Optimizing decisions in advanced manufacturing of prefabricated products: Theorizing supply chain configurations in off-site construction
暂无分享,去创建一个
Mehrdad Arashpour | Alireza Bab-Hadiashar | Guillermo Aranda-Mena | Yu Bai | Reza Hosseini | P Kalutara | A. Bab-Hadiashar | G. Aranda-Mena | M. Arashpour | P. Kalutara | Yu Bai | Reza Hosseini | Mehrdad Arashpour
[1] Iris D. Tommelein,et al. Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain , 2004 .
[2] M. Naim,et al. An innovative supply chain strategy for customized housing , 2003 .
[3] M. Skibniewski,et al. Supply chain optimization tool for purchasing decisions in B2B construction marketplaces , 2007 .
[4] Mehrdad Arashpour,et al. Analysis of interacting uncertainties in on-site and off-site activities: Implications for hybrid construction , 2016 .
[5] C Vidalakis,et al. Demand uncertainty in construction supply chains: a discrete event simulation study , 2013, J. Oper. Res. Soc..
[6] Keith W. Hipel,et al. Supplier selection process in an integrated construction materials management model , 2014 .
[7] Anne-Françoise Cutting-Decelle,et al. A review of approaches to supply chain communications: from manufacturing to construction , 2007, J. Inf. Technol. Constr..
[8] Wei Pan,et al. Major Barriers to Off-Site Construction: The Developer’s Perspective in China , 2015 .
[9] Iris D. Tommelein,et al. Value stream analysis of a re-engineered construction supply chain , 2003 .
[10] Mehrdad Arashpour,et al. Valuing the contribution of knowledge-oriented workers to projects: a merit based approach in the construction industry , 2012 .
[11] Bonsang Koo,et al. Formulation of a pull production system for optimal inventory control of temporary rebar assembly plants , 2009 .
[12] Mehrdad Arashpour,et al. Hybrid simulation modeling of hoist down-peak operations in construction sites , 2016 .
[13] Thais da C. L. Alves,et al. Analyzing Effective Supplier-Quality-Management Practices Using Simple Multiattribute Rating Technique and Value-Focused Thinking , 2016 .
[14] A. Fearne,et al. Efficiency versus effectiveness in construction supply chains: the dangers of “lean” thinking in isolation , 2006 .
[15] Mehrdad Arashpour,et al. Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings , 2015 .
[16] M. Pearson,et al. Prioritizing edge over node: process control in supply chain networks and push-pull strategies , 2008, J. Oper. Res. Soc..
[17] I-Tung Yang,et al. Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding , 2005 .
[18] David Arditi,et al. Economics of on‐site vs. off‐site fabrication of rebar , 2006 .
[19] Mehrdad Arashpour,et al. Single capstone or multiple cornerstones? Distributed model of capstone subjects in construction education , 2015 .
[20] Janis Grabis,et al. Supply chain configuration , 2007 .
[21] Sindu Satasivam,et al. Mechanical performance of bolted modular GFRP composite sandwich structures using standard and blind bolts , 2014 .
[22] Seung Heon Han,et al. Supply chain cost model for prefabricated building material based on time-driven activity-based costing , 2016 .
[23] Keith W. Hipel,et al. Construction contract management using value packaging systems , 2017 .
[24] Derek Rayside,et al. Optimizing Contractor Selection for Construction Packages in Capital Projects , 2016 .
[25] Mehrdad Arashpour,et al. A new approach for modelling variability in residential construction projects , 2013 .
[26] Mehrdad Arashpour,et al. Quantitative Analysis of Rate-Driven and Due Date–Driven Construction: Production Efficiency, Supervision, and Controllability in Residential Projects , 2016 .
[27] Mehrdad Arashpour,et al. Optimization of process integration and multi-skilled resource utilization in off-site construction , 2015 .
[28] David R. Riley,et al. Decision support for construction method selection in concrete buildings: Prefabrication adoption and optimization , 2010 .
[29] Sang-Chan Park,et al. An effective supplier selection method for constructing a competitive supply-relationship , 2005, Expert Syst. Appl..
[30] Z. H. Che,et al. Supplier selection and supply quantity allocation of common and non-common parts with multiple criteria under multiple products , 2008, Comput. Ind. Eng..
[31] Ka Chi Lam,et al. A material supplier selection model for property developers using Fuzzy Principal Component Analysis , 2010 .
[32] R. Edward Minchin,et al. Sino-American Opinions and Perceptions of Counterfeiting in the Construction Supply Chain , 2013 .
[33] Mehrdad Arashpour,et al. Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources , 2018 .
[34] Chi Sun Poon,et al. The evolution of prefabricated residential building systems in Hong Kong: A review of the public and the private sector , 2009 .
[35] A. Weele. Purchasing and Supply Chain Management: Analysis, Strategy, Planning and Practice , 2009 .
[36] Eric Wai Ming Lee,et al. A fully autonomous kernel-based online learning neural network model and its application to building cooling load prediction , 2014, Soft Comput..
[37] Roberto Cigolini,et al. Linking supply chain configuration to supply chain perfrmance: A discrete event simulation model , 2014, Simul. Model. Pract. Theory.
[38] Peter E.D. Love,et al. A seamless supply chain management model for construction , 2004 .
[39] Esin Ergen,et al. Analyzing the benefits of RFID technology for cost sharing in construction supply chains: A case study on prefabricated precast components , 2012 .
[40] Yu Bai,et al. Mechanical performance of modular FRP-steel composite beams for building construction , 2016 .
[41] Mehrdad Arashpour,et al. Integrated management of on-site, coordination and off-site uncertainty: Theorizing risk analysis within a hybrid project setting , 2017 .
[42] Andreas Eggert,et al. Value-Based Differentiation in Business Relationships: Gaining and Sustaining Key Supplier Status , 2006 .
[43] Hui Lu,et al. Construction Material Safety-Stock Determination Under Nonstationary Stochastic Demand and Random Supply Yield , 2016, IEEE Transactions on Engineering Management.
[44] Mehdi Bijari,et al. Effects of imperfect products on lot sizing with work in process inventory , 2011, Appl. Math. Comput..
[45] Seyed Mojib Zahraee,et al. System dynamics model for optimizing the recycling and collection of waste material in a closed-loop supply chain , 2015, Simul. Model. Pract. Theory.
[46] B. L. M. Mwamila,et al. Semi-prefabrication concrete techniques in developing countries , 1999 .
[47] S. Thomas Ng,et al. A parallel bargaining protocol for automated sourcing of construction suppliers , 2006 .
[48] Mehrdad Arashpour,et al. Autonomous production tracking for augmenting output in off-site construction , 2015 .
[49] David K. H. Chua,et al. IFC-Based Framework to Move beyond Individual Building Elements toward Configuring a Higher Level of Prefabrication , 2013 .
[50] H. Stadtler. Supply Chain Management: An Overview , 2015 .
[51] R Morledge,et al. The Concept and Development of Supply Chain Management in the UK Construction Industry , 2009 .
[52] Margaret K.Y. Mok,et al. Schedule risks in prefabrication housing production in Hong Kong: a social network analysis , 2016 .
[53] Najla Aissaoui,et al. Supplier selection and order lot sizing modeling: A review , 2007, Comput. Oper. Res..
[54] Johannes T. Voordijk,et al. The concept of modularity in supply chains : A multiple case-study in the construction industry , 2006 .
[55] Niclas Björngrim,et al. Need for innovation in supplying engineer‐to‐order joinery products to construction: A case study in Sweden , 2012 .
[56] Hans C. Bjornsson,et al. Agent-based construction supply chain simulator (CS2) for measuring the value of real-time information sharing in construction , 2008 .
[57] Andrew R.J. Dainty,et al. Subcontractor perspectives on supply chain alliances , 2001 .
[58] Stuart Tennant,et al. Theory to practice: A typology of supply chain management in construction , 2014 .
[59] Mehrdad Arashpour,et al. Analysis of disruptions caused by construction field rework on productivity in residential projects , 2014 .
[60] Shujian Ma,et al. Differential Dynamic Evolutionary Model of Emergency Financial Service Supply Chain in Natural Disaster Risk Management , 2016 .
[61] Mehrdad Arashpour,et al. Off-site construction optimization: sequencing multiple job classes with time constraints , 2016 .
[62] Mehrdad Arashpour,et al. Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production , 2014 .
[63] Anil Sawhney,et al. Cost of Risk Transfer: Pricing Agreements in Residential Supply Chains , 2004 .
[64] Mehrdad Arashpour,et al. Enhancing collaboration in BIM-based construction networks through organisational discontinuity theory: a case study of the new Royal Adelaide Hospital , 2016 .
[65] Mehrdad Arashpour,et al. Developing an uncertainty analysis model for off-site building production , 2015 .
[66] Leonhard E. Bernold,et al. Success of Supplier Alliances for Capital Projects , 2005 .
[67] William J. O'Brien,et al. Rapid assessment and selection of engineered equipment suppliers , 2012 .
[68] R. HeikkilÃ,et al. BIM Based Schedule Control for Precast Concrete Supply Chain , 2014 .
[69] Malik M A Khalfan. SUPPLY CHAIN INTEGRATION THROUGH INNOVATIVE PROCUREMENT , 2011 .
[70] Mehrdad Arashpour,et al. Application of Nonlinear-Autoregressive-Exogenous model to predict the hysteretic behaviour of passive control systems , 2015 .
[71] Mohamed Mohamed Naim,et al. Identifying and Categorizing the Sources of Uncertainty in Construction Supply Chains , 2013 .
[72] Ron Wakefield,et al. Concrete prefabricated housing via advances in systems technologies: development of a technology roadmap , 2010 .
[73] Jean Jingying Liu. Inventory control through a CONWIP pull production system , 2010 .
[74] Wallace J. Hopp,et al. Mitigating the Impact of Disruptions in Supply Chains , 2011 .
[75] Andrew R.J. Dainty,et al. Strategies for integrating the use of off-site production technologies in house building , 2012 .
[76] Peter E.D. Love,et al. A model for supporting inter-organizational relations in the supply chain , 2002 .
[77] Ray Y. Zhong,et al. Production lead-time hedging and coordination in prefabricated construction supply chain management , 2017, Int. J. Prod. Res..