A Two-Stage Framework for Power Transformer Asset Maintenance Management—Part I: Models and Formulations

The emergence of smart grid technologies in terms of advanced communication infrastructure, embedded intelligence, diagnostics and monitoring capabilities offers new opportunities for improved transmission asset management strategies (TAMS). Accordingly, power system operators are currently looking for analytics that can make use of transmission asset condition monitors and data already available to make better-informed decisions. This two-part paper introduces a two-stage maintenance scheduler for power transmission assets. Part I begins with the motivation for TAMS and then continues with a two-stage maintenance management model that incorporates joint midterm and short-term maintenance. The first stage involves a midterm asset maintenance scheduler that explicitly considers the asset condition dynamics in terms of failure rate. The second stage introduces a short-term maintenance scheduler with N-1 reliability that schedules the output of the midterm maintenance scheduler in the short run. The midterm and short-term stages are completely decoupled schemes to make the problem computationally tractable. For the sake of exposition here, we focus on the maintenance of grid transformers. The proposed methodology is general, however, and can be extended to other network equipments as well. The characteristics of the proposed model and its benefits are investigated in Part II through several case studies.

[1]  M. Shahidehpour,et al.  Stochastic Security-Constrained Unit Commitment , 2007, IEEE Transactions on Power Systems.

[2]  Zuyi Li,et al.  Security-Constrained Optimal Coordination of Generation and Transmission Maintenance Outage Scheduling , 2007, IEEE Transactions on Power Systems.

[3]  M. Fotuhi-Firuzabad,et al.  An Efficient Mixed-Integer Linear Formulation for Long-Term Overhead Lines Maintenance Scheduling in Power Distribution Systems , 2009, IEEE Transactions on Power Delivery.

[4]  Mohammad Shahidehpour,et al.  Security-Constrained Generation and Transmission Outage Scheduling With Uncertainties , 2010, IEEE Transactions on Power Systems.

[5]  M. Fotuhi-Firuzabad,et al.  Optimized Midterm Preventive Maintenance Outage Scheduling of Thermal Generating Units , 2012, IEEE Transactions on Power Systems.

[6]  R.P. O'Neill,et al.  Optimal Transmission Switching With Contingency Analysis , 2010, IEEE Transactions on Power Systems.

[7]  Masood Parvania,et al.  A two-stage framework for power transformer asset maintenance management—Part II: Validation results , 2013, 2013 IEEE Power & Energy Society General Meeting.

[8]  Mohammad Shahidehpour,et al.  The IEEE Reliability Test System-1996. A report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee , 1999 .

[9]  James D. McCalley,et al.  Risk-based Maintenance Allocation and Scheduling for Bulk Electric Power Transmission System Equipment , 2002 .

[10]  A.E.B. Abu-Elanien,et al.  Survey on the Transformer Condition Monitoring , 2007, 2007 Large Engineering Systems Conference on Power Engineering.

[11]  M. Shahidehpour,et al.  Coordination of Midterm Outage Scheduling With Short-Term Security-Constrained Unit Commitment , 2009, IEEE Transactions on Power Systems.

[12]  Yong Fu,et al.  Long-term security-constrained unit commitment: hybrid Dantzig-Wolfe decomposition and subgradient approach , 2005, IEEE Transactions on Power Systems.

[13]  Anna Franzén,et al.  State of the art - life time modeling and management of transformers , 2007 .

[14]  A. Conejo,et al.  Market-clearing with stochastic security-part I: formulation , 2005, IEEE Transactions on Power Systems.

[15]  V. Vittal,et al.  Risk Assessment for Transformer Loading , 2001, IEEE Power Engineering Review.

[16]  Wenyuan Li,et al.  Risk Assessment Of Power Systems: Models, Methods, and Applications , 2004 .

[17]  Masood Parvania,et al.  Demand Response Scheduling by Stochastic SCUC , 2010, IEEE Transactions on Smart Grid.

[18]  James D. McCalley,et al.  Risk-based Maintenance Optimization For Transmission Equipment , 2003 .