Cost Profiling of Water Infrastructure Projects

AbstractThe expected final budgeted costs of infrastructure assets are often exceeded during project delivery. Being able to determine the likelihood of changes to the final budget can enable clien...

[1]  Nocedal,et al.  Numerical Optimization, 2nd edition , 2020 .

[2]  R. C. Merton,et al.  Theory of Rational Option Pricing , 2015, World Scientific Reference on Contingent Claims Analysis in Corporate Finance.

[3]  G. Hunanyan,et al.  Portfolio Selection , 2019, Finanzwirtschaft, Banken und Bankmanagement I Finance, Banks and Bank Management.

[4]  Peter E.D. Love,et al.  Understanding the Landscape of Overruns in Transport Infrastructure Projects , 2015 .

[5]  Simon Smith,et al.  Dealing with construction cost overruns using data mining , 2014 .

[6]  Panagiotis Ch. Anastasopoulos,et al.  Cost Overrun in Public-Private Partnerships: Toward Sustainable Highway Maintenance and Rehabilitation , 2014 .

[7]  B. Flyvbjerg,et al.  Should We Build More Large Dams? The Actual Costs of Hydropower Megaproject Development , 2014, 1409.0002.

[8]  David J. Edwards,et al.  Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overruns , 2012, IEEE Transactions on Engineering Management.

[9]  Simon Smith,et al.  Neural networks for modelling the final target cost of water projects , 2012 .

[10]  Li Liu,et al.  The accuracy of risk‐based cost estimation for water infrastructure projects: preliminary evidence from Australian projects , 2010 .

[11]  Oddgeir Osland,et al.  The Politics and Institutions of Project Approval - a Critical-Constructive Comment on the Theory of Strategic Misrepresentation , 2010, European Journal of Transport and Infrastructure Research.

[12]  Douglas W. Hubbard,et al.  The Failure of Risk Management: Why It's Broken and How to Fix It , 2009 .

[13]  T. Fonseca,et al.  Describing Maritime Pine Diameter Distributions with Johnson's SB Distribution Using a New All-Parameter Recovery Approach , 2009, Forest Science.

[14]  Samuel Labi,et al.  Estimating Cost Discrepancies in Highway Contracts: Multistep Econometric Approach , 2008 .

[15]  Ajibade Ayodeji Aibinu,et al.  The accuracy of pre‐tender building cost estimates in Australia , 2008 .

[16]  A. Tversky,et al.  Prospect theory: an analysis of decision under risk — Source link , 2007 .

[17]  Michael R Flynn,et al.  Fitting human exposure data with the Johnson SB distribution , 2006, Journal of Exposure Science and Environmental Epidemiology.

[18]  H. Markowitz Market Efficiency: A Theoretical Distinction and So What? , 2005 .

[19]  James Odeck,et al.  Cost overruns in road construction--what are their sizes and determinants? , 2004 .

[20]  L. Zhang,et al.  A comparison of estimation methods for fitting Weibull and Johnson's SB distributions to mixed sprucefir stands in northeastern North America , 2003 .

[21]  Fazil T. Najafi,et al.  Cost and time overruns in highway construction , 2002 .

[22]  Søren L. Buhl,et al.  Underestimating Costs in Public Works Projects: Error or Lie? , 2002, 1303.6604.

[23]  Takuji Nishimura,et al.  Mersenne twister: a 623-dimensionally equidistributed uniform pseudo-random number generator , 1998, TOMC.

[24]  N. L. Johnson,et al.  Continuous Univariate Distributions. , 1995 .

[25]  D. Pickrell A Desire Named Streetcar Fantasy and Fact in Rail Transit Planning , 1992 .

[26]  Jimmie Hinze,et al.  COST OVERRUNS ON STATE OF WASHINGTON CONSTRUCTION CONTRACTS , 1992 .

[27]  Charles T. Jahren,et al.  Predictors of Cost‐Overrun Rates , 1990 .

[28]  A. Tversky,et al.  Prospect theory: analysis of decision under risk , 1979 .

[29]  F. Black,et al.  The Pricing of Options and Corporate Liabilities , 1973, Journal of Political Economy.

[30]  N. L. Johnson,et al.  Systems of frequency curves generated by methods of translation. , 1949, Biometrika.

[31]  J. Tukey Comparing individual means in the analysis of variance. , 1949, Biometrics.