Failure factors of small software projects at a global outsourcing marketplace
暂无分享,去创建一个
[1] R.N. Charette,et al. Why software fails [software failure] , 2005, IEEE Spectrum.
[2] Yasunari Takagi,et al. An Empirical Approach to Characterizing Risky Software Projects Based on Logistic Regression Analysis , 2005, Empirical Software Engineering.
[3] Capers Jones,et al. Why software fails , 1996 .
[4] S. Viswanathan,et al. An Empirical Study of Online Software Outsourcing: Signals under Different Contract Regimes , 2010 .
[5] Thomas H. Wonnacott,et al. Introductory Statistics , 2007, Technometrics.
[6] Blaize Horner Reich,et al. The impact of size and volatility on IT project performance , 2007, CACM.
[7] Magne Jørgensen,et al. How does project size affect cost estimation error? Statistical artifacts and methodological challenges , 2012 .
[8] Saleem Abuleil,et al. A Taxonomy of an IT Project Failure: Root Causes , 2009 .
[9] Markus Westner,et al. THE CURRENT STATE OF IS OFFSHORING IN GERMANY: PROJECT CHARACTERISTICS AND SUCCESS PATTERNS , 2010 .
[10] Magne Jørgensen,et al. How large are software cost overruns? A review of the 1994 CHAOS report , 2006, Inf. Softw. Technol..
[11] Urvashi Rathod,et al. Defining ‘success’ for software projects: An exploratory revelation , 2006 .
[12] Jarmo J. Ahonen,et al. Software engineering projects may fail before they are started: Post-mortem analysis of five cancelled projects , 2010, J. Syst. Softw..
[13] Søren L. Buhl,et al. What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.
[14] Claes Wohlin,et al. Assessing Project Success Using Subjective Evaluation Factors , 2004, Software Quality Journal.
[15] Trevor Wood-Harper,et al. Understanding the Sources of Information Systems Project Failure , 2007 .
[16] Robbie T. Nakatsu,et al. A risk profile of offshore-outsourced development projects , 2008, CACM.
[17] Rodney X. Sturdivant,et al. Applied Logistic Regression: Hosmer/Applied Logistic Regression , 2005 .
[18] Dorothy E. Leidner,et al. Review: A Review of Culture in Information Systems Research: Toward a Theory of Information Technology Culture Conflict , 2006, MIS Q..
[19] Barbara A. Kitchenham,et al. Evaluating logistic regression models to estimate software project outcomes , 2010, Inf. Softw. Technol..
[20] Tom Fawcett,et al. An introduction to ROC analysis , 2006, Pattern Recognit. Lett..
[21] Yasunari Takagi,et al. An Empirical Evaluation of Predicting Runaway Software Projects Using Bayesian Classification , 2004, PROFES.
[22] Gary King,et al. Logistic Regression in Rare Events Data , 2001, Political Analysis.
[23] Magne Jørgensen,et al. Over-optimism in software development projects: "the winner's curse" , 2005, 15th International Conference on Electronics, Communications and Computers (CONIELECOMP'05).
[24] Chris Verhoef,et al. The rise and fall of the Chaos report figures , 2010, IEEE Software.
[25] Barry W. Boehm,et al. Termination Doesn't Equal Project Failure , 2000, Computer.
[26] Marco Torchiano,et al. Actual vs. perceived effect of software engineering practices in the Italian industry , 2010, J. Syst. Softw..
[27] Magne Jørgensen,et al. Impact of effort estimates on software project work , 2001, Inf. Softw. Technol..
[28] Kalle Lyytinen,et al. Identifying Software Project Risks: An International Delphi Study , 2001, J. Manag. Inf. Syst..
[29] Magne Jørgensen,et al. A strong focus on low price when selecting software providers increases the likelihood of failure in software outsourcing projects , 2013, EASE '13.
[30] Sjaak Brinkkemper,et al. Reasons for Success and Failure in Offshore Software Development Projects , 2008, ECIS.
[31] Henry C. Lucas,et al. The Winner's Curse in High Tech , 2005, Computer.
[32] Magne Jørgensen,et al. From origami to software development: a review of studies on judgment-based predictions of performance time. , 2012, Psychological bulletin.
[33] David Baccarini,et al. The Logical Framework Method for Defining Project Success , 1999 .
[34] Jennifer Sampson,et al. What factors lead to software project failure? , 2008, 2008 Second International Conference on Research Challenges in Information Science.
[35] J.D. Harry,et al. Balancing act [noise based sensory enhancement technology] , 2005, IEEE Spectrum.
[36] Andrey Maglyas,et al. Comparison of two models of success prediction in software development projects , 2010, 2010 6th Central and Eastern European Software Engineering Conference (CEE-SECR).
[37] Khaled El Emam,et al. A Replicated Survey of IT Software Project Failures , 2008, IEEE Software.
[38] L. Willcocks,et al. ABOUT THE PRESENTER: , 2002 .
[39] Alfredo Candia-Véjar,et al. The optimization of success probability for software projects using genetic algorithms , 2011, J. Syst. Softw..
[40] Kurt R. Linberg. Software developer perceptions about software project failure: a case study , 1999, J. Syst. Softw..
[41] Robbie T. Nakatsu,et al. A comparative study of important risk factors involved in offshore and domestic outsourcing of software development projects: A two-panel Delphi study , 2009, Inf. Manag..