Serial Production Lines With Waiting Time Limits: Bernoulli Reliability Model
暂无分享,去创建一个
[1] Yves Dallery,et al. Manufacturing flow line systems: a review of models and analytical results , 1992, Queueing Syst. Theory Appl..
[2] Xiang Li,et al. A Hybrid Manufacturing/Remanufacturing System With Random Remanufacturing Yield and Market-Driven Product Acquisition , 2013, IEEE Transactions on Engineering Management.
[3] Jong-Tae Lim,et al. Bottlenecks in serial production lines: A system-theoretic approach , 1996 .
[4] B.-J. Joo,et al. A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints , 2009, J. Oper. Res. Soc..
[5] Steven Nahmias,et al. Perishable Inventory Theory: A Review , 1982, Oper. Res..
[6] John A. Buzacott,et al. Stochastic models of manufacturing systems , 1993 .
[7] Stephan Biller,et al. Quality/Quantity Improvement in an Automotive Paint Shop: A Case Study , 2010, IEEE Transactions on Automation Science and Engineering.
[8] M. Omizo,et al. Modeling , 1983, Encyclopedic Dictionary of Archaeology.
[9] Keith C. C. Chan,et al. Fuzzy operator allocation for balance control of assembly lines in apparel manufacturing , 2002, IEEE Trans. Engineering Management.
[10] J. George Shanthikumar,et al. Determination of Optimal Buffer Storage Capacities and Optimal Allocation in Multistage Automatic Transfer Lines , 1989 .
[11] S. C. Baral. Probabilistic modeling of the states of a buffer in a production flow system , 1993 .
[12] H. T. Papadopoulos,et al. Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines , 1996 .
[13] Semyon M. Meerkov,et al. On asymptotically reliable closed serial production lines , 1993 .
[14] Stanley B. Gershwin,et al. Manufacturing Systems Engineering , 1993 .
[15] Liang Zhang,et al. Bernoulli serial lines with deteriorating product quality: performance evaluation and system-theoretic properties , 2014 .
[16] Ben Atkinson,et al. Queueing theory in manufacturing systems analysis and design , 1993 .
[17] Minghe Sun,et al. Determining buffer location and size in production lines using tabu search , 1998, Eur. J. Oper. Res..
[18] Stanley B. Gershwin,et al. Efficient algorithms for buffer space allocation , 2000, Ann. Oper. Res..
[19] W. Marsden. I and J , 2012 .
[20] Semyon M. Meerkov,et al. Product quality inspection in Bernoulli lines: analysis, bottlenecks, and design , 2010 .
[21] Chong Wang,et al. Approximate Analysis of Reentrant Lines With Bernoulli Reliability Model , 2010, IEEE Transactions on Automation Science and Engineering.
[22] Semyon M. Meerkov,et al. Production variability in manufacturing systems: Bernoulli reliability case , 2000, Ann. Oper. Res..
[23] Mansour Rahimi,et al. On Managing the Human Factors Engineering of Hybrid Production Systems , 1988 .
[24] Stephan Biller,et al. Closed Bernoulli Production Lines: Analysis, Continuous Improvement, and Leanness , 2009, IEEE Transactions on Automation Science and Engineering.
[25] Semyon M. Meerkov,et al. Buffer capacity for accommodating machine downtime in serial production lines , 2001, Proceedings of the 40th IEEE Conference on Decision and Control (Cat. No.01CH37228).
[26] Jingshan Li,et al. Transient Analysis of Serial Production Lines With Perishable Products: Bernoulli Reliability Model , 2017, IEEE Transactions on Automatic Control.
[27] Taeho Park,et al. A two-phase heuristic algorithm for determining buffer sizes of production lines , 1993 .
[28] Semyon M. Meerkov,et al. Customer demand satisfaction in production systems: a due-time performance approach , 2001, IEEE Trans. Robotics Autom..
[29] Jun-Ho Lee,et al. Schedulability Analysis for Noncyclic Operation of Time-Constrained Cluster Tools With Time Variation , 2016, IEEE Transactions on Automation Science and Engineering.
[30] Feng Chu,et al. A Petri Net Method for Schedulability and Scheduling Problems in Single-Arm Cluster Tools With Wafer Residency Time Constraints , 2008, IEEE Transactions on Semiconductor Manufacturing.
[31] Jong-Tae Lim,et al. Improvability of assembly systems II: Improvability indicators and case study , 2000 .
[32] Jingshan Li. Modeling and analysis of manufacturing systems with parallel lines , 2004, IEEE Transactions on Automatic Control.
[33] Semyon M. Meerkov,et al. Transient behavior of serial production lines with Bernoulli machines , 2008 .
[34] Shu-Yin Chiang,et al. Bernoulli serial production lines with quality control devices: Theory and application , 2006 .
[35] Yeong-Dae Kim,et al. Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times , 2016, Comput. Oper. Res..
[36] Semyon M. Meerkov,et al. Bernoulli production lines with quality-quantity coupling machines: monotonicity properties and bottlenecks , 2011, Ann. Oper. Res..
[37] Semyon M. Meerkov,et al. A system-theoretic property of serial production lines: improvability , 1995 .
[38] J.-T. Lim,et al. Homogeneous, asymptotically reliable serial production lines: theory and a case study , 1990 .
[39] Yao Hu,et al. Transient analysis to design buffer capacity in dairy filling and packing production lines , 2010 .
[40] Diomidis Spinellis,et al. A simulated annealing approach for buffer allocation in reliable production lines , 2000, Ann. Oper. Res..
[41] Jingshan Li,et al. Analysis, design, and control of Bernoulli production lines with waiting time constraints , 2018 .
[42] Jingshan Li,et al. Throughput analysis of production systems: recent advances and future topics , 2009 .
[43] Yadati Narahari,et al. Performance modeling of automated manufacturing systems , 1992 .