On the Order Fill Rate in a Multi-Item, Base-Stock Inventory System
暂无分享,去创建一个
[1] Ki Ling Cheung,et al. Multiple failures in a multi-item spares inventory model , 1995 .
[2] D. Walkup,et al. Association of Random Variables, with Applications , 1967 .
[3] John W. Mamer,et al. A Lower Bound Heuristic for Selecting Multi-Item Inventories for a General Job Completion Objective , 1988 .
[4] Henry Teicher,et al. On the multivariate poisson distribution , 1954 .
[5] Robin O. Roundy,et al. Procurement of common components in a stochastic environment , 1998 .
[6] M. Magazine,et al. Component Commonality with Service Level Requirements , 1988 .
[7] Stephen A. Smith,et al. Job-Fill Inventories for Sequences of Jobs , 1988 .
[8] I. Olkin,et al. A generalized bivariate exponential distribution , 1967 .
[9] Daniel Granot,et al. The Repair Kit Problem Revisited , 1993, Oper. Res..
[10] Sridhar R. Tayur,et al. Managing Stochastic Multiproduct Systems: Model, Measures, and Analysis , 1998, Oper. Res..
[11] John W. Mamer,et al. Optimizing Field Repair Kits Based on Job Completion Rate , 1982 .
[12] Craig C. Sherbrooke. Technical Note - Waiting Time in an (S - 1, S) Inventory System - Constant Service Time Case , 1975, Oper. Res..
[13] Isamu Higa,et al. Waiting Time in an (S - 1, S) Inventory System , 1975, Oper. Res..
[14] Richard E. Barlow,et al. Statistical Theory of Reliability and Life Testing: Probability Models , 1976 .
[15] W. Karl Kruse. Technical Note - Waiting Time in a Continuous Review (s, S) Inventory System with Constant Lead Times , 1981, Oper. Res..
[16] Stephen C. Graves. Note-A Multiple-Item Inventory Model with a Job Completion Criterion , 1982 .
[17] K. R. Baker,et al. The Effect of Commonality on Safety Stock in a Simple Inventory Model , 1986 .
[18] Hau L. Lee,et al. Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies , 1998, Eur. J. Oper. Res..
[19] Meyer Dwass,et al. On Infinitely Divisible Random Vectors , 1957 .
[20] John W. Mamer,et al. A constrained capital budgeting problem with applications to repair kit selection , 1987 .