Push-Kanban – a kanban-based production control concept for job shops
暂无分享,去创建一个
[1] Marina Gebhard,et al. Hierarchische Produktionsplanung bei Unsicherheit , 2009 .
[2] Jan Riezebos,et al. Lean Production and information technology: Connection or contradiction? , 2009, Comput. Ind..
[3] William L. Maxwell,et al. Theory of scheduling , 1967 .
[4] John Drew,et al. Journey to lean : making operational change stick , 2004 .
[5] H. Proff,et al. Strategisches Kompetenz-Management in der Betriebswirtschaftslehre , 2008 .
[6] Lawrence D. Fredendall,et al. Concerning the theory of workload control , 2010, Eur. J. Oper. Res..
[7] Gerard Gaalman,et al. The performance of workload control concepts in job shops: improving the release method , 1996 .
[8] D. D. Günthner. Ereignisorientierte Logistik — Ein neuer Ansatz zur Steuerung von Logistiksystemen , 2008 .
[9] Semyon M. Meerkov,et al. Production variability in manufacturing systems: Bernoulli reliability case , 2000, Ann. Oper. Res..
[10] Hans-Peter Wiendahl. Betriebsorganisation für Ingenieure , 2009 .
[11] Klaus Altendorfer,et al. Behaviour of MRP, Kanban, CONWIP and DBR under dynamic environmental variability , 2007 .
[12] Patrick Pujo,et al. Pull control for job shop: holonic manufacturing system approach using multicriteria decision-making , 2012, J. Intell. Manuf..
[13] Wilhelm Dangelmaier. Theorie der Produktionsplanung und -steuerung , 2009 .
[14] Mark Stevenson. Practical implementation of production planning and control concepts in SMEs and MTOs: an introduction to the special issue , 2009 .
[15] Jan Topi Tervo,et al. Dynamik logistischer Systeme , 2008 .
[16] Kenneth R. Baker,et al. Sequencing Rules and Due-Date Assignments in a Job Shop , 1984 .
[17] Rakesh Nagi,et al. Fuzzy set theory applications in production management research: a literature survey , 1998, J. Intell. Manuf..
[18] G. Zäpfel. Production planning in the case of uncertain individual demand Extension for an MRP II concept , 1996 .
[19] Florian Kienzle. Fertigungssteuerung in der Musterfertigung von Systemlieferanten , 2011 .
[20] John H. Blackstone,et al. The evolution of a management philosophy: The theory of constraints , 2007 .
[21] Martin Land. Cobacabana (control of balance by card-based navigation): A card based system for job shop control , 2006 .
[22] Jose M. Framinan,et al. The pull evolution: from Kanban to customised token-based systems , 2009 .
[23] Nuno O. Fernandes,et al. Generic POLCA : a production and materials flow control mechanism for quick response manufacturing , 2006 .
[24] Cathal Heavey,et al. A review and comparison of hybrid and pull-type production control strategies , 2005, OR Spectr..
[25] Muris Lage Junior,et al. Variations of the kanban system: Literature review and classification , 2010 .
[26] Martin Land,et al. Workload control concepts in job shops A critical assessment , 1995 .
[27] Hans-Peter Wiendahl,et al. Decentralized WIP-oriented manufacturing control (DEWIP) , 2003 .
[28] Prakash G. Awate,et al. An extension of modified-operational-due-date priority rule incorporating job waiting times and application to assembly job shop , 1997 .
[29] Valerie Tardif,et al. An adaptive approach to controlling kanban systems , 2001, Eur. J. Oper. Res..
[30] M. Hülsmann,et al. Selbststeuerung — Ein Ansatz zur Balancierung von Flexibilität und Stabilität organisationaler Kompetenzen? , 2008 .
[31] Gerard Gaalman,et al. Exploring applicability of the workload control concept , 2004 .
[32] Erwin W. Hans,et al. Workload based order acceptance in job shop environments , 2005, OR Spectr..
[33] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .
[34] Brian G. Kingsman,et al. The effect of workload control (WLC) on performance in make-to-order companies , 1998 .
[35] S. Engell,et al. A survey of priority rules for FMS scheduling and their performance for the benchmark problem , 1992, [1992] Proceedings of the 31st IEEE Conference on Decision and Control.
[36] Bernd Scholz-Reiter,et al. Autonomously controlled production systems—Influence of autonomous control level on logistic performance , 2009 .
[37] Karl Johan Åström,et al. Autonomous Control , 1992, 25th Anniversary of INRIA.
[38] Hiroki Okubo,et al. Characteristics of distributed autonomous production control , 2000 .
[39] Bernd Scholz-Reiter,et al. Dynamic flexible flow shop problems—Scheduling heuristics vs. autonomous control , 2010 .
[40] Bart L. MacCarthy,et al. Organizational, Systems and Human Issues in Production Planning, Scheduling and Control , 2006 .
[41] Leena Suhl,et al. Optimierungssysteme: Modelle, Verfahren, Software, Anwendungen (Springer-Lehrbuch) , 2007 .
[42] Sigrid Wenzel,et al. Verifikation und Validierung für die Simulation in Produktion und Logistik - Vorgehensmodelle und Techniken , 2008 .
[43] Peter Nyhuis,et al. Beiträge zu einer Theorie der Logistik , 2008 .
[44] Jan Olhager,et al. Simulating production and inventory control systems: a learning approach to operational excellence , 2006 .
[45] Jan Riezebos,et al. Advancing lean manufacturing, the role of IT , 2009, Comput. Ind..
[46] Mohammad Mehdi Sepehri,et al. Critical WIP loops: a mechanism for material flow control in flow lines , 2007 .
[47] Oliver Rose. Comparison of Due-date Oriented Dispatch Rules in Semiconductor Manufacturing , 2003 .
[48] Mark Stevenson,et al. A review of production planning and control: the applicability of key concepts to the make-to-order industry , 2005 .