Push-Kanban – a kanban-based production control concept for job shops

Job-shop production in an individual and small-batch manufacturing environment demands producing simultaneously different products in many customised versions and in small numbers. The associated variability of the time-phased work content leads to a high degree of complexity and turbulence in the manufacturing process of such a production type. Therefore, production control becomes significantly more complicated, and many theories on how to cope fail in the real world. Despite the many technological and conceptual advances in the field of job-shop control over the past few decades, there is still a remarkable lack of practical control approaches for job-shop production. For this reason the Push-Kanban production control concept will be introduced in this article. It combines robust push scheduling along with a kanban-driven, decentralised inventory control mechanism to create a holistic control approach, integrating all production control tasks. Thus, it offers a feasible option for controlling job-shop production in industrial practice. This article examines the effectiveness of the concept by means of a simulation study based on real data.

[1]  Marina Gebhard,et al.  Hierarchische Produktionsplanung bei Unsicherheit , 2009 .

[2]  Jan Riezebos,et al.  Lean Production and information technology: Connection or contradiction? , 2009, Comput. Ind..

[3]  William L. Maxwell,et al.  Theory of scheduling , 1967 .

[4]  John Drew,et al.  Journey to lean : making operational change stick , 2004 .

[5]  H. Proff,et al.  Strategisches Kompetenz-Management in der Betriebswirtschaftslehre , 2008 .

[6]  Lawrence D. Fredendall,et al.  Concerning the theory of workload control , 2010, Eur. J. Oper. Res..

[7]  Gerard Gaalman,et al.  The performance of workload control concepts in job shops: improving the release method , 1996 .

[8]  D. D. Günthner Ereignisorientierte Logistik — Ein neuer Ansatz zur Steuerung von Logistiksystemen , 2008 .

[9]  Semyon M. Meerkov,et al.  Production variability in manufacturing systems: Bernoulli reliability case , 2000, Ann. Oper. Res..

[10]  Hans-Peter Wiendahl Betriebsorganisation für Ingenieure , 2009 .

[11]  Klaus Altendorfer,et al.  Behaviour of MRP, Kanban, CONWIP and DBR under dynamic environmental variability , 2007 .

[12]  Patrick Pujo,et al.  Pull control for job shop: holonic manufacturing system approach using multicriteria decision-making , 2012, J. Intell. Manuf..

[13]  Wilhelm Dangelmaier Theorie der Produktionsplanung und -steuerung , 2009 .

[14]  Mark Stevenson Practical implementation of production planning and control concepts in SMEs and MTOs: an introduction to the special issue , 2009 .

[15]  Jan Topi Tervo,et al.  Dynamik logistischer Systeme , 2008 .

[16]  Kenneth R. Baker,et al.  Sequencing Rules and Due-Date Assignments in a Job Shop , 1984 .

[17]  Rakesh Nagi,et al.  Fuzzy set theory applications in production management research: a literature survey , 1998, J. Intell. Manuf..

[18]  G. Zäpfel Production planning in the case of uncertain individual demand Extension for an MRP II concept , 1996 .

[19]  Florian Kienzle Fertigungssteuerung in der Musterfertigung von Systemlieferanten , 2011 .

[20]  John H. Blackstone,et al.  The evolution of a management philosophy: The theory of constraints , 2007 .

[21]  Martin Land Cobacabana (control of balance by card-based navigation): A card based system for job shop control , 2006 .

[22]  Jose M. Framinan,et al.  The pull evolution: from Kanban to customised token-based systems , 2009 .

[23]  Nuno O. Fernandes,et al.  Generic POLCA : a production and materials flow control mechanism for quick response manufacturing , 2006 .

[24]  Cathal Heavey,et al.  A review and comparison of hybrid and pull-type production control strategies , 2005, OR Spectr..

[25]  Muris Lage Junior,et al.  Variations of the kanban system: Literature review and classification , 2010 .

[26]  Martin Land,et al.  Workload control concepts in job shops A critical assessment , 1995 .

[27]  Hans-Peter Wiendahl,et al.  Decentralized WIP-oriented manufacturing control (DEWIP) , 2003 .

[28]  Prakash G. Awate,et al.  An extension of modified-operational-due-date priority rule incorporating job waiting times and application to assembly job shop , 1997 .

[29]  Valerie Tardif,et al.  An adaptive approach to controlling kanban systems , 2001, Eur. J. Oper. Res..

[30]  M. Hülsmann,et al.  Selbststeuerung — Ein Ansatz zur Balancierung von Flexibilität und Stabilität organisationaler Kompetenzen? , 2008 .

[31]  Gerard Gaalman,et al.  Exploring applicability of the workload control concept , 2004 .

[32]  Erwin W. Hans,et al.  Workload based order acceptance in job shop environments , 2005, OR Spectr..

[33]  David L. Woodruff,et al.  CONWIP: a pull alternative to kanban , 1990 .

[34]  Brian G. Kingsman,et al.  The effect of workload control (WLC) on performance in make-to-order companies , 1998 .

[35]  S. Engell,et al.  A survey of priority rules for FMS scheduling and their performance for the benchmark problem , 1992, [1992] Proceedings of the 31st IEEE Conference on Decision and Control.

[36]  Bernd Scholz-Reiter,et al.  Autonomously controlled production systems—Influence of autonomous control level on logistic performance , 2009 .

[37]  Karl Johan Åström,et al.  Autonomous Control , 1992, 25th Anniversary of INRIA.

[38]  Hiroki Okubo,et al.  Characteristics of distributed autonomous production control , 2000 .

[39]  Bernd Scholz-Reiter,et al.  Dynamic flexible flow shop problems—Scheduling heuristics vs. autonomous control , 2010 .

[40]  Bart L. MacCarthy,et al.  Organizational, Systems and Human Issues in Production Planning, Scheduling and Control , 2006 .

[41]  Leena Suhl,et al.  Optimierungssysteme: Modelle, Verfahren, Software, Anwendungen (Springer-Lehrbuch) , 2007 .

[42]  Sigrid Wenzel,et al.  Verifikation und Validierung für die Simulation in Produktion und Logistik - Vorgehensmodelle und Techniken , 2008 .

[43]  Peter Nyhuis,et al.  Beiträge zu einer Theorie der Logistik , 2008 .

[44]  Jan Olhager,et al.  Simulating production and inventory control systems: a learning approach to operational excellence , 2006 .

[45]  Jan Riezebos,et al.  Advancing lean manufacturing, the role of IT , 2009, Comput. Ind..

[46]  Mohammad Mehdi Sepehri,et al.  Critical WIP loops: a mechanism for material flow control in flow lines , 2007 .

[47]  Oliver Rose Comparison of Due-date Oriented Dispatch Rules in Semiconductor Manufacturing , 2003 .

[48]  Mark Stevenson,et al.  A review of production planning and control: the applicability of key concepts to the make-to-order industry , 2005 .