Production planning and control of closed-loop supply chains
暂无分享,去创建一个
[1] Rajesh Srivastava,et al. Scheduling policies for remanufacturing , 1997 .
[2] Peter Schuur,et al. On a medium term product recovery and disposal strategy for durable assembly products , 1998 .
[3] Alfred J.D. Lambert,et al. Linear programming in disassembly/clustering sequence generation , 1999 .
[4] M. S. Spencer,et al. An evaluation of capacity planning techniques in a remanufacturing environment , 1997 .
[5] K. Inderfurth,et al. Performance of MRP in Product Recovery Systems with Demand, Return and Leadtime Uncertainties , 2002 .
[6] Naoki Uchiyama,et al. Disassembly Path Generation to Verify the Assemblability of Mechanical Products , 1995 .
[7] M. H. Wang,et al. ECONOMICAL EVALUATION OF DISASSEMBLY OPERATIONS FOR RECYCLING, REMANUFACTURING AND REUSE , 1998 .
[8] de Aj Ad Ron,et al. Determination of a disassembly strategy , 1996 .
[9] W. Eversheim,et al. A Key Issue in Product Life Cycle: Disassembly , 1993 .
[10] Shad Dowlatshahi,et al. Developing a Theory of Reverse Logistics , 2000, Interfaces.
[11] Surendra M. Gupta,et al. ENVIRONMENTAL CONCERNS AND RECYCLING/DISASSEMBLY EFFORTS IN THE ELECTRONICS INDUSTRY , 1997 .
[12] Josef Kallrath,et al. Mixed-Integer Nonlinear Programming Applications , 1999 .
[13] Elizabeth M. Jewkes,et al. A QUEUEING ANALYSIS OF PRIORITY-BASED SCHEDULING RULES FOR A SINGLE-STAGE MANUFACTURING SYSTEM WITH REPAIR , 1994 .
[14] V. Guide,et al. Production planning and control for remanufacturing: industry practice and research needs , 2000 .
[15] T. C. Woo,et al. Algorithm for multiple disassembly and parallel assemblies , 1995 .
[16] R. Guide,et al. Rough-cut capacity planning for remanufacturing firms , 1997 .
[17] A. Kriwet,et al. Disassembly-Oriented Assessment Methodology to Support Design for Recycling , 1994 .
[18] Surendra M. Gupta,et al. Disassembly of complex product structures with parts and materials commonality , 1997 .
[19] John O. McClain,et al. The good, the bad and the ugly: Quality on an assembly line , 1990 .
[20] Surendra M. Gupta,et al. Operations Planning Issues in an Assembly/Disassembly Environment , 1994 .
[21] Eric V. Denardo,et al. Managing Uncertainty in a Serial Production Line , 1996, Oper. Res..
[22] Surendra M. Gupta,et al. High-mix/low-volume batch of electronic equipment disassembly , 1998 .
[23] Rajesh Srivastava,et al. Inventory buffers in recoverable manufacturing , 1998 .
[24] V. Daniel R. Guide,et al. An evaluation of order release strategies in a remanufacturing environment , 1997, Comput. Oper. Res..
[25] Rajesh Srivastava,et al. Product structure complexity and scheduling of operations in recoverable manufacturing , 1997 .
[26] Tarun Gupta,et al. Looping in a multistage production system , 1984 .
[27] Aart van Harten,et al. Business case Roteb: recovery strategies for monitors , 1999 .
[28] Alfred J.D. Lambert. Optimal disassembly of complex products , 1994 .
[29] Elizabeth M. Jewkes. Optimal inspection effort and scheduling for a manufacturing process with repair , 1995 .
[30] Simme Douwe P. Flapper,et al. On the logistic aspects of integrating procurement, production and recycling by lean and agile-wise manufacturing companies , 1994 .
[31] Iie T. N. Goh Senior Member,et al. A Statistical Methodology for the Analysis of the Life-Cycle of Reusable Containers , 1986 .
[32] Shiang-Fong Chen,et al. Parallel Disassembly by Onion Peeling , 1997 .
[33] T. Spengler,et al. Environmental integrated production and recycling management , 1997 .
[34] Askiner Gungor,et al. Issues in environmentally conscious manufacturing and product recovery: a survey , 1999 .
[35] Karl Inderfurth,et al. Analysis of MRP Policies with Recovery Options , 1999 .
[36] Surendra M. Gupta,et al. Disassembly of multiple product structures , 1997 .
[37] Rainer Kleber,et al. Reverse logistics in a pharmaceutical company: a case study , 2003 .
[38] R. Uzsoy,et al. Production planning for companies with remanufacturing capability , 1995, Proceedings of the 1995 IEEE International Symposium on Electronics and the Environment ISEE (Cat. No.95CH35718).
[39] Karl Inderfurth,et al. Planning and control of rework in the process industries: A review , 2002 .
[40] V. D. R. Guide. Scheduling using drum-buffer-rope in a remanufacturing environment , 1996 .
[41] E. Zussman,et al. Evaluating the end-of-life value of a product andimproving it by redesign , 1997 .