Determination of Contract Time and Incentive and Disincentive Values of Highway Construction Projects
暂无分享,去创建一个
[1] Ossama Salem,et al. User Cost Models For Improved Pavement Selection , 2008 .
[2] David R. Martinelli,et al. Delay estimation and optimal length for four-lane divided freeway workzones , 1996 .
[3] Ralph W. Plummer,et al. Incentive/disincentive guidelines for highway construction contracts , 1995 .
[4] J. Neter,et al. Applied linear statistical models : regression, analysis of variance, and experimental designs , 1974 .
[5] Yong Jiang. A Model for Estimating Excess User Costs at Highway Work Zones , 1999 .
[6] S Taniguchi,et al. ESTIMATION OF WORK ZONE USER COST USING INTEGRATION CURVE , 2003 .
[7] David Arditi,et al. Incentive/Disincentive Provisions in Highway Contracts , 1997 .
[8] J S Gillespie,et al. ESTIMATING ROAD USER COSTS AS A BASIS FOR INCENTIVE/DISINCENTIVE AMOUNTS IN HIGHWAY CONSTRUCTION CONTRACTS , 1998 .
[9] I Minkarah,et al. THE EFFECT OF INCORPORATING ROAD USER COSTS DURING CONSTRUCTION ON PAVEMENT MANAGEMENT DECISIONS , 1997 .
[10] Yi Jiang,et al. Computation of User Costs at Freeway Work Zones Using Weigh-in-Motion Traffic Data , 2009 .
[11] Conrad L Dudek,et al. Construction costs and safety impacts of work zone traffic control strategies, Volume 1: final report , 1989 .
[12] Wei Tong Chen,et al. Setting maximum incentive for Incentive/Disincentive contracts for highway projects , 2004 .
[13] Conrad L Dudek,et al. CONSTRUCTION COSTS AND SAFETY IMPACTS OF WORK ZONE TRAFFIC CONTROL STRATEGIES. VOLUME II: INFORMATIONAL GUIDE. FINAL REPORT , 1989 .