The interaction among production, hedging and investment decisions
暂无分享,去创建一个
[1] Y. Chiu,et al. Combining an improved multi-delivery policy into a single-producer multi-retailer integrated inventory system with scrap in production , 2014 .
[2] Yuan-Shyi Peter Chiu,et al. Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note , 2014 .
[3] Y. Chiu,et al. Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate , 2013 .
[4] Singa Wang Chiu,et al. Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown , 2013 .
[5] Singa Wang Chiu,et al. Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework , 2013 .
[6] Singa Wang Chiu,et al. Determining production–shipment policy for a vendor–buyer integrated system with rework and an amending multi-delivery schedule , 2013 .
[7] Erhan Bayraktar,et al. Inventory management with partially observed nonstationary demand , 2010, Ann. Oper. Res..
[8] Moawia Alghalith,et al. A new stochastic factor model: General explicit solutions , 2009, Appl. Math. Lett..
[9] Hansjörg Albrecher,et al. Optimal asset allocation in a stochastic factor model – an overview and open problems , 2009 .
[10] Erhan Bayraktar,et al. Optimal investment strategy to minimize occupation time , 2008, Ann. Oper. Res..
[11] Moawia Alghalith,et al. Recent applications of theory of the firm under uncertainty , 2008, Eur. J. Oper. Res..
[12] Frank J. Fabozzi,et al. The Mathematics of Financial Modeling and Investment Management , 2004 .
[13] Hong-Dar Lin,et al. Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach , 2014 .