Risk-based prioritization and its application to inspection of valves in the water sector

Isolation valves facilitate the effective operation and maintenance of water supply networks, but their sheer number presents a significant asset management challenge. If left unmanaged, valve reliability issues can become widespread. Inspections provide a means of increasing reliability, but a survey of industry practices indicated that some utilities did not have such a program in place. To improve asset management and reduce business risk exposure, such utilities need an effective means of commencing inspection programs. From a theoretical perspective, risk concepts provide a means of optimizing maintenance effort. However, in the face of poor data on reliability or condition, pragmatic approaches to risk-based prioritization are needed. One such approach, risk indexing, is considered in this paper. Background on the research is presented, including the application of risk-based inspection concepts within the water sector. The development of a risk indexing scheme is then investigated, drawing on two industry workshops in which the analytical hierarchy process was used to set relative weights. It is concluded that risk indexing provides the basis for a rational prioritization process in the absence of data on valve reliability or condition.

[1]  M Ridgway Classifying medical devices according to their maintenance sensitivity: a practical, risk-based approach to PM program management. , 2001, Biomedical instrumentation & technology.

[2]  Indrani Basak,et al.  Rank-based statistical procedures in analytic hierarchy process , 1997 .

[3]  Stewart Burn,et al.  Effective use of condition assessment within asset management , 2008 .

[4]  David Marlow,et al.  Effective management of large‐diameter pressure pipes , 2010 .

[5]  Philip C. Singer,et al.  Erratum: Temporal and spatial variability of DBPs in a chloraminated distribution system(Journal Awwa (2004) , 2005 .

[6]  Thomas L. Saaty,et al.  Group decision making using the analytic hierarchy process , 1993 .

[7]  Faisal Khan,et al.  Risk-based maintenance (RBM): a quantitative approach for maintenance/inspection scheduling and planning , 2003 .

[8]  Arja Saarenheimo,et al.  Comparison of approaches for estimating pipe rupture frequencies for risk-informed in-service inspections , 2004, Reliab. Eng. Syst. Saf..

[9]  Ajit Srividya,et al.  Importance measures in ranking piping components for risk informed in-service inspection , 2003, Reliab. Eng. Syst. Saf..

[10]  Kirti Peniwati,et al.  Aggregating individual judgments and priorities with the analytic hierarchy process , 1998, Eur. J. Oper. Res..

[11]  A K Lee Multilevel Risk-Based Inspection Scheme for FPSOs , 2007 .

[12]  Thomas M. Walski Practical aspects of providing reliability in water distribution systems , 1993 .

[13]  David J. Beale,et al.  Condition assessment of appurtenances: A water sector perspective , 2012 .

[14]  Peter Knights,et al.  Business-oriented prioritization: A novel graphical technique , 2009, Reliab. Eng. Syst. Saf..

[15]  Thomas M. Walski,et al.  Water distribution valve topology for reliability analysis , 1993 .

[16]  Chun-Hung Chen,et al.  A strategy for the risk-based inspection of pressure safety valves , 2009, Reliab. Eng. Syst. Saf..

[17]  R. F. Critchley,et al.  Aqueduct Management Planning: Thirlmere, Haweswater and Vyrnwy Aqueducts , 1994 .

[18]  Mark G. Stewart,et al.  Risk assessment for civil engineering facilities: critical overview and discussion , 2003, Reliab. Eng. Syst. Saf..

[19]  Faisal I Khan,et al.  Risk-Based Integrity and Inspection Modeling (RBIIM) of Process Components/System , 2006, Risk analysis : an official publication of the Society for Risk Analysis.

[20]  Ajit Srividya,et al.  A comprehensive framework for evaluation of piping reliability due to erosion-corrosion for risk-informed inservice inspection , 2003, Reliab. Eng. Syst. Saf..

[21]  Neil S. Grigg,et al.  Failure Assessment Modeling to Prioritize Water Pipe Renewal: Two Case Studies , 2009 .

[22]  S. Burn,et al.  A pathway to a more sustainable water sector: sustainability-based asset management. , 2010, Water science and technology : a journal of the International Association on Water Pollution Research.

[23]  Mark G. Stewart,et al.  Reliability-based assessment of ageing bridges using risk ranking and life cycle cost decision analyses , 2001, Reliab. Eng. Syst. Saf..

[24]  Terje Aven,et al.  A framework for reliability and risk centered maintenance , 2011, Reliab. Eng. Syst. Saf..

[25]  Prasanta Kumar Dey,et al.  Risk-based model aids selection of pipeline inspection, maintenance strategies , 2001 .

[26]  Adiel Teixeira de Almeida,et al.  Multi-attribute risk assessment for risk ranking of natural gas pipelines , 2009, Reliab. Eng. Syst. Saf..