Intelligent Decision-making Methods for Load Dispatching in Power Plants

Iso micro increase approach and dynamic planning are two methods of optimized dispatching of power plant loads currently in common use. After a comparison of the above two methods the authors have pointed out their defects in the actual dispatching of plant loads. On this basis an intelligent decision making strategy is proposed to reduce the cost of power generation, taking advantage of the actual experience gained in load dispatching. With respect to four units of 125MW plant installed at Tiansheng Harbor Power Generation Co. Ltd in Nantong City an optimized load dispatching system was developed, based on load intelligent decision-making strategy.