Capacity reconfiguration management in reconfigurable manufacturing systems
暂无分享,去创建一个
[1] Manfredi Bruccoleri,et al. A performance comparison between market like and efficiency based approaches in Agent Based Manufacturing environment , 2003 .
[2] Neil A. Duffie,et al. Backlog Control Design for a Closed Loop PPC System , 2004 .
[3] G. Perrone,et al. Reconfiguration: a key to handle exceptions and performance deteriorations in manufacturing operations , 2005 .
[4] Manfredi Bruccoleri,et al. Distributed intelligent control of exceptions in reconfigurable manufacturing systems , 2003 .
[5] Hoda A. ElMaraghy,et al. Assessing capacity scalability policies in RMS using system dynamics , 2007 .
[6] F. Jovane,et al. Reconfigurable Manufacturing Systems , 1999 .
[7] A. Galip Ulsoy,et al. Reconfigurable manufacturing systems: Key to future manufacturing , 2000, J. Intell. Manuf..
[8] Randall P. Sadowski,et al. Simulation with Arena , 1998 .
[9] A. Galip Ulsoy,et al. Capacity Management in Reconfigurable Manufacturing Systems With Stochastic Market Demand , 2002 .
[10] Ahmed M. Deif,et al. Integrating static and dynamic analysis in studying capacity scalability in RMS , 2007, Int. J. Manuf. Res..
[11] Neil A. Duffie,et al. Design and Analysis of Closed-Loop Capacity Control for a Multi-Workstation Production System , 2005 .
[12] Waguih ElMaraghy,et al. Investigating optimal capacity scalability scheduling in a reconfigurable manufacturing system , 2007 .
[13] Hoda A. ElMaraghy,et al. Flexible and reconfigurable manufacturing systems paradigms , 2005 .
[14] Neil A. Duffie,et al. Control-Theoretic Analysis of a Closed-Loop PPC System , 2002 .