A Review on Lean Manufacturing Implementation Techniques
暂无分享,去创建一个
R. Sundar | A. N. Balaji | R. M. Satheesh Kumar | R. Kumar | A. Balaji | R. Sundar | R.M. Satheesh Kumar | A. N. Balaji | R. M. S. Kumar
[1] A. F. Rentes,et al. Utilising Simulation to Enhance Value Stream Mapping: A Manufacturing Case Application , 2002 .
[2] Roger G. Schroeder,et al. The impact of just-in-time manufacturing and its infrastructure on manufacturing performance , 1997 .
[3] Sankar Sengupta,et al. Reliability consideration in the design and analysis of cellular manufacturing systems , 2007 .
[4] A. R. Rahani,et al. Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study , 2012 .
[5] John B. Kidd,et al. Toyota Production System , 1993 .
[6] Colin Herron,et al. The transfer of selected lean manufacturing techniques from Japanese automotive manufacturing into general manufacturing (UK) through change agents , 2008 .
[7] Achilles A. Armenakis,et al. Organizational Change Recipients' Beliefs Scale , 2007 .
[8] John Miltenburg,et al. U-shaped production lines: A review of theory and practice , 2001 .
[9] Jason Ardon-Finch,et al. Walk cycle design for flexible manpower lines using genetic algorithms , 2005, Int. J. Comput. Integr. Manuf..
[10] Jayant Rajgopal,et al. Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study , 2007 .
[11] Masaru Yamamoto,et al. Production planning in Japan; rediscovering lost experiences or new insights , 2001 .
[12] Joachim Metternich,et al. Efficiency and Economic Evaluation of Cellular Manufacturing to Enable Lean Machining , 2013 .
[13] S. G. Li,et al. The reliable design of one-piece flow production system using fuzzy ant colony optimization , 2009, Comput. Oper. Res..
[14] Kuo-Ching Ying,et al. Minimizing makespan in a flow-line manufacturing cell with sequence dependent family setup times , 2011, Expert Syst. Appl..
[15] Wen-Chyuan Chiang,et al. The stochastic U-line balancing problem: A heuristic procedure , 2006, Eur. J. Oper. Res..
[16] Jochen Deuse,et al. Leveling of low volume and high mix production based on a Group Technology approach , 2011 .
[17] Muris Lage Junior,et al. Variations of the kanban system: Literature review and classification , 2010 .
[18] John Bessant,et al. Developing strategic continuous improvement capability , 1999 .
[19] Berna Dengiz,et al. Computer simulation of a PCB production line: metamodeling approach , 2000 .
[20] K. Demeter,et al. The impact of lean practices on inventory turnover , 2011 .
[21] Shigeo Shingo. A Revolution in Manufacturing: The SMED System , 1985 .
[22] J. Liker. The Toyota Way , 2003 .
[23] John Miltenburg. One-piece flow manufacturing on U-shaped production lines: a tutorial , 2001 .
[24] Krisztina Demeter,et al. Factors influencing employee perceptions in lean transformations , 2011 .
[25] Ann van Ackere,et al. Trading off between heijunka and just-in-sequence , 2009 .
[26] R. John Milne,et al. Literature review of material flow control mechanisms , 1995 .
[27] Anders Berger,et al. Continuous improvement and kaizen: standardization and organizational designs , 1997 .
[28] Nadia Bhuiyan,et al. An overview of continuous improvement: from the past to the present , 2005 .
[29] Armin Scholl,et al. A survey on problems and methods in generalized assembly line balancing , 2006, Eur. J. Oper. Res..
[30] Jamie W. Flinchbaugh. Implementing lean manufacturing through factory design , 1998 .
[31] John Miltenburg,et al. The stochastic U‐line balancing problem , 2003 .