Serial Production Lines With Waiting Time Limits: Bernoulli Reliability Model

Production systems with waiting time constraints are frequently encountered in semiconductor, automotive, battery, food, and many other manufacturing industries. Under the waiting time constraints, the residence time of in-process inventories is constrained by a predetermined time limit. A part exceeding the maximal time limit has to be inspected for quality assurance and it is subject to be scrapped with a certain probability. In this paper, performance evaluation of Bernoulli serial lines with waiting time limits is studied. Analytical formulas are derived to predict the system performance of two-machine lines in steady state. For longer lines, direct analysis is no longer viable due to high complexity, thus an aggregation-based iterative procedure is introduced. Based on extensive numerical studies, the convergence of the procedure can be observed and high accuracy in performance estimation is achieved. In addition, to design such lines, an efficient procedure for near optimal buffer assignment to maximize production rate is also proposed. Analogously, we first propose an exact algorithm for two-machine lines and then extend it to a recursive procedure for longer lines. We then numerically verify that the procedure provides a near optimal solution within a very short computation time. Finally, the impacts of relaxing waiting time constraints on line performance and buffer design are discussed, and operational strategies to achieve better performance are also presented.

[1]  Yves Dallery,et al.  Manufacturing flow line systems: a review of models and analytical results , 1992, Queueing Syst. Theory Appl..

[2]  Xiang Li,et al.  A Hybrid Manufacturing/Remanufacturing System With Random Remanufacturing Yield and Market-Driven Product Acquisition , 2013, IEEE Transactions on Engineering Management.

[3]  Jong-Tae Lim,et al.  Bottlenecks in serial production lines: A system-theoretic approach , 1996 .

[4]  B.-J. Joo,et al.  A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints , 2009, J. Oper. Res. Soc..

[5]  Steven Nahmias,et al.  Perishable Inventory Theory: A Review , 1982, Oper. Res..

[6]  John A. Buzacott,et al.  Stochastic models of manufacturing systems , 1993 .

[7]  Stephan Biller,et al.  Quality/Quantity Improvement in an Automotive Paint Shop: A Case Study , 2010, IEEE Transactions on Automation Science and Engineering.

[8]  M. Omizo,et al.  Modeling , 1983, Encyclopedic Dictionary of Archaeology.

[9]  Keith C. C. Chan,et al.  Fuzzy operator allocation for balance control of assembly lines in apparel manufacturing , 2002, IEEE Trans. Engineering Management.

[10]  J. George Shanthikumar,et al.  Determination of Optimal Buffer Storage Capacities and Optimal Allocation in Multistage Automatic Transfer Lines , 1989 .

[11]  S. C. Baral Probabilistic modeling of the states of a buffer in a production flow system , 1993 .

[12]  H. T. Papadopoulos,et al.  Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines , 1996 .

[13]  Semyon M. Meerkov,et al.  On asymptotically reliable closed serial production lines , 1993 .

[14]  Stanley B. Gershwin,et al.  Manufacturing Systems Engineering , 1993 .

[15]  Liang Zhang,et al.  Bernoulli serial lines with deteriorating product quality: performance evaluation and system-theoretic properties , 2014 .

[16]  Ben Atkinson,et al.  Queueing theory in manufacturing systems analysis and design , 1993 .

[17]  Minghe Sun,et al.  Determining buffer location and size in production lines using tabu search , 1998, Eur. J. Oper. Res..

[18]  Stanley B. Gershwin,et al.  Efficient algorithms for buffer space allocation , 2000, Ann. Oper. Res..

[19]  W. Marsden I and J , 2012 .

[20]  Semyon M. Meerkov,et al.  Product quality inspection in Bernoulli lines: analysis, bottlenecks, and design , 2010 .

[21]  Chong Wang,et al.  Approximate Analysis of Reentrant Lines With Bernoulli Reliability Model , 2010, IEEE Transactions on Automation Science and Engineering.

[22]  Semyon M. Meerkov,et al.  Production variability in manufacturing systems: Bernoulli reliability case , 2000, Ann. Oper. Res..

[23]  Mansour Rahimi,et al.  On Managing the Human Factors Engineering of Hybrid Production Systems , 1988 .

[24]  Stephan Biller,et al.  Closed Bernoulli Production Lines: Analysis, Continuous Improvement, and Leanness , 2009, IEEE Transactions on Automation Science and Engineering.

[25]  Semyon M. Meerkov,et al.  Buffer capacity for accommodating machine downtime in serial production lines , 2001, Proceedings of the 40th IEEE Conference on Decision and Control (Cat. No.01CH37228).

[26]  Jingshan Li,et al.  Transient Analysis of Serial Production Lines With Perishable Products: Bernoulli Reliability Model , 2017, IEEE Transactions on Automatic Control.

[27]  Taeho Park,et al.  A two-phase heuristic algorithm for determining buffer sizes of production lines , 1993 .

[28]  Semyon M. Meerkov,et al.  Customer demand satisfaction in production systems: a due-time performance approach , 2001, IEEE Trans. Robotics Autom..

[29]  Jun-Ho Lee,et al.  Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation , 2016, IEEE Transactions on Automation Science and Engineering.

[30]  Feng Chu,et al.  A Petri Net Method for Schedulability and Scheduling Problems in Single-Arm Cluster Tools With Wafer Residency Time Constraints , 2008, IEEE Transactions on Semiconductor Manufacturing.

[31]  Jong-Tae Lim,et al.  Improvability of assembly systems II: Improvability indicators and case study , 2000 .

[32]  Jingshan Li Modeling and analysis of manufacturing systems with parallel lines , 2004, IEEE Transactions on Automatic Control.

[33]  Semyon M. Meerkov,et al.  Transient behavior of serial production lines with Bernoulli machines , 2008 .

[34]  Shu-Yin Chiang,et al.  Bernoulli serial production lines with quality control devices: Theory and application , 2006 .

[35]  Yeong-Dae Kim,et al.  Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times , 2016, Comput. Oper. Res..

[36]  Semyon M. Meerkov,et al.  Bernoulli production lines with quality-quantity coupling machines: monotonicity properties and bottlenecks , 2011, Ann. Oper. Res..

[37]  Semyon M. Meerkov,et al.  A system-theoretic property of serial production lines: improvability , 1995 .

[38]  J.-T. Lim,et al.  Homogeneous, asymptotically reliable serial production lines: theory and a case study , 1990 .

[39]  Yao Hu,et al.  Transient analysis to design buffer capacity in dairy filling and packing production lines , 2010 .

[40]  Diomidis Spinellis,et al.  A simulated annealing approach for buffer allocation in reliable production lines , 2000, Ann. Oper. Res..

[41]  Jingshan Li,et al.  Analysis, design, and control of Bernoulli production lines with waiting time constraints , 2018 .

[42]  Jingshan Li,et al.  Throughput analysis of production systems: recent advances and future topics , 2009 .

[43]  Yadati Narahari,et al.  Performance modeling of automated manufacturing systems , 1992 .