Numerical Simulation Study on the Delay of Rockburst Based on Rock Mass Stress Release Rate
暂无分享,去创建一个
[1] Mark S. Diederichs,et al. Instability of hard rockmasses, the role of tensile damage and relaxation , 2000 .
[2] Li Xibing,et al. A DISTANCE DISCRIMINANT ANALYSIS METHOD FOR PREDICTION OF POSSIBILITY AND CLASSIFICATION OF ROCKBURST AND ITS APPLICATION , 2007 .
[3] V. Hajiabdolmajid,et al. Modelling brittle failure of rock , 2002 .
[4] P. K. Kaiser,et al. Hoek-Brown parameters for predicting the depth of brittle failure around tunnels , 1999 .
[5] Yu Tao,et al. Study on numerical analysis of rockburst and primary support time in Cangling Tunnel , 2007 .
[6] Mark S. Diederichs,et al. Damage initiation and propagation in hard rock during tunnelling and the influence of near-face stress rotation , 2004 .
[7] Mark S. Diederichs,et al. The 2003 Canadian Geotechnical Colloquium: Mechanistic interpretation and practical application of damage and spalling prediction criteria for deep tunnelling , 2007 .
[8] Yang Jian. PREDICTION AND COUNTERMEASURE FOR ROCKBURST IN CANGLING MOUNTAIN HIGHWAY TUNNEL , 2005 .
[9] Peter K. Kaiser,et al. Brittleness of rock and stability assessment in hard rock tunneling , 2003 .
[10] Catrin Edelbro,et al. Numerical modelling of observed fallouts in hard rock masses using an instantaneous cohesion-softening friction-hardening model , 2009 .
[11] M. S. Diederichsa,et al. Damage initiation and propagation in hard rock during tunnelling and the influence of near-face stress rotation , 2004 .
[12] Nick Barton,et al. Engineering classification of rock masses for the design of tunnel support , 1974 .