al.  Cost of Risk Transfer: Pricing Agreements in Residential Supply Chains , 2004 .

[64]  Mehrdad Arashpour,et al.  Enhancing collaboration in BIM-based construction networks through organisational discontinuity theory: a case study of the new Royal Adelaide Hospital , 2016 .

[65]  Mehrdad Arashpour,et al.  Developing an uncertainty analysis model for off-site building production , 2015 .

[66]  Leonhard E. Bernold,et al.  Success of Supplier Alliances for Capital Projects , 2005 .

[67]  William J. O'Brien,et al.  Rapid assessment and selection of engineered equipment suppliers , 2012 .

[68]  R. HeikkilÃ,et al.  BIM Based Schedule Control for Precast Concrete Supply Chain , 2014 .

[69]  Malik M A Khalfan SUPPLY CHAIN INTEGRATION THROUGH INNOVATIVE PROCUREMENT , 2011 .

[70]  Mehrdad Arashpour,et al.  Application of Nonlinear-Autoregressive-Exogenous model to predict the hysteretic behaviour of passive control systems , 2015 .

[71]  Mohamed Mohamed Naim,et al.  Identifying and Categorizing the Sources of Uncertainty in Construction Supply Chains , 2013 .

[72]  Ron Wakefield,et al.  Concrete prefabricated housing via advances in systems technologies: development of a technology roadmap , 2010 .

[73]  Jean Jingying Liu Inventory control through a CONWIP pull production system , 2010 .

[74]  Wallace J. Hopp,et al.  Mitigating the Impact of Disruptions in Supply Chains , 2011 .

[75]  Andrew R.J. Dainty,et al.  Strategies for integrating the use of off-site production technologies in house building , 2012 .

[76]  Peter E.D. Love,et al.  A model for supporting inter-organizational relations in the supply chain , 2002 .

[77]  Ray Y. Zhong,et al.  Production lead-time hedging and coordination in prefabricated construction supply chain management , 2017, Int. J. Prod. Res..