A note on due-date assignment and single-machine scheduling with deteriorating jobs

In this note, we study a single-machine scheduling problem with deteriorating jobs whose processing times are an increasing function of their start times. The objective is to determine the optimal due-date and schedule simultaneously to minimize the total of due-date, earliness and tardiness penalties. We give a concise analysis of the problem and provide a polynomial time algorithm to solve the problem. Moreover, the algorithm can be easily applied to the ‘mirror’ scheduling problem in which the actual processing time of a job is a decreasing function of its starting time.

[1]  T. C. Edwin Cheng,et al.  Due-date assignment and single machine scheduling with deteriorating jobs , 2004, J. Oper. Res. Soc..

[2]  Sid Browne,et al.  Scheduling Deteriorating Jobs on a Single Processor , 1990, Oper. Res..

[3]  Gur Mosheiov,et al.  Scheduling jobs with step-deterioration; minimizing makespan on a single- and multi-machine , 1995 .

[4]  Gur Mosheiov,et al.  V-Shaped Policies for Scheduling Deteriorating Jobs , 1991, Oper. Res..

[5]  E.L. Lawler,et al.  Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .

[6]  Chuan-li Zhao,et al.  Single machine scheduling problems with deteriorating jobs , 2005, Appl. Math. Comput..

[7]  Gur Mosheiov,et al.  Λ-Shaped Policies to Schedule Deteriorating Jobs , 1996 .

[8]  S. S. Panwalkar,et al.  Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem , 1982, Oper. Res..

[9]  R. Jackson Inequalities , 2007, Algebra for Parents.

[10]  T. C. Edwin Cheng,et al.  Single machine due-date scheduling of jobs with decreasing start-time dependent processing times , 2005, Int. Trans. Oper. Res..

[11]  Adam Janiak,et al.  Minimizing maximum lateness under linear deterioration , 2000, Eur. J. Oper. Res..

[12]  Adam Janiak,et al.  Minimizing the total weighted completion time of deteriorating jobs , 2002, Inf. Process. Lett..

[13]  Gur Mosheiov,et al.  Scheduling jobs under simple linear deterioration , 1994, Comput. Oper. Res..

[14]  Sushil K. Gupta,et al.  Minimizing the makespan with late start penalties added to processing times in a single facility scheduling problem , 1990 .