Ordering quantity decisions considering uncertainty in supply-chain logistics operations

This research seeks to determine the optimal order amount for a retailer given uncertainty in a supply-chain's logistics network due to unforeseeable disruption or various types of defects (e.g., shipping damage, missing parts and misplacing products). Mixture distribution models characterize problems from solitary failures and contingent events causing network to function ineffectively. The uncertainty in the number of good products successfully reaching distribution centers (DCs) and retail stores poses a challenge in deciding product-order amounts. Because the commonly used ordering plan developed for maximizing expected profits does not allow retailers to address concerns about contingencies; this research proposes two improved procedures with risk-averse characteristics towards low probability and high impact events. Several examples illustrate the impact of a DC's operation policies and model assumptions on a retailer's product-ordering plan and resulting sales profit.

[1]  John A. White On Absorbing Markov Chains and Optimum Batch Production Quantities , 1970 .

[2]  Sumila Gulyani,et al.  Effects of Poor Transportation on Lean Production and Industrial Clustering: Evidence from the Indian Auto Industry , 2001 .

[3]  Desheng Dash Wu,et al.  Enterprise risk management: coping with model risk in a large bank , 2010, J. Oper. Res. Soc..

[4]  Desheng Dash Wu,et al.  Enterprise risk management: small business scorecard analysis , 2009 .

[5]  David Perry,et al.  Analysis of a (Q, r, T) inventory policy with deterministic and random yields when future supply is uncertain , 1995 .

[6]  Esmail Mohebbi,et al.  Supply interruptions in a lost-sales inventory system with random lead time , 2003, Comput. Oper. Res..

[7]  David L. Olson,et al.  Supply chain risk, simulation, and vendor selection , 2008 .

[8]  Mahmut Parlar,et al.  Continuous-review inventory problem with random supply interruptions , 1997 .

[9]  W. Shih Optimal inventory policies when stockouts result from defective products , 1980 .

[10]  Ranga V. Ramasesh,et al.  Sole Versus Dual Sourcing in Stochastic Lead-Time s, Q Inventory Models , 1991 .

[11]  S. Y. Wu,et al.  Stock Control with Two Suppliers and Normal Lead Times , 1981 .

[12]  E. Silver Establishing The Order Quantity When The Amount Received Is Uncertain , 1976 .

[13]  A. Lau,et al.  Coordinating two suppliers with offsetting lead time and price performance , 1994 .

[14]  Desheng Dash Wu,et al.  A risk analysis model in concurrent engineering product development. , 2010, Risk analysis : an official publication of the Society for Risk Analysis.

[15]  Desheng Dash Wu,et al.  Introduction to the Special Section on “Optimizing Risk Management: Methods and Tools” , 2009 .

[16]  Desheng Dash Wu,et al.  Enterprise risk management: a DEA VaR approach in vendor selection , 2010 .

[17]  Gerald Keller,et al.  One-Period Order Quantity Strategy With Uncertain Match Between The Amount Received And Quantity Requisitioned , 1986 .

[18]  Z. Kevin Weng,et al.  Coordinated ordering decisions for short life cycle products with uncertainty in delivery time and demand , 2003, Eur. J. Oper. Res..