Integrated Optimization of Production Planning and Scheduling in Mixed Model Assembly Line

Abstract In order to solve the separation in the traditional serial production planning and scheduling in mixed model assembly line, the integrated optimization complete model of production planning and scheduling based on multiple objectives and constraints was constructed. Since the integrated optimization complete model is difficult to solve, the heuristic approach was adopt, and the modified discrete particle swarm optimization(MDPSO) was presented to solve the model. The experiments verifies the presented model and algorithm can realize the simultaneously optimization of production planning and scheduling in mixed model assembly line and contribute to performance improvement and the application scope expand of the new intelligent optimization.