Recent Developments in Closed-Loop Approaches for Real-Time Mining and Petroleum Extraction
暂无分享,去创建一个
[1] Gary Froyland,et al. Mining Schedule Optimisation for Conditionally Simulated Orebodies , 2018 .
[2] Benoit Couet,et al. Production Enhancement through Integrated Asset Modeling Optimization , 2010 .
[3] Roussos Dimitrakopoulos,et al. Stochastic optimization for strategic mine planning: A decade of developments , 2011 .
[4] Roussos Dimitrakopoulos,et al. Moving forward from traditional optimization: grade uncertainty and risk effects in open-pit design , 2002 .
[5] Jacques Rivoirard,et al. Multivariate uniform conditioning and block simulations with discrete gaussian model: application to Chuquicamata deposit , 2008 .
[6] Tor Arne Johansen,et al. Real-Time Production Optimization of Oil and Gas Production Systems: A Technology Survey , 2007 .
[7] Ning Liu,et al. Inverse Theory for Petroleum Reservoir Characterization and History Matching , 2008 .
[8] Michael Andrew Christie,et al. Comparison of Stochastic Sampling Algorithms for Uncertainty Quantification , 2010 .
[9] Louis J. Durlofsky,et al. A New Well-Pattern-Optimization Procedure for Large-Scale Field Development , 2011 .
[10] Vivek K. Goyal,et al. Compressed History Matching: Exploiting Transform-Domain Sparsity for Regularization of Nonlinear Dynamic Data Integration Problems , 2010 .
[11] A. Journel. Geostatistics for Conditional Simulation of Ore Bodies , 1974 .
[12] Dean S. Oliver,et al. THE ENSEMBLE KALMAN FILTER IN RESERVOIR ENGINEERING-A REVIEW , 2009 .
[13] James T. Lin,et al. Simulation optimization approach for hybrid flow shop scheduling problem in semiconductor back-end manufacturing , 2015, Simul. Model. Pract. Theory.
[14] Walter Valery,et al. The use of radio frequency ID tags to track ore in mining operations , 2007 .
[15] L. Durlofsky,et al. Production Optimization with Adjoint Models under Nonlinear Control-State Path Inequality Constraints , 2008 .
[16] Chaohui Chen,et al. Closed-loop reservoir management on the Brugge test case , 2010 .
[17] P.M.J. Van den Hof,et al. Value of Information in Closed-loop Reservoir , 2014 .
[18] J. Benndorf,et al. New Efficient Methods for Conditional Simulations of Large Orebodies , 2018 .
[19] Markus Krosche,et al. Ensemble-Based Water Flooding Optimization Applied to Mature Fields , 2011 .
[20] Roland N. Horne,et al. Multiresolution Wavelet Analysis for Improved Reservoir Description , 2005 .
[21] D. Maguire. The raster GIS design model: a profile of ERDAS , 1992 .
[22] W. Bailey,et al. Field Optimization Tool for Maximizing Asset Value , 2005 .
[23] D. Oliver,et al. Recent progress on reservoir history matching: a review , 2011 .
[24] Roddy V. Amenta. An interactive FORTRAN program for cross-correlation of signals on a PC with CGA graphics: an application in marine geoacoustics , 1990 .
[25] Louis J. Durlofsky,et al. Optimization of Nonconventional Well Type, Location, and Trajectory , 2003 .
[26] Hing Kai Chan,et al. A modified genetic algorithm approach for scheduling of perfect maintenance in distributed production scheduling , 2009, Eng. Appl. Artif. Intell..
[27] Yuqing Chang,et al. Multi-objective optimization for rapid and robust optimal oilfield development under geological uncertainty , 2015, Computational Geosciences.
[28] Shuyu Sun,et al. Synergizing Crosswell Seismic and Electromagnetic Techniques for Enhancing Reservoir Characterization , 2016 .
[29] J. Benndorf,et al. RTRO–Coal: Real-Time Resource-Reconciliation and Optimization for Exploitation of Coal Deposits , 2015 .
[30] David Ginsbourger,et al. Fast Update of Conditional Simulation Ensembles , 2015, Mathematical Geosciences.
[31] J. Jansen,et al. A Stochastic Simplex Approximate Gradient (StoSAG) for optimization under uncertainty , 2017 .
[32] Alexandra M. Newman,et al. A Review of Operations Research in Mine Planning , 2010, Interfaces.
[33] Jef Caers,et al. Modeling Uncertainty in the Earth Sciences , 2011 .
[34] G. Evensen. Data Assimilation: The Ensemble Kalman Filter , 2006 .
[35] A. Auger,et al. Well placement optimization with the covariance matrix adaptation evolution strategy and meta-models , 2011, Computational Geosciences.
[36] Louis J. Durlofsky,et al. A New Approach to Automatic History Matching Using Kernel PCA , 2007 .
[37] J. Benndorf,et al. Stochastic long-term production scheduling of iron ore deposits: Integrating joint multi-element geological uncertainty , 2013, Journal of Mining Science.
[38] Louis J. Durlofsky,et al. Closed-Loop Field Development Under Uncertainty by Use of Optimization With Sample Validation , 2015 .
[39] Dongxiao Zhang,et al. Efficient Ensemble-Based Closed-Loop Production Optimization , 2009 .
[40] Louis J. Durlofsky,et al. Production Optimization With Adjoint Models Under Nonlinear Control-State Path Inequality Constraints , 2008 .
[41] Albert C. Reynolds,et al. Robust Constrained Optimization of Short- and Long-Term Net Present Value for Closed-Loop Reservoir Management , 2012 .
[42] Javad Sattarvand,et al. Integrating geological uncertainty in long-term open pit mine production planning by ant colony optimization , 2016, Comput. Geosci..
[43] H M Parker,et al. Reconciliation principles for the mining industry , 2012 .
[44] J. Caers. Modeling Uncertainty in the Earth Sciences: Caers/Modeling Uncertainty in the Earth Sciences , 2011 .
[45] Jan Dirk Jansen,et al. Smart Well Solutions for Thin Oil Rims: Inflow Switching and the Smart Stinger Completion , 2002 .
[46] Alexandre Boucher,et al. Block Simulation of Multiple Correlated Variables , 2009 .
[47] A. R. Crathorne,et al. Economic Control of Quality of Manufactured Product. , 1933 .
[48] Paul M.J. Van den Hof,et al. Model and Economic Uncertainties in Balancing Short-Term and Long-Term Objectives in Water-Flooding Optimization , 2015, ANSS 2015.
[49] Geir Evensen,et al. The Ensemble Kalman Filter: theoretical formulation and practical implementation , 2003 .
[50] Roland Klees,et al. History matching time-lapse surface-gravity and well-pressure data with ensemble smoother for estimating gas field aquifer support - A 3D numerical study , 2012 .
[51] Albert C. Reynolds,et al. History-Matching Production and Seismic Data in a Real Field Case Using the Ensemble Smoother With Multiple Data Assimilation , 2013, ANSS 2013.
[52] J Benndorf,et al. Real-Time Mining: Moving towards continuous process management in mineral resource extraction , 2015 .
[53] Louis J. Durlofsky,et al. Computational Techniques for Closed-Loop Reservoir Modeling with Application to a Realistic Reservoir , 2006 .
[54] L. Durlofsky,et al. Adjoint formulation and constraint handling for gradient-based optimization of compositional reservoir flow , 2014, Computational Geosciences.
[55] Karim Salahshoor,et al. Application of multi-criterion robust optimization in water-flooding of oil reservoir , 2013 .
[56] J. Gómez-Hernández,et al. Inverse sequential simulation: A new approach for the characterization of hydraulic conductivities demonstrated on a non‐Gaussian field , 2015 .
[57] Chunhong Wang,et al. Production Optimization in Closed-Loop Reservoir Management , 2009 .
[58] T. Başar,et al. A New Approach to Linear Filtering and Prediction Problems , 2001 .
[59] O. Bosgra,et al. Controllability and observability in two-phase porous media flow , 2013, Computational Geosciences.
[60] Michael Lev Litvak,et al. Field Development Optimization Applied to Giant Oil Fields , 2009 .
[61] A. Reynolds,et al. Optimization of the well locations and completions for vertical and horizontal wells using a derivative-free optimization algorithm , 2012 .
[62] Dean S. Oliver,et al. History Matching of Three-Phase Flow Production Data , 2003 .
[63] Eduardo Goncalves Dias De Barros,et al. Value of information in closed-loop reservoir management , 2014 .
[64] Faouzi Masmoudi,et al. A comprehensive literature classification of simulation optimisation methods , 2010 .
[65] Jan Dirk Jansen,et al. Improved Reservoir Management Through Optimal Control and Continuous Model Updating , 2004 .
[66] Michael Nikolaou,et al. Real-time reservoir management: A multiscale adaptive optimization and control approach , 2006 .
[67] G. Mariéthoz,et al. Multiple-point Geostatistics: Stochastic Modeling with Training Images , 2014 .
[68] Geir Evensen,et al. Structural Surface Uncertainty Modeling and Updating Using the Ensemble Kalman Filter , 2010 .
[69] M. W. Davis,et al. Production of conditional simulations via the LU triangular decomposition of the covariance matrix , 1987, Mathematical Geology.
[70] Albert C. Reynolds,et al. An Adaptive Hierarchical Algorithm for Estimation of Optimal Well Controls , 2013, ANSS 2013.
[71] L. Durlofsky,et al. Application of a particle swarm optimization algorithm for determining optimum well location and type , 2010 .
[72] N. Zogović,et al. A Framework for ICT Support to Sustainable Mining - An Integral Approach , 2015 .
[73] A. Soares. Direct Sequential Simulation and Cosimulation , 2001 .
[74] Wen H. Chen,et al. Efficient Well Placement Optimization with Gradient-based Algorithms and Adjoint Models , 2008 .
[75] Jan Dirk Jansen,et al. Adjoint-Based Well Trajectory Optimization , 2009 .
[76] S Vlemmix,et al. Adjoint-based well trajectory optimization in a thin oil rim , 2009 .
[77] A. Reynolds,et al. Joint optimization of number of wells, well locations and controls using a gradient-based algorithm , 2014 .
[78] John C. Mankins,et al. Technology Readiness Levels-A White Paper , 1995 .
[79] Bjarne A. Foss,et al. A Mean-Variance Objective for Robust Production Optimization in Uncertain Geological Scenarios , 2015 .
[80] Akhil Datta-Gupta,et al. Optimal Rate Control Under Geologic Uncertainty , 2008 .
[81] Albert C. Reynolds,et al. History matching with parametrization based on the SVD of a dimensionless sensitivity matrix , 2010 .
[82] I. Pan,et al. Robust optimization of subsurface flow using polynomial chaos and response surface surrogates , 2015, Computational Geosciences.
[83] P. A. Swaby,et al. Combining Geostatistical Modelling With Gradient Information for History Matching: The Pilot Point Method , 1997 .
[84] Louis J. Durlofsky,et al. Generalized Field-Development Optimization With Derivative-Free Procedures , 2014 .
[85] Y. Yortsos,et al. Optimization of fluid front dynamics in porous media using rate control. I. Equal mobility fluids , 2000 .
[86] J. Benndorf,et al. The effect of geological uncertainty on achieving short-term targets: A quantitative approach using Stochastic process simulation , 2015 .
[87] Chunhong Wang,et al. Optimal Well Placement for Production Optimization , 2007 .
[88] Roussos G. Dimitrakopoulos,et al. Implementation of conditional simulation by successive residuals , 2011, Comput. Geosci..
[89] Jan Dirk Jansen,et al. Adjoint-based optimization of multi-phase flow through porous media – A review , 2011 .
[90] Jan Dirk Jansen,et al. Waterflooding using closed-loop control , 2006 .
[91] A. Reynolds,et al. Simultaneous and Sequential Estimation of Optimal Placement and Controls of Wells With a Covariance Matrix Adaptation Algorithm , 2016 .
[92] Mrinal K. Sen,et al. On optimization algorithms for the reservoir oil well placement problem , 2006 .
[93] Henning Omre,et al. Improved Production Forecasts and History Matching Using Approximate Fluid-Flow Simulators , 2004 .
[94] Gijs van Essen,et al. Robust Waterflooding Optimization of Multiple Geological Scenarios , 2006 .
[95] Paul M.J. Van den Hof,et al. Model-based control of multiphase flow in subsurface oil reservoirs , 2008 .
[96] Albert C. Reynolds,et al. History matching with parameterization based on singular-value decomposition of a dimensionless sensitivity matrix , 2010 .
[97] Michael Nikolaou,et al. Short-term Production Optimization by Automated Adaptive Modeling and Control , 2008 .
[98] T. Wambeke,et al. Data assimilation of sensor measurements to improve production forecast in resource extraction , 2015 .
[99] Albert C. Reynolds,et al. Results of the Brugge Benchmark Study for Flooding Optimization and History Matching , 2010 .
[100] John Bagterp Jørgensen,et al. Waterflooding optimization in uncertain geological scenarios , 2013, Computational Geosciences.
[101] Long Jin,et al. A Comparison of Stochastic Data-Integration Algorithms for the Joint History Matching of Production and Time-Lapse-Seismic Data , 2012 .
[102] Louis J. Durlofsky,et al. Application of derivative-free methodologies to generally constrained oil production optimisation problems , 2011, Int. J. Math. Model. Numer. Optimisation.
[103] P.M.J. Van den Hof,et al. Ensemble-Based Multi-Objective Optimization of On-Off Control Devices Under Geological Uncertainty , 2015, ANSS 2015.
[104] Marco R. Thiele,et al. Revisiting Reservoir Flood-Surveillance Methods Using Streamlines , 2005 .
[105] L. Durlofsky,et al. Efficient real-time reservoir management using adjoint-based optimal control and model updating , 2006 .
[106] Gijs van Essen,et al. Hierarchical Long Term and Short Term Production Optimization , 2009 .
[107] Marco R. Thiele,et al. Revisiting Reservoir Flood-Surveillance Methods Using Streamlines , 2008 .
[108] Olwijn Leeuwenburgh,et al. Seismic History Matching of Fluid Fronts Using the Ensemble Kalman Filter , 2013 .
[109] Olwijn Leeuwenburgh,et al. Ensemble-Based Multiobjective Optimization of On/Off Control Devices Under Geological Uncertainty , 2015 .
[110] Ji Li,et al. Data Driven Production Forecasting Using Machine Learning , 2016 .
[111] Dennis Denney. Improved and More-Rapid History Matching With a Nonlinear Proxy and Global Optimization , 2007 .
[112] Faruk O. Alpak,et al. Stochastic History Matching of a Deepwater Turbidite Reservoir , 2009 .
[113] D. Marcotte. Direct Conditional Simulation of Block Grades , 1994 .
[114] L. Durlofsky,et al. A derivative-free methodology with local and global search for the constrained joint optimization of well locations and controls , 2014, Computational Geosciences.
[115] Dean S. Oliver,et al. Ensemble-Based Closed-Loop Optimization Applied to Brugge Field , 2010 .
[116] Albert C. Reynolds,et al. Gradient-based multi-objective optimization with applications to waterflooding optimization , 2016, Computational Geosciences.
[117] Svein Ivar Sagatun. Boundary Control of a Horizontal Oil Reservoir , 2010 .
[118] Robert Aasheim,et al. Closed-Loop Feedback Control in Intelligent Wells: Application to a Heterogeneous, Thin Oil-Rim Reservoir in the North Sea , 2015 .
[119] Gijs van Essen,et al. Adjoint-Based Well-Placement Optimization Under Production Constraints , 2008 .
[120] H. Milton Stewart,et al. Risk control in ultimate pits using conditional simulations , 2009 .
[121] Oscar Rondon. Teaching Aid: Minimum/Maximum Autocorrelation Factors for Joint Simulation of Attributes , 2011, Mathematical Geosciences.
[122] Albert C. Reynolds,et al. Life-cycle production optimization of an oil field with an adjoint-based gradient approach , 2013 .
[123] R. Dimitrakopoulos,et al. Conditional Simulation of Random Fields by Successive Residuals , 2002 .
[124] Geir Evensen,et al. Reservoir management under geological uncertainty using fast model update , 2015, ANSS 2015.
[125] Behnam Jafarpour,et al. Efficient Permeability Parameterization With the Discrete Cosine Transform , 2007 .
[126] Louis J. Durlofsky,et al. Application of derivative-free methodologies to generally constrained oil production optimization problems , 2010, ICCS.
[127] Roald Brouwer,et al. Closed Loop Reservoir Management , 2009 .
[128] R. Schulze-Riegert,et al. Evolutionary Algorithms Applied to History Matching of Complex Reservoirs , 2002 .
[129] Chaodong Yang,et al. Reservoir Model Uncertainty Quantification Through Computer-Assisted History Matching , 2007 .
[130] Duc H. Le,et al. An Adaptive Ensemble Smoother with Multiple Data Assimilation for Assisted History Matching , 2015, ANSS 2015.
[131] Ronald D. Haynes,et al. Joint optimization of well placement and control for nonconventional well types , 2015 .
[132] Sippe G. Douma,et al. Optimization Of Smart Wells in the St. Joseph Field , 2010 .
[133] K. F. Jupp,et al. Role of pre-crusher stockpiling for grade control in iron ore mining , 2013 .
[134] Sippe G. Douma,et al. Optimization Of Smart Wells In The St. Joseph Field , 2009 .
[135] Lin Cao,et al. A Physics-Based Data-Driven Numerical Model for Reservoir History Matching and Prediction With a Field Application , 2016 .
[136] Jan Dirk Jansen,et al. Dynamic Optimization of Waterflooding With Smart Wells Using Optimal Control Theory , 2004 .
[137] Bjarne A. Foss,et al. Performance Analysis for Closed-Loop Reservoir Management , 2011 .
[138] O. Bosgra,et al. Controllability, observability and identifiability in single-phase porous media flow , 2008 .
[139] Behnam Jafarpour,et al. Reservoir Characterization With the Discrete Cosine Transform , 2009 .
[140] C. W. Harper,et al. A FORTRAN IV program for comparing ranking algorithms in quantitative biostratigraphy , 1984 .
[141] B. Jafarpour,et al. A simultaneous perturbation stochastic approximation algorithm for coupled well placement and control optimization under geologic uncertainty , 2013, Computational Geosciences.
[142] J. Jansen,et al. Closed-loop reservoir management , 2005 .
[143] Amol Bakshi,et al. Lessons Learned From World-wide Deployments Of Model-based Real Time Production Optimization Solutions , 2015 .
[144] R. Dimitrakopoulos,et al. Managing risk and waste mining in long-term production scheduling of open-pit mines , 2004 .
[145] Mathias C. Bellout,et al. Well placement optimization subject to realistic field development constraints , 2016, Computational Geosciences.
[146] Jian Hou,et al. A review of closed-loop reservoir management , 2015, Petroleum Science.
[147] W. B. Whalley,et al. The use of fractals and pseudofractals in the analysis of two-dimensional outlines: Review and further exploration , 1989 .
[148] Louis J. Durlofsky,et al. Comprehensive framework for gradient-based optimization in closed-loop reservoir management , 2015, Computational Geosciences.
[149] Tor Arne Johansen,et al. Incorporating 4D Seismic Data in Reservoir Simulation Models Using Ensemble Kalman Filter , 2005 .
[150] Amina Lamghari,et al. A diversified Tabu search approach for the open-pit mine production scheduling problem with metal uncertainty , 2012, Eur. J. Oper. Res..
[151] Roland N. Horne,et al. Optimization of Well Placement in a Gulf of Mexico Waterflooding Project , 2002 .
[152] Albert Tarantola,et al. Inverse problem theory - and methods for model parameter estimation , 2004 .
[153] A. Journel,et al. Reservoir Modeling Using Multiple-Point Statistics , 2001 .
[154] Jan Dirk Jansen,et al. Dynamic Optimization of Water Flooding with Smart Wells Using Optimal Control Theory , 2002 .
[155] van Gm Essen,et al. A two-level strategy to realize life-cycle production optimization in an operational setting , 2013 .
[156] Richard F. Hartl,et al. Simulation-based optimization methods for setting production planning parameters , 2014 .
[157] Kalpesh Patel,et al. Use of Model-Predictive Control for Automating SAGD Well-Pair Operations: A Simulation Study , 2014 .
[158] P. C. Shah,et al. Reservoir History Matching by Bayesian Estimation , 1976 .
[159] A. R. Bye,et al. Scenario thinking – a powerful tool for strategic planning and evaluation of mining projects and operations , 2012 .
[160] G. W. Verly,et al. Sequential Gaussian Cosimulation: A Simulation Method Integrating Several Types of Information , 1993 .
[161] M. Kumral,et al. A simulated annealing approach to mine production scheduling , 2005, J. Oper. Res. Soc..
[162] Clayton V. Deutsch,et al. A Practical Methodology For Integration of 4D Seismic in Steam-Assisted-Gravity-Drainage Reservoir Characterization , 2017 .
[163] J. Benndorf,et al. Real-time resource model updating for improved coal quality control using online data , 2016 .
[164] J. Benndorf,et al. Making Use of Online Production Data: Sequential Updating of Mineral Resource Models , 2015, Mathematical Geosciences.
[165] Roussos Dimitrakopoulos,et al. Algorithmic integration of geological uncertainty in pushback designs for complex multiprocess open pit mines , 2013 .
[166] Larry W. Lake,et al. Field applications of capacitance-resistive models in waterfloods , 2009 .