Risk-based prioritization and its application to inspection of valves in the water sector
暂无分享,去创建一个
[1] M Ridgway. Classifying medical devices according to their maintenance sensitivity: a practical, risk-based approach to PM program management. , 2001, Biomedical instrumentation & technology.
[2] Indrani Basak,et al. Rank-based statistical procedures in analytic hierarchy process , 1997 .
[3] Stewart Burn,et al. Effective use of condition assessment within asset management , 2008 .
[4] David Marlow,et al. Effective management of large‐diameter pressure pipes , 2010 .
[5] Philip C. Singer,et al. Erratum: Temporal and spatial variability of DBPs in a chloraminated distribution system(Journal Awwa (2004) , 2005 .
[6] Thomas L. Saaty,et al. Group decision making using the analytic hierarchy process , 1993 .
[7] Faisal Khan,et al. Risk-based maintenance (RBM): a quantitative approach for maintenance/inspection scheduling and planning , 2003 .
[8] Arja Saarenheimo,et al. Comparison of approaches for estimating pipe rupture frequencies for risk-informed in-service inspections , 2004, Reliab. Eng. Syst. Saf..
[9] Ajit Srividya,et al. Importance measures in ranking piping components for risk informed in-service inspection , 2003, Reliab. Eng. Syst. Saf..
[10] Kirti Peniwati,et al. Aggregating individual judgments and priorities with the analytic hierarchy process , 1998, Eur. J. Oper. Res..
[11] A K Lee. Multilevel Risk-Based Inspection Scheme for FPSOs , 2007 .
[12] Thomas M. Walski. Practical aspects of providing reliability in water distribution systems , 1993 .
[13] David J. Beale,et al. Condition assessment of appurtenances: A water sector perspective , 2012 .
[14] Peter Knights,et al. Business-oriented prioritization: A novel graphical technique , 2009, Reliab. Eng. Syst. Saf..
[15] Thomas M. Walski,et al. Water distribution valve topology for reliability analysis , 1993 .
[16] Chun-Hung Chen,et al. A strategy for the risk-based inspection of pressure safety valves , 2009, Reliab. Eng. Syst. Saf..
[17] R. F. Critchley,et al. Aqueduct Management Planning: Thirlmere, Haweswater and Vyrnwy Aqueducts , 1994 .
[18] Mark G. Stewart,et al. Risk assessment for civil engineering facilities: critical overview and discussion , 2003, Reliab. Eng. Syst. Saf..
[19] Faisal I Khan,et al. Risk-Based Integrity and Inspection Modeling (RBIIM) of Process Components/System , 2006, Risk analysis : an official publication of the Society for Risk Analysis.
[20] Ajit Srividya,et al. A comprehensive framework for evaluation of piping reliability due to erosion-corrosion for risk-informed inservice inspection , 2003, Reliab. Eng. Syst. Saf..
[21] Neil S. Grigg,et al. Failure Assessment Modeling to Prioritize Water Pipe Renewal: Two Case Studies , 2009 .
[22] S. Burn,et al. A pathway to a more sustainable water sector: sustainability-based asset management. , 2010, Water science and technology : a journal of the International Association on Water Pollution Research.
[23] Mark G. Stewart,et al. Reliability-based assessment of ageing bridges using risk ranking and life cycle cost decision analyses , 2001, Reliab. Eng. Syst. Saf..
[24] Terje Aven,et al. A framework for reliability and risk centered maintenance , 2011, Reliab. Eng. Syst. Saf..
[25] Prasanta Kumar Dey,et al. Risk-based model aids selection of pipeline inspection, maintenance strategies , 2001 .
[26] Adiel Teixeira de Almeida,et al. Multi-attribute risk assessment for risk ranking of natural gas pipelines , 2009, Reliab. Eng. Syst. Saf..