Needs for developing a better way of cost estimating process for public construction projects have been widely recognized. Those needs are mainly from the early phases of the project through the construction life cycle due to the its importance to the control process. In contrast to the traditional estimating method based on unit-price references, this research utilized this following process. The first step is analyzing the real cost data from actual cost activities(2000-2010) about the statement of P.S.C(Prestressed Concrete) Box Girder Bridge. The collected data was broken into four categories based on technical construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). The second, actual design documents including the actual cost estimating documents, drawings and specifications were carefully reviewed to cluster the cost itemized statement from four categories. It was also attempted to seek the proper breakdown of standard works that are responsible for more than 95 percentage in each categories in terms of its cost. The third, this research comes up the index for standard unit materials and unit price of standard work and develops the approximate estimating model applying for the specification(length and breadth of bridges) per square area that the user takes as well as suggests the practical application plan within the original time alloted.
[1]
Jong-Hyun Park,et al.
Development of the Cost Analysis Format for Road Construction Project
,
2002
.
[2]
Jong-Hyun Park,et al.
Methodology for a Cost Estimating on the Project of a Composite Facility
,
2003
.
[3]
Lee Yoo-Seob.
Development of Construction Cost Model through the Analysis of Critical Work Items
,
2003
.
[4]
Chang-Taek Hyun,et al.
Cost prediction model of Public Multi-housing Projects in Schematic Design Phase
,
2008
.
[5]
Hyun-Soo Lee,et al.
Method of Quantity Data Analysis for Building Construction Cost Estimation : Focusing on Finish Work of Public Apartment Project
,
2008
.
[6]
Kyoungmin Kim,et al.
Approximate cost estimating model for PSC Beam bridge based on quantity of standard work
,
2009
.
[7]
Kyoungmin Kim,et al.
Preliminary Cost Estimation Model Using Case-Based Reasoning and Genetic Algorithms
,
2010,
J. Comput. Civ. Eng..
[8]
권태정.
기후변화시대 자연재해를 고려한 지속가능개발 개념의 재정립
,
2013
.