Production planning and control of closed-loop supply chains

Closed-loop supply chains are characterized by the recovery of returned products. In most of these chains (e.g. glass, metal, paper, computers, copiers), used products (also known as cores) are returned by or collected from customers. But returned products can also come from production facilities within the supply chain (production defectives, by-products. In cases with internal returns, recovery is often referred to as rework.

[1]  Rajesh Srivastava,et al.  Scheduling policies for remanufacturing , 1997 .

[2]  Peter Schuur,et al.  On a medium term product recovery and disposal strategy for durable assembly products , 1998 .

[3]  Alfred J.D. Lambert,et al.  Linear programming in disassembly/clustering sequence generation , 1999 .

[4]  M. S. Spencer,et al.  An evaluation of capacity planning techniques in a remanufacturing environment , 1997 .

[5]  K. Inderfurth,et al.  Performance of MRP in Product Recovery Systems with Demand, Return and Leadtime Uncertainties , 2002 .

[6]  Naoki Uchiyama,et al.  Disassembly Path Generation to Verify the Assemblability of Mechanical Products , 1995 .

[7]  M. H. Wang,et al.  ECONOMICAL EVALUATION OF DISASSEMBLY OPERATIONS FOR RECYCLING, REMANUFACTURING AND REUSE , 1998 .

[8]  de Aj Ad Ron,et al.  Determination of a disassembly strategy , 1996 .

[9]  W. Eversheim,et al.  A Key Issue in Product Life Cycle: Disassembly , 1993 .

[10]  Shad Dowlatshahi,et al.  Developing a Theory of Reverse Logistics , 2000, Interfaces.

[11]  Surendra M. Gupta,et al.  ENVIRONMENTAL CONCERNS AND RECYCLING/DISASSEMBLY EFFORTS IN THE ELECTRONICS INDUSTRY , 1997 .

[12]  Josef Kallrath,et al.  Mixed-Integer Nonlinear Programming Applications , 1999 .

[13]  Elizabeth M. Jewkes,et al.  A QUEUEING ANALYSIS OF PRIORITY-BASED SCHEDULING RULES FOR A SINGLE-STAGE MANUFACTURING SYSTEM WITH REPAIR , 1994 .

[14]  V. Guide,et al.  Production planning and control for remanufacturing: industry practice and research needs , 2000 .

[15]  T. C. Woo,et al.  Algorithm for multiple disassembly and parallel assemblies , 1995 .

[16]  R. Guide,et al.  Rough-cut capacity planning for remanufacturing firms , 1997 .

[17]  A. Kriwet,et al.  Disassembly-Oriented Assessment Methodology to Support Design for Recycling , 1994 .

[18]  Surendra M. Gupta,et al.  Disassembly of complex product structures with parts and materials commonality , 1997 .

[19]  John O. McClain,et al.  The good, the bad and the ugly: Quality on an assembly line , 1990 .

[20]  Surendra M. Gupta,et al.  Operations Planning Issues in an Assembly/Disassembly Environment , 1994 .

[21]  Eric V. Denardo,et al.  Managing Uncertainty in a Serial Production Line , 1996, Oper. Res..

[22]  Surendra M. Gupta,et al.  High-mix/low-volume batch of electronic equipment disassembly , 1998 .

[23]  Rajesh Srivastava,et al.  Inventory buffers in recoverable manufacturing , 1998 .

[24]  V. Daniel R. Guide,et al.  An evaluation of order release strategies in a remanufacturing environment , 1997, Comput. Oper. Res..

[25]  Rajesh Srivastava,et al.  Product structure complexity and scheduling of operations in recoverable manufacturing , 1997 .

[26]  Tarun Gupta,et al.  Looping in a multistage production system , 1984 .

[27]  Aart van Harten,et al.  Business case Roteb: recovery strategies for monitors , 1999 .

[28]  Alfred J.D. Lambert Optimal disassembly of complex products , 1994 .

[29]  Elizabeth M. Jewkes Optimal inspection effort and scheduling for a manufacturing process with repair , 1995 .

[30]  Simme Douwe P. Flapper,et al.  On the logistic aspects of integrating procurement, production and recycling by lean and agile-wise manufacturing companies , 1994 .

[31]  Iie T. N. Goh Senior Member,et al.  A Statistical Methodology for the Analysis of the Life-Cycle of Reusable Containers , 1986 .

[32]  Shiang-Fong Chen,et al.  Parallel Disassembly by Onion Peeling , 1997 .

[33]  T. Spengler,et al.  Environmental integrated production and recycling management , 1997 .

[34]  Askiner Gungor,et al.  Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .

[35]  Karl Inderfurth,et al.  Analysis of MRP Policies with Recovery Options , 1999 .

[36]  Surendra M. Gupta,et al.  Disassembly of multiple product structures , 1997 .

[37]  Rainer Kleber,et al.  Reverse logistics in a pharmaceutical company: a case study , 2003 .

[38]  R. Uzsoy,et al.  Production planning for companies with remanufacturing capability , 1995, Proceedings of the 1995 IEEE International Symposium on Electronics and the Environment ISEE (Cat. No.95CH35718).

[39]  Karl Inderfurth,et al.  Planning and control of rework in the process industries: A review , 2002 .

[40]  V. D. R. Guide Scheduling using drum-buffer-rope in a remanufacturing environment , 1996 .

[41]  E. Zussman,et al.  Evaluating the end-of-life value of a product andimproving it by redesign , 1997 .