Minimizing total flow time in a two-machine flowshop problem with minimum makespan
暂无分享,去创建一个
[1] J. Gupta,et al. Local search heuristics for two-stage flow shop problems with secondary criterion , 2002, Comput. Oper. Res..
[2] Frank Werner,et al. On the application of insertion techniques for job shop problems with setup times , 1999, RAIRO Oper. Res..
[3] Jatinder N. D. Gupta,et al. Genetic algorithms for the two-stage bicriteria flowshop problem , 1996 .
[4] Sunderesh S. Heragu,et al. A combined branch-and-bound and genetic algorithm based approach for a flowshop scheduling problem , 1996, Ann. Oper. Res..
[5] Sunderesh S. Heragu,et al. A Branch-and-Bound Approach for a Two-machine Flowshop Scheduling Problem , 1995 .
[6] Frank Werner,et al. Insertion Techniques for the Heuristic Solution of the Job Shop Problem , 1995, Discret. Appl. Math..
[7] A. Nagar,et al. Multiple and bicriteria scheduling : A literature survey , 1995 .
[8] Spyros G. Tzafestas,et al. Deterministic scheduling in computing and manufacturing systems: a survey of models and algorithms , 1993 .
[9] P. Pardalos. Complexity in numerical optimization , 1993 .
[10] C. Rajendran. Heuristic algorithm for scheduling in a flowshop to minimize total flowtime , 1993 .
[11] Chandrasekharan Rajendran,et al. Two-Stage Flowshop Scheduling Problem with Bicriteria , 1992 .
[12] R. L. Daniels,et al. Multiobjective flow-shop scheduling , 1990 .
[13] Wlodzimierz Szwarc,et al. Extreme solutions of the two machine flow‐shop problem , 1981 .
[14] S. S. Panwalkar,et al. An ordered flow-shop sequencing problem with mean completion time criterion† , 1976 .
[15] Salah E. Elmaghraby,et al. Symposium on the Theory of Scheduling and Its Applications , 1973 .
[16] Jatinder N. D. Gupta,et al. Optimal Scheduling in a Multistage Flowshop , 1972 .
[17] R. A. Dudek,et al. Optimality Criteria for Flowshop Schedules , 1971 .
[18] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[19] 陳春龍,et al. Designing a tabu search algorithm for the two-stage flow shop problem with secondary criterion , 1999 .
[20] Graham K. Rand,et al. Logistics of Production and Inventory , 1995 .
[21] George L. Vairaktarakis,et al. Complexity of Single Machine Hierarchical Scheduling: A Survey , 1993 .
[22] Ahg Alexander Rinnooy Kan,et al. Sequencing and scheduling: algorithms and complexity , 1989 .
[23] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .
[24] R. A. Dudek,et al. Flowshop Sequencing Problem with Ordered Processing Time Matrices , 1975 .
[25] S. S. Panwalkar,et al. Sequencing Research and the Industrial Scheduling Problem , 1973 .