Optimal age-replacement model with age-dependent type of failure and random lead time based on a cumulative repair-cost limit policy

In this paper, we consider an age-replacement model with minimal repair based on a cumulative repair cost limit and random lead time for replacement delivery. A cumulative repair cost limit policy uses information about a system’s entire repair cost history to decide whether the system is repaired or replaced; a random lead time models delay in delivery of a replacement once it is ordered. A general cost model is developed for the average cost per unit time based on the stochastic behavior of the assumed system, reflecting the costs of both storing a spare and of system downtime. The optimal age for preventive replacement minimizing that cost rate is derived, its existence and uniqueness is shown, and structural properties are presented. Various special cases are included, and a numerical example is given for illustration. Because the framework and analysis are general, the proposed model extends several existing results.

[1]  Frank Proschan,et al.  Optimum Replacement of a System Subject to Shocks , 1983, Oper. Res..

[2]  Shey-Huei Sheu,et al.  Optimal number of minimal repairs before replacement of a system subject to shocks , 1996 .

[3]  Kun‐Jen Chung A note on the upper bound and an algorithm for the optimal repair cost under minimal repair , 1995 .

[4]  Shey-Huei Sheu A general ordering policy with number‐dependentminimal repair and random lead time , 1999, Ann. Oper. Res..

[5]  Toshio Nakagawa,et al.  Optimal Number of Failures before Replacement Time , 1983, IEEE Transactions on Reliability.

[6]  R. I. Phelps Replacement Policies under Minimal Repair , 1981 .

[7]  D. S. Bai,et al.  An Age Replacement Policy with Minimal Repair Cost Limit , 1986, IEEE Transactions on Reliability.

[8]  Menachem Berg,et al.  A Marginal Cost Analysis for an Age Replacement Policy With Minimal Repair , 1982 .

[9]  Toshio Nakagawa,et al.  GENERALIZED MODELS FOR DETERMINING OPTIMAL NUMBER OF MINIMAL REPAIRS BEFORE REPLACEMENT , 1981 .

[10]  Frank Proschan,et al.  Periodic Replacement with Increasing Minimal Repair Costs at Failure , 1982, Oper. Res..

[11]  P. K. Kapur,et al.  Optimal number of minimal repairs before replacement with repair cost limit , 1989 .

[12]  R. Barlow,et al.  Optimum Preventive Maintenance Policies , 1960 .

[13]  Tadashi Dohi,et al.  A new graphical method to estimate the optimal repair-time limit with incomplete repair and discounting , 2003 .

[14]  T. H. Savits,et al.  Age Dependent Minimal Repair. , 1985 .

[15]  Frank Beichelt A replacement policy based on limiting the cumulative maintenance cost , 2001 .

[16]  Hidenori Morimura,et al.  On some preventive maintenance polices for IFR , 1969 .

[17]  Toshio Nakagawa,et al.  The Optimum Repair Limit Replacement Policies , 1974 .

[18]  Shey-Huei Sheu,et al.  An extended optimal replacement model of systems subject to shocks , 2006, Eur. J. Oper. Res..

[19]  Shey-Huei Sheu,et al.  Extended optimal age-replacement policy with minimal repair of a system subject to shocks , 2006, Eur. J. Oper. Res..

[20]  Tadashi Dohi,et al.  A graphical method to repair-cost limit replacement policies with imperfect repair , 2000 .

[21]  T. Nakagawa,et al.  Extended optimal replacement model with random minimal repair costs , 1995 .

[22]  Mohamed Abdel-Hameed,et al.  An imperfect maintenance model with block replacements , 1987 .

[23]  Daoud Ait Kadi,et al.  Optimal block replacement policies with multiple choice at failure , 1988 .

[24]  Kyung S. Park Pseudodynamic cost limit replacement model under minimal repair , 1985 .

[25]  Toshio Nakagawa A Modified Block Replacement with Two Variables , 1982, IEEE Transactions on Reliability.

[26]  Shey-Huei Sheu,et al.  Optimal block replacement policies with multiple choice at failure , 1992 .

[27]  Toshio Nakagawa,et al.  OPTIMUM REPLACEMENT POLICIES WITH DELAY , 1974 .

[28]  Shey-Huei Sheu A modified block replacement policy with two variables and general random minimal repair cost , 1996 .

[29]  Kyung Soo Park,et al.  Optimal number of major failures before replacement , 1985 .

[30]  Do Sun Bai,et al.  Repair cost limit replacement policy under imperfect inspection , 1988 .

[31]  Philip J. Boland Periodic replacement when minimal repair costs vary with time , 1982 .

[32]  Kyung Soo Park Cost limit replacement policy under minimal repair , 1983 .

[33]  D. N. P. Murthy,et al.  A Combined Block and Repair Limit Replacement Policy , 1984 .

[34]  Kun‐Jen Chung,et al.  A simple procedure to compute the optimal repair cost limit under minimal repair , 1996 .

[35]  Kyung S. Park Optimal Number of Minimal Repairs before Replacement , 1979, IEEE Transactions on Reliability.

[36]  Shey-Huei Sheu,et al.  Optimal age-replacement policy with age-dependent minimal-repair and random-leadtime , 2001, IEEE Trans. Reliab..

[37]  Shey-Huei Sheu,et al.  Extended optimal age replacement policy with minimal repair , 1993 .

[38]  Frank Beichelt,et al.  A Replacement Policy Based on Limits for the Repair Cost Rate , 1982, IEEE Transactions on Reliability.

[39]  Kyung Soo Park,et al.  Optimal number of minor failures before replacement , 1987 .

[40]  Hidenori Morimura,et al.  A NEW POLICY FOR PREVENTIVE MAINTENANCE , 1962 .

[41]  D. N. P. Murthy,et al.  A Note on the Repair Limit Replacement Policy , 1980 .

[42]  Masashi Kowada,et al.  Analysis of a system with minimal repair and its application to replacement policy , 1983 .

[43]  P. K. Kapur,et al.  Some replacement policies with minimal repairs and repair cost limit , 1989 .

[44]  Shigeru Yamada,et al.  Age Replacement with Leadtime , 1976, IEEE Transactions on Reliability.

[45]  Marvin Zelen,et al.  Mathematical Theory of Reliability , 1965 .

[46]  Hidenori Morimura,et al.  ON SOME PREVENTIVE MAINTENANCE POLICIES , 1963 .

[47]  N. A. J. Hastings,et al.  An Economic Replacement Model , 1967 .

[48]  C. Tilquin,et al.  The Age Replacement Problem with Minimal Repair and Random Repair Costs , 1979, Oper. Res..

[49]  Frank Beichelt,et al.  A unifying treatment of replacement policies with minimal repair , 1993 .

[50]  Shey-Huei Sheu,et al.  Optimal age-replacement policy of a system subject to shocks with random lead-time , 2004, Eur. J. Oper. Res..