Alternative approach for solving replenishment lot size problem with discontinuous issuing policy and rework
暂无分享,去创建一个
Singa Wang Chiu | Chien-Hua Lee | Kuang-Ku Chen | Mei-Fang Wu | Chien-Hua Lee | Mei-Fang Wu | S. Chiu | Kuang-Ku Chen | Kuang-Ku Chen
[1] Suresh Kumar Goyal,et al. An integrated inventory model for a single supplier-single customer problem , 1977 .
[2] Lu Lu. A one-vendor multi-buyer integrated inventory model , 1995 .
[3] Ruhul A. Sarker,et al. An optimal batch size for a production system operating under periodic delivery policy , 1999 .
[4] M. Javad Paknejad,et al. Quality improvement and setup reduction in the joint economic lot size model , 2002, Eur. J. Oper. Res..
[5] Geir Hasle,et al. AI approaches to production management , 1991 .
[6] Tzu-Chun Weng,et al. Optimal replenishment policies for the case of a demand function with product-life-cycle shape in a finite planning horizon , 2007, Expert Syst. Appl..
[7] Robert W. Grubbström,et al. The EOQ with backlogging derived without derivatives , 1999 .
[8] Hong-Dar Lin,et al. Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework , 2011 .
[9] T.C.E. Cheng,et al. An Economic Order Quantity Model with Demand-Dependent Unit Production Cost and Imperfect Production Processes , 1991 .
[10] Meir J. Rosenblatt,et al. Economic Production Cycles with Imperfect Production Processes , 1986 .
[11] Steven Nahmias,et al. Production and operations analysis , 1992 .
[12] B. Sarker,et al. Economic manufacturing quantity in a just-in-time delivery system , 1992 .
[13] M. N. Gopalan,et al. Expected Duration Analysis of a Two-Stage Transfer-Line Production System Subject to Inspection and Rework , 1994 .
[14] Yuan-Shyi Peter Chiu,et al. Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown , 2010, Comput. Math. Appl..
[15] Bhaba R. Sarker,et al. Optimal manufacturing batch size with rework process at a single-stage production system , 2004, Comput. Ind. Eng..
[16] Hui-Ming Wee,et al. A discussion on economic ordering policy of deteriorated item for vendor and buyer , 2006 .
[17] Daniel S. Yeung,et al. Modelling fuzzy production rules with fuzzy expert networks , 1997 .
[18] David F. Pyke,et al. Inventory management and production planning and scheduling , 1998 .
[19] M. Khouja. Optimizing inventory decisions in a multi-stage multi-customer supply chain , 2003 .
[20] R. J. Tersine. Principles of inventory and materials management , 1982 .
[21] Frederick S. Hillier,et al. Introduction of Operations Research , 1967 .
[22] Singa Wang Chiu,et al. Effect of shortage level constraint on finite production rate model with rework , 2008 .
[23] Roger M. Hill. Optimizing a Production System with a Fixed Delivery Schedule , 1996 .
[24] Leopoldo Eduardo Cárdenas-Barrón,et al. The economic production quantity (EPQ) with shortage derived algebraically , 2001 .
[25] Manoj Kumar Tiwari,et al. An integrated approach for logistic and vendor managed inventory in supply chain , 2010, Expert Syst. Appl..
[26] Bhaba R. Sarker,et al. Finite horizon planning for a production system with permitted shortage and fixed-interval deliveries , 2006, Comput. Oper. Res..
[27] Gyana R. Parija,et al. An Optimal Batch Size for a Production System Operating Under a Fixed-Quantity, Periodic Delivery Policy , 1994 .
[28] Mohamed Ben-Daya,et al. Note: The economic manufacturing lot-sizing problem with imperfect production processes: Bounds and optimal solutions , 1998 .
[29] Henri Pierreval,et al. Expert system for selecting priority rules in flexible manufacturing systems , 1992 .