Enterprise-wide modeling & optimization - An overview of emerging research challenges and opportunities

The process systems engineering (PSE) as well as the operations research and management science (ORMS) literature has hitherto focused on disparate processes and functions within the enterprise. These themes have included upstream R&D pipeline management, planning and scheduling in batch and continuous manufacturing systems and more recently supply chain optimization under uncertainty. In reality, the modern process enterprise functions as a cohesive entity involving several degrees of cross-functional co-ordination across enterprise planning and process functions. The complex organizational structures underlying horizontally and vertically integrated process enterprises challenge our understanding of cross-functional co-ordination and its business impact. This article looks at the impact of enterprise-wide cross-functional coordination on enterprise performance, sustainability and growth prospects. Cross-functional coordination is defined as the integration of strategic and tactical decision-making processes involving the control of financial and inventory flows (both internal and external) as well as resource deployments. Initially, we demonstrate the existence of cross-functional decision-making dependencies using an enterprise network model. Subsequently, we discuss interactions between enterprise planning decisions involving project financing, debt-equity balancing, R&D portfolio selection, risk hedging with real derivative instruments, supply chain asset creation and marketing contracts which influence decision-making at the activity/process level. Several case studies are included to re-enforce the point that planning and process decisions need to be integrated.

[1]  R. Cooper,et al.  Best Practices for Managing R&D Portfolios , 1998 .

[2]  P. C. Nutt How Decision Makers Evaluate Alternatives and the Influence of Complexity , 1998 .

[3]  E. Pistikopoulos,et al.  Novel approach for optimal process design under uncertainty , 1995 .

[4]  Sunwon Park,et al.  Robust investment model for long-range capacity expansion of chemical processing networks under uncertain demand forecast scenarios , 1998 .

[5]  Karl T. Ulrich,et al.  Special Issue on Design and Development: Product Development Decisions: A Review of the Literature , 2001, Manag. Sci..

[6]  Nalin Kulatilaka,et al.  Real Options: Managing Strategic Investment in an Uncertain World , 1998 .

[7]  RAINER KOLISCH,et al.  Local search for nonpreemptive multi-mode resource-constrained project scheduling , 1997 .

[8]  Nikolaos V. Sahinidis,et al.  A finite branch-and-bound algorithm for two-stage stochastic integer programs , 2004, Math. Program..

[9]  Lazaros G. Papageorgiou,et al.  A hierarchical solution approach for multi-site capacity planning under uncertainty in the pharmaceutical industry , 2004, Comput. Chem. Eng..

[10]  S. Selcuk Erenguc,et al.  A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows , 1996 .

[11]  P. Roberts Product innovation, product–market competition and persistent profitability in the U.S. pharmaceutical industry , 1999 .

[12]  Gary Blau,et al.  Risk management in the development of new products in highly regulated industries , 2000 .

[13]  F. Black,et al.  The Pricing of Options and Corporate Liabilities , 1973, Journal of Political Economy.

[14]  Gintaras V. Reklaitis,et al.  Simulation-based optimization with surrogate models - Application to supply chain management , 2005, Comput. Chem. Eng..

[15]  Ignacio E. Grossmann,et al.  Evaluation and optimization of stochastic flexibility in multiproduct batch plants , 1992 .

[16]  Erik Demeulemeester,et al.  A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem , 1997, Oper. Res..

[17]  Eric C. Carlson,et al.  Simulation and queueing network modeling of single-product production campaigns , 1992 .

[18]  Vipul Jain,et al.  Resource-Constrained Scheduling of Tests in New Product Development , 1999 .

[19]  Edward W. Davis,et al.  A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .

[20]  Erik Demeulemeester,et al.  A branch-and-bound procedure for the multiple resource-constrained project scheduling problem , 1992 .

[21]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[22]  Joseph F. Pekny,et al.  A model predictive framework for planning and scheduling problems: a case study of consumer goods supply chain , 2000 .

[23]  Dimitri P. Bertsekas,et al.  Dynamic Programming and Optimal Control, Two Volume Set , 1995 .

[24]  R. Sargent,et al.  A general algorithm for short-term scheduling of batch operations */I , 1993 .

[25]  D. Atkin OR scheduling algorithms. , 2000, Anesthesiology.

[26]  Luis Puigjaner,et al.  Planning, scheduling and budgeting value-added chains , 2004, Comput. Chem. Eng..

[27]  K. K. Sinha,et al.  Toward a theory of project interdependencies in high tech R & D environments , 2002 .

[28]  S. S. Erenguc,et al.  The resource constrained time/cost tradeoff project scheduling problem with discounted cash flows , 1996 .

[29]  P. O'Connor Implementing a Stage‐Gate Process: A Multi‐Company Perspective , 1994 .

[30]  Gintaras V. Reklaitis,et al.  Simulation-optimization framework for stochastic optimization of R&D pipeline management , 2003 .

[31]  B. W. Ang,et al.  A comparative analysis of R&D project evaluation methods , 2001 .

[32]  Min Ding,et al.  Valuation and Design of Pharmaceutical R&D Licensing Deals , 2005 .

[33]  T. Keelin,et al.  How SmithKline Beecham makes better resource-allocation decisions. , 1998, Harvard business review.

[34]  Sönke Hartmann,et al.  Project Scheduling with Multiple Modes: A Genetic Algorithm , 2001, Ann. Oper. Res..

[35]  G. Reklaitis,et al.  A simulation based optimization approach to supply chain management under demand uncertainty , 2004, Comput. Chem. Eng..

[36]  Rainer Kolisch,et al.  PSPLIB - a project scheduling problem library , 1996 .

[37]  Sami M. Baroum,et al.  The development of cash flow weight procedures for maximizing the net present value of a project , 1996 .

[38]  Max Henrion,et al.  Uncertainty: A Guide to Dealing with Uncertainty in Quantitative Risk and Policy Analysis , 1990 .

[39]  Antonio Espuña Camarasa,et al.  Simultaneous optimization of process operations and financial decisions to enhance the integrated planning/scheduling of chemical supply chains , 2006, Comput. Chem. Eng..

[40]  Rolf H. Möhring,et al.  Linear preselective policies for stochastic project scheduling , 2000, Math. Methods Oper. Res..

[41]  Costas D. Maranas,et al.  Mid-term supply chain planning under demand uncertainty: customer demand satisfaction and inventory management , 2000 .

[42]  J. Boyd,et al.  The evolution of debt and equity markets in economic development , 1998 .

[43]  J. Pekny,et al.  Managing a Portfolio of Interdependent New Product Candidates in the Pharmaceutical Industry , 2004 .

[44]  Alexander J. Triantis,et al.  Dynamic R&D Investment Policies , 1999 .

[45]  N. Repenning Understanding fire fighting in new product development , 2001 .

[46]  Clifford W. Smith Alternative methods for raising capital: Rights versus underwritten offerings , 1977 .

[47]  Eduardo S. Schwartz,et al.  Investment Under Uncertainty. , 1994 .

[48]  Rainer Kolisch Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation , 1994 .

[49]  Rainer Kolisch,et al.  Efficient priority rules for the resource-constrained project scheduling problem , 1996 .

[50]  F. Black The pricing of commodity contracts , 1976 .

[51]  Kenneth B. Kahn An exploratory investigation of new product forecasting practices , 2002 .

[52]  Rainer Kolisch,et al.  PSPLIB - A project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program , 1997 .

[53]  T. Copeland Real Options: A Practitioner's Guide , 2001 .

[54]  Reha Uzsoy,et al.  Lagrangian heuristics for scheduling new product development projects in the pharmaceutical industry , 2007, J. Heuristics.

[55]  Gintaras V. Reklaitis,et al.  Risk and uncertainty in managing chemical manufacturing supply chains , 2000 .

[56]  I. Grossmann,et al.  A disaggregation algorithm for the optimization of stochastic planning models , 1997 .

[57]  Andreas Drexl,et al.  Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application , 1997 .

[58]  J. U. M. Smith,et al.  Project Risk Management: Processes, Techniques and Insights , 1998, J. Oper. Res. Soc..

[59]  E. Prescott,et al.  Investment Under Uncertainty , 1971 .

[60]  Efstratios N. Pistikopoulos,et al.  An optimization approach for process engineering problems under uncertainty , 1996 .

[61]  Gintaras V. Reklaitis,et al.  Simulation based optimization for risk management in multi-stage capacity expansion , 2006 .

[62]  Paul S. Adler,et al.  From project to process management: an empirically-based framework for analyzing product development time , 1995 .

[63]  J. Patterson,et al.  Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach , 1977 .

[64]  I. Karimi,et al.  Regulatory Factors and Capacity-Expansion Planning in Global Chemical Supply Chains , 2004 .

[65]  Eduardo S. Schwartz The stochastic behavior of commodity prices: Implications for valuation and hedging , 1997 .

[66]  J. Linton,et al.  Analysis, ranking and selection of R&D projects in a portfolio , 2002 .

[67]  R. Cooper,et al.  New Product Portfolio Management : Practices and Performance , 1999 .

[68]  Ming Ding,et al.  Structuring the New Product Development Pipeline , 2002, Manag. Sci..

[69]  Jan Węglarz,et al.  Project scheduling : recent models, algorithms, and applications , 1999 .

[70]  Robert H. Storer,et al.  Problem space search algorithms for resource-constrained project scheduling , 1997, Ann. Oper. Res..

[71]  I. Grossmann,et al.  Simultaneous Planning for New Product Development and Batch Manufacturing Facilities , 2001 .

[72]  Costas D. Maranas,et al.  Real Options Based Analysis of Optimal Pharmaceutical Research and Development Portfolios , 2002 .

[73]  David E. Goldberg,et al.  Genetic Algorithms in Search Optimization and Machine Learning , 1988 .

[74]  Efstratios N. Pistikopoulos,et al.  A hybrid parametric/stochastic programming approach for mixed-integer nonlinear problems under uncertainty , 1997 .

[75]  Christoph H. Loch,et al.  Evaluating growth options as sources of value for pharmaceutical research projects , 2001 .

[76]  Joseph F. Pekny,et al.  Algorithm architectures to support large-scale process systems engineering applications involving combinatorics, uncertainty, and risk management , 2002 .

[77]  Merton H. Miller The Cost of Capital, Corporation Finance and the Theory of Investment , 1958 .

[78]  James H. Patterson,et al.  A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem , 1984 .

[79]  Willy Herroelen,et al.  Project scheduling under uncertainty: Survey and research potentials , 2005, Eur. J. Oper. Res..

[80]  Miguel J. Bagajewicz,et al.  Use of inventory and option contracts to hedge financial risk in planning under uncertainty , 2004 .

[81]  Salah E. Elmaghraby,et al.  Activity networks: Project planning and control by network models , 1977 .

[82]  Rolf H. Möhring,et al.  Solving Project Scheduling Problems by Minimum Cut Computations , 2002, Manag. Sci..