Multi-level lot-sizing and scheduling
暂无分享,去创建一个
As indicated in Section 2.5, today’s Advanced Planning Systems provide sophisticated planning functionality. However, since APS providers are not willing to disclose the used lot-sizing and scheduling models nor the applied solution methods, the planner can barely know how the results are produced.