Influence of controllable lead time, premium price, and unequal shipments under environmental effects in a supply chain management

Recently, carbon emission becomes a major issue during transportation of products from one player to another player. Due to the increasing number of single-setup-multi-delivery (SSMD) policies by several industries, fixed and variable transportation cost and carbon emission cost are considered. The aim of the model is to reduce the total cost of supply chain for controlling the lead time and to diminish setup cost by a discrete investment. A premium cost is introduced and Stackelberg game policy is employed to obtain the analytical solution. Some numerical examples are given to validate the model. Sensitivity analysis and managerial insights are given to show the applicability of the model. Finally, the outcomes show that the model minimizes the optimum cost at the optimal values of the decision variables. It is found that the total cost is minimized when the multi-buyer is leader and vendor is follower.

[1]  R. Chiumeo,et al.  Technical–economic sustainability of premium power parks , 2015 .

[2]  Evan L. Porteus Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..

[3]  Kin Keung Lai,et al.  Model and algorithm of an inventory problem with the consideration of transportation cost , 2004, Comput. Ind. Eng..

[4]  Wei Xie,et al.  A control-chart-based queueing approach for service facility maintenance with energy-delay tradeoff , 2017, Eur. J. Oper. Res..

[5]  YiLi Chien,et al.  The Risk Premium and Long-Run Global Imbalances , 2011 .

[6]  I. D. Wangsa Greenhouse gas penalty and incentive policies for a joint economic lot size model with industrial and transport emissions , 2017 .

[7]  Bo Zhang,et al.  The uncertain premium principle based on the distortion function , 2013 .

[8]  H. Wee,et al.  Sustainable inventory management with deteriorating and imperfect quality items considering carbon emission , 2018, Journal of Cleaner Production.

[9]  Parviz Fattahi,et al.  A Heuristic Method for Solving Bi-Objective Two-Stage Hybrid Flow Shop Scheduling Problem , 2017 .

[10]  Biswajit Sarkar,et al.  A production-inventory model with probabilistic deterioration in two-echelon supply chain management , 2013 .

[11]  Ata Allah Taleizadeh,et al.  Lead time aggregation: A three-echelon supply chain model , 2016 .

[12]  B. Sarkar,et al.  Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process , 2014 .

[13]  Lang Hong,et al.  Automated traffic surveillance using fusion of Doppler radar and video information , 2011, Math. Comput. Model..

[15]  M. Jaber,et al.  Carbon emissions and energy effects on a two-level manufacturer-retailer closed-loop supply chain model with remanufacturing subject to different coordination mechanisms , 2017 .

[16]  Liang-Yuh Ouyang,et al.  Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process , 2002, Comput. Oper. Res..

[17]  Ilkyeong Moon,et al.  Manufacturing setup cost reduction and quality improvement for the distribution free continuous-review inventory model with a service level constraint , 2015 .

[18]  B. Sarkar Supply Chain Coordination with Variable Backorder, Inspections, and Discount Policy for Fixed Lifetime Products , 2016 .

[19]  Sunil Tiwari,et al.  Big data analytics in supply chain management between 2010 and 2016: Insights to industries , 2018, Comput. Ind. Eng..

[20]  M. Jaber,et al.  A joint economic lot size model with price and environmentally sensitive demand , 2014 .

[21]  B. Sarkar,et al.  Quality improvement and backorder price discount under controllable lead time in an inventory model , 2015 .

[22]  Stanley Zionts,et al.  Efficient lot-sizing under a differential transportation cost structure for serially distributed warehouses , 2000, Eur. J. Oper. Res..

[23]  Sojung Kim,et al.  Lane selection behavior modeling in an agent-based traffic simulation , 2017 .

[24]  Jinn-Tsair Teng,et al.  The economic lot size of the integrated vendor-buyer inventory system derived without derivatives: A simple derivation , 2011, Appl. Math. Comput..

[25]  R. Ibrahim,et al.  Joint economic lot size in distribution system with multiple shipment policy , 2006 .

[26]  Mohammad Mohammadi,et al.  A Multi-Objective Evolutionary Algorithm for Scheduling Flexible Manufacturing Systems , 2017 .

[27]  Alexandre Dolgui,et al.  Minimizing setup costs in a transfer line design problem with sequential operation processing , 2014 .

[28]  Xuexi Huo,et al.  Willingness-to-pay price premiums for certified fruits -A case of fresh apples in China , 2016 .

[29]  Hui-Ming Wee,et al.  A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives , 2007, Eur. J. Oper. Res..

[30]  Biswajit Sarkar,et al.  Integrated vendor-buyer supply chain model with vendor's setup cost reduction , 2013, Appl. Math. Comput..

[31]  Moncer Hariga,et al.  Storage constrained vendor managed inventory models with unequal shipment frequencies , 2014 .

[32]  M. Jaber,et al.  Supply chain coordination with emissions reduction incentives , 2013 .

[33]  Bikash Koli Dey,et al.  Two-echelon supply chain model with manufacturing quality improvement and setup cost reduction , 2016 .

[34]  Yong-Wu Zhou,et al.  Optimal production and shipment models for a single-vendor-single-buyer integrated system , 2007, Eur. J. Oper. Res..

[35]  Biswajit Sarkar,et al.  Product inspection policy for an imperfect production system with inspection errors and warranty cost , 2016, Eur. J. Oper. Res..

[36]  Po-Chung Yang,et al.  An integrated multi-lot-size production inventory model for deteriorating item , 2003, Comput. Oper. Res..

[37]  B. Sarkar,et al.  Effect of variable transportation and carbon emission in a three-echelon supply chain model , 2016 .

[38]  Leopoldo Eduardo Cárdenas-Barrón,et al.  Optimizing inventory decisions in a multi-stage multi-customer supply chain: A note , 2007 .

[39]  B. Sarkar,et al.  Effect of Unequal Lot Sizes, Variable Setup Cost, and Carbon Emission Cost in a Supply Chain Model , 2015 .

[40]  K. S. Chaudhuri,et al.  An optimal shipment strategy for imperfect items in a stock-out situation , 2011, Math. Comput. Model..

[41]  Bijoy Kumar Shaw,et al.  An integrated inventory model with variable transportation cost, two-stage inspection, and defective items , 2017 .

[42]  Biswajit Sarkar,et al.  Periodic review fuzzy inventory model with variable lead time and fuzzy demand , 2017, Int. Trans. Oper. Res..

[43]  Ata Allah Taleizadeh,et al.  A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process , 2014 .

[44]  Ju Young Park Is there a price premium for energy efficiency labels? Evidence from the Introduction of a Label in Korea , 2017 .

[45]  M. Wahab,et al.  EOQ models for a coordinated two-level international supply chain considering imperfect items and environmental impact , 2011 .

[46]  Antti Petajisto The Index Premium and its Hidden Cost for Index Funds , 2010 .

[47]  R. Uthayakumar,et al.  Controlling setup cost in (Q, r, L) inventory model with defective items , 2010 .

[48]  Matthew C. Li US term structure and international stock market volatility: The role of the expectations factor and the maturity premium , 2016 .

[49]  R. Bhar,et al.  A multi-factor model with time-varying and seasonal risk premiums for the natural gas market , 2015 .

[50]  Dongmin Shin,et al.  Controllable lead time, service level constraint, and transportation discounts in a continuous review inventory model , 2016, RAIRO Oper. Res..