Construction industry craft divisions in the United States are currently based on narrowly defined skill groupings. The steady demand for improved productivity and the shortage of skilled craft workers call into question this traditionally accepted “single-skilled” strategy. While these craft patterns are prevalent throughout the union and nonunionized sectors of the industry, they are not necessarily responsive to construction sequence or the optimal use of worker skills. Alternative labor utilization strategies may provide increased project performance and may reduce craft shortages through better utilization of the existing workforce. An analysis model is developed in this study to measure the project impact of alternative labor utilization strategies. The model is used to assess four multiskilling strategies on the construction of a $70,000,000 project. Benefits of multiskilled labor utilization strategies were demonstrated including potentially a 5–20% labor cost savings, a 35% reduction in required ...
[1]
H. Randolph Thomas.
Labor Productivity and Work Sampling: The Bottom Line
,
1991
.
[2]
Matti Nallikari.
MULTISKILLED WORK TEAMS AT FINNISH SHIPYARDS
,
1995
.
[3]
David S. Lux,et al.
Human factors and the innovation process
,
1996
.
[4]
Daniel W. Halpin,et al.
Planning and analysis of construction operations
,
1992
.
[5]
W. MacLeod,et al.
Multiskilling, Technical Change and the Japanese Firm
,
1991
.
[6]
Ernesto M. Reza,et al.
Organizational Integration and Process Innovation
,
1992
.
[7]
Clyde B. Tatum,et al.
Organizing to Increase Innovation in Construction Firms
,
1989
.
[8]
Ki Seong Park.
Economic Growth and Multiskilled Workers in Manufacturing
,
1996,
Journal of Labor Economics.
[9]
I. Nonaka.
Redundant, Overlapping Organization: A Japanese Approach to Managing the Innovation Process
,
1990
.