The interaction among production, hedging and investment decisions

[1]  Y. Chiu,et al.  Combining an improved multi-delivery policy into a single-producer multi-retailer integrated inventory system with scrap in production , 2014 .

[2]  Yuan-Shyi Peter Chiu,et al.  Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note , 2014 .

[3]  Y. Chiu,et al.  Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate , 2013 .

[4]  Singa Wang Chiu,et al.  Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown , 2013 .

[5]  Singa Wang Chiu,et al.  Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework , 2013 .

[6]  Singa Wang Chiu,et al.  Determining production–shipment policy for a vendor–buyer integrated system with rework and an amending multi-delivery schedule , 2013 .

[7]  Erhan Bayraktar,et al.  Inventory management with partially observed nonstationary demand , 2010, Ann. Oper. Res..

[8]  Moawia Alghalith,et al.  A new stochastic factor model: General explicit solutions , 2009, Appl. Math. Lett..

[9]  Hansjörg Albrecher,et al.  Optimal asset allocation in a stochastic factor model – an overview and open problems , 2009 .

[10]  Erhan Bayraktar,et al.  Optimal investment strategy to minimize occupation time , 2008, Ann. Oper. Res..

[11]  Moawia Alghalith,et al.  Recent applications of theory of the firm under uncertainty , 2008, Eur. J. Oper. Res..

[12]  Frank J. Fabozzi,et al.  The Mathematics of Financial Modeling and Investment Management , 2004 .

[13]  Hong-Dar Lin,et al.  Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach , 2014 .