Rigorous simulation, energy and environmental analysis of an actual baseload LNG supply chain

Abstract The liquefied natural gas (LNG) supply chain utilizes significant amounts of resources due to its stringent processing requirements. Reducing such resources is economically and environmentally desirable. However, no rigorous, fully validated simulation model exists for the entire chain to serve as a powerful and cost-effective tool for optimization and other reliable analyses. In this work, we used actual data to construct a full chain rigorous simulation model spanning all units from the wellhead to transportation and regasification. In addition to key simulation results, we presented an effective systematic approach for the simulation while discussing essential operating envelopes and constraints that must be respected to obtain reliable predictions. Using the model, we performed an energy and environmental analysis to thoroughly quantify chain losses, emissions and wastes. This model will serve as the basis for a series of publications on the optimization and analysis of the LNG chain.

[1]  W. Svrcek,et al.  Modelling the modified claus process reaction furnace and the implications on plant design and recovery , 1993 .

[2]  J. Romero Gómez,et al.  On board LNG reliquefaction technology: a comparative study , 2013 .

[3]  Ruilin Liu,et al.  Solubility of CH4 in the mixed solvent t-butyl alcohol and water , 1995 .

[4]  Iftekhar A. Karimi,et al.  Optimization of helium extraction processes integrated with nitrogen removal units: A comparative study , 2019, Comput. Chem. Eng..

[5]  Fawzi Banat,et al.  Energy and exergical dissection of a natural gas sweetening plant using methyldiethanol amine (MDEA) solution , 2014 .

[6]  Ma Linwei,et al.  A well-to-wire life cycle assessment of Canadian shale gas for electricity generation in China , 2016 .

[7]  Dharik S. Mallapragada,et al.  Efficient electrochemical refrigeration power plant using natural gas with ∼100% CO2 capture , 2015 .

[8]  Đorđe Dobrota,et al.  Problem of Boil - off in LNG Supply Chain , 2013 .

[9]  Iftekhar A. Karimi,et al.  A superstructure‐based model for multistream heat exchanger design within flow sheet optimization , 2017 .

[10]  Majeed S. Jassim,et al.  Sensitivity analyses and optimization of a gas sweetening plant for hydrogen sulfide and carbon dioxide capture using methyldiethanolamine solutions , 2016 .

[12]  Arno de Klerk,et al.  Fischer-Tropsch Refining , 2011 .

[13]  W. Wagner,et al.  The GERG-2008 Wide-Range Equation of State for Natural Gases and Other Mixtures: An Expansion of GERG-2004 , 2012 .

[14]  Frank Pettersson,et al.  Optimization of a small-scale LNG supply chain , 2018 .

[15]  R P Sinha,et al.  Investigation of propulsion system for large LNG ships , 2012 .

[16]  T. Guo,et al.  Experimental study on the solubility of natural gas components in water with or without hydrate inhibitor , 2003 .

[17]  T. Al‐Ansari,et al.  Sustainable Liquefied Natural Gas Supply Chain Management: A Review of Quantitative Models , 2019 .

[18]  Saad Ali Al-Sobhi Simulation and integration of liquefied natural gas (lng) processes , 2009 .

[19]  Moses O. Tadé,et al.  A case study: Application of energy and exergy analysis for enhancing the process efficiency of a three stage propane pre-cooling cycle of the cascade LNG process , 2016 .

[20]  Easa I. Al-musleh,et al.  Continuous power supply from a baseload renewable power plant , 2014 .

[21]  B. Khoshandam,et al.  Simulation and comparison of Sulfinol solvent performance with Amine solvents in removing sulfur compounds and acid gases from natural sour gas , 2015 .

[22]  M. Moshfeghian,et al.  Simulation and optimization of a condensate stabilisation process , 2016 .

[23]  Easa Ismail Al-musleh,et al.  Efficient processes for power generation and energy storage , 2014 .

[24]  Amit Kumar,et al.  Techno-economic and life cycle assessments of the natural gas supply chain from production sites in Canada to north and southwest Europe , 2018 .

[25]  I. Moon,et al.  Current Status and Perspectives of Liquefied Natural Gas (LNG) Plant Design , 2013 .

[26]  D. Cameron,et al.  Integrated Distributed Dynamic Simulation of the LNG Value Chain: Concepts and Experience , 2005 .

[27]  Qiang Xu,et al.  Simulation study on boil-off gas minimization and recovery strategies at LNG exporting terminals , 2015 .

[28]  Chang Jun Lee,et al.  Stochastic Optimization of a Natural Gas Liquefaction Process Considering Seawater Temperature Variation Based on Particle Swarm Optimization , 2018 .

[29]  Sanghyuk Lee,et al.  Economic evaluation of pressurized LNG supply chain , 2016 .

[30]  Inkyu Lee,et al.  Conceptual design and exergy analysis of combined cryogenic energy storage and LNG regasification processes: Cold and power integration , 2017 .

[31]  Juwon Kim,et al.  Economic evaluation of a new small-scale LNG supply chain using liquid nitrogen for natural-gas liquefaction , 2016 .

[32]  K. Arrhenius,et al.  Variations of fuel composition during storage at Liquefied Natural Gas refuelling stations , 2018 .

[33]  Kenneth R. Hall,et al.  PρT Behavior of a Lean Synthetic Natural Gas Mixture Using Magnetic Suspension Densimeters and an Isochoric Apparatus: Part I , 2011 .

[34]  Bjarne A. Foss,et al.  Dynamic Optimization of the LNG Value Chain , 2009 .

[35]  M. Mehrpooya,et al.  Energy and exergy analyses of five conventional liquefied natural gas processes , 2014 .

[36]  Majid Amidpour,et al.  Development and optimization of an integrated process configuration for natural gas liquefaction (LNG) and natural gas liquids (NGL) recovery with a nitrogen rejection unit (NRU) , 2016 .

[37]  Amit Kumar,et al.  A techno-economic assessment of the liquefied natural gas (LNG) production facilities in Western Canada , 2016 .

[38]  Eric C. Carlson,et al.  Don't Gamble With Physical Properties For Simulations , 1996 .

[39]  Iftekhar A. Karimi,et al.  Operational Optimization of Processes with Multistream Heat Exchangers Using Data-Driven Predictive Modeling , 2019, Industrial & Engineering Chemistry Research.

[40]  Ma Linwei,et al.  A techno-economic study of shipping LNG to the Asia-Pacific from Western Canada by LNG carrier , 2016 .

[41]  Frank Pettersson,et al.  An MILP model for optimization of a small-scale LNG supply chain along a coastline , 2015 .

[42]  Kenneth R. Hall,et al.  p–ρ–T Behavior of Three Lean Synthetic Natural Gas Mixtures Using a Magnetic Suspension Densimeter and Isochoric Apparatus from (250 to 450) K with Pressures up to 150 MPa: Part II , 2011 .

[43]  K. Hall,et al.  (p, Vm, T) and phase equilibrium measurements for a natural gas-like mixture using an automated isochoric apparatus , 2006 .

[44]  L. Pellegrini,et al.  Energy and exergy analysis of acid gas removal processes in the LNG production chain , 2019, Journal of Natural Gas Science and Engineering.

[45]  Arnab Dutta,et al.  Towards energy-efficient LNG terminals: Modeling and simulation of reciprocating compressors , 2019, Comput. Chem. Eng..

[46]  M. Rahimpour,et al.  Modeling and optimization of an industrial Claus process: Thermal and catalytic section , 2017 .