A framework for standard modular simulation in semiconductor wafer fabrication systems
暂无分享,去创建一个
[1] Lawrence M. Wein,et al. Scheduling semiconductor wafer fabrication , 1988 .
[2] P. Sánchez,et al. GENERIC CASE STUDIES FOR MANUFACTURING SIMULATION APPLICATIONS , 2003 .
[3] M.C. Fu,et al. Optimal preventive maintenance scheduling in semiconductor manufacturing , 2004, IEEE Transactions on Semiconductor Manufacturing.
[4] D. J. Medeiros,et al. OPERATIONAL MODELING & SIMULATION IN SEMICONDUCTOR MANUFACTURING , 1998 .
[5] Lee W. Schruben,et al. Operational modeling and simulation in semiconductor manufacturing , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).
[6] Tyler Phillips. AutoSched/sup TM/ AP by autosimulations , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).
[7] A.A. Rodriguez,et al. Hierarchical modeling and control for re-entrant semiconductor fabrication lines: a mini-fab benchmark , 1997, 1997 IEEE 6th International Conference on Emerging Technologies and Factory Automation Proceedings, EFTA '97.
[8] Tyler Phillips. AUTOSCHED AP by AutoSimulations , 1998, WSC '98.
[9] M.C. Fu,et al. A Markov decision process model for capacity expansion and allocation , 1999, Proceedings of the 38th IEEE Conference on Decision and Control (Cat. No.99CH36304).
[10] Sunil Kumar,et al. Queueing network models in the design and analysis of semiconductor wafer fabs , 2001, IEEE Trans. Robotics Autom..
[11] Oliver Rose. CONWIP-like Lot Release for a Wafer Fabrication Facility with Dynamic Load Changes , 2001 .
[12] Charles R. McLean,et al. A framework for standard modular simulation :: application to semiconductor wafer fabrication , 2005 .
[13] Y.T. Lee,et al. A neutral information model for simulating machine shop operations , 2003, Proceedings of the 2003 Winter Simulation Conference, 2003..
[14] Charles R. McLean,et al. PROCEEDINGS OF THE 2003 WINTER SIMULATION CONFERENCE , 2003 .
[15] K. S. Tsakalis,et al. Integrated identification and control for diffusion/CVD furnaces , 1997, 1997 IEEE 6th International Conference on Emerging Technologies and Factory Automation Proceedings, EFTA '97.
[16] Charles R. McLean,et al. Manufacturing case studies: generic case studies for manufacturing simulation applications , 2003, WSC '03.
[17] Yadati Narahari,et al. Modeling the effect of hot lots in semiconductor manufacturing systems , 1997 .
[18] Reha Uzsoy,et al. A REVIEW OF PRODUCTION PLANNING AND SCHEDULING MODELS IN THE SEMICONDUCTOR INDUSTRY PART I: SYSTEM CHARACTERISTICS, PERFORMANCE EVALUATION AND PRODUCTION PLANNING , 1992 .
[19] P.R. Kumar. Scheduling semiconductor manufacturing plants , 1994, IEEE Control Systems.
[20] Charles R. McLean,et al. Shop Data Model and Interface Specification , 2005 .
[21] Randall P. Sadowski,et al. Simulation with Arena , 1998 .
[22] S. S. Panwalkar,et al. A Survey of Scheduling Rules , 1977, Oper. Res..
[23] Charles R. McLean,et al. A framework for standard modular simulation , 2002, Proceedings of the Winter Simulation Conference.
[24] E. Fernandez-Gaucherand,et al. An algorithm to convert wafer to calendar-based preventive maintenance schedules for semiconductor manufacturing systems , 2003, 42nd IEEE International Conference on Decision and Control (IEEE Cat. No.03CH37475).
[25] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[26] Charles R. McLean,et al. Simulation standards: a framework for standard modular simulation , 2002, WSC '02.
[27] Navdeep S. Grewal,et al. Integrating targeted cycle-time reduction into the capital planning process , 1998, 1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274).