Performance Analysis on Transfer Platforms in Frame Bridge Based Automated Container Terminals
暂无分享,去创建一个
[1] Jingshan Li,et al. Throughput analysis of production systems: recent advances and future topics , 2009 .
[2] Lu Zhen,et al. A Comparative Study on Two Types of Automated Container Terminal Systems , 2012, IEEE Transactions on Automation Science and Engineering.
[3] Kap Hwan Kim,et al. Optimizing the Block Size in Container Yards , 2010 .
[4] Mark Goh,et al. Discrete time model and algorithms for container yard crane scheduling , 2009, Eur. J. Oper. Res..
[5] Ling Qiu,et al. A bi-directional path layout for conflict-free routing of AGVs , 2001 .
[6] Loo Hay Lee,et al. An Integrated Model for Berth Template and Yard Template Planning in Transshipment Hubs , 2011, Transp. Sci..
[7] Kap Hwan Kim,et al. An optimal layout of container yards , 2008, OR Spectr..
[8] Lu Zhen. Yard template planning in transshipment hubs under uncertain berthing time and position , 2013, J. Oper. Res. Soc..
[9] Loo Hay Lee,et al. A decision model for berth allocation under uncertainty , 2011, Eur. J. Oper. Res..
[10] Kap Hwan Kim,et al. A Look-Ahead Dispatching Method for Automated Guided Vehicles in Automated Port Container Terminals , 2004, Transp. Sci..
[11] Petros A. Ioannou,et al. Design, simulation, and evaluation of automated container terminals , 2002, IEEE Trans. Intell. Transp. Syst..
[12] Kap Hwan Kim,et al. Comparison and evaluation of various cycle-time models for yard cranes in container terminals , 2010 .
[13] D Towsley,et al. Symmetry property of the throughput in closed tandem queueing networks with finite buffers , 1991, Oper. Res. Lett..
[14] Lu Zhen,et al. A bi-objective model for robust berth allocation scheduling , 2012, Comput. Ind. Eng..
[15] Satoshi Hoshino,et al. Hybrid Design Methodology and Cost-Effectiveness Evaluation of AGV Transportation Systems , 2007, IEEE Transactions on Automation Science and Engineering.
[16] Dong-Jo Park,et al. Performance analysis and optimization of cyclic production lines , 2002 .
[17] Michael G.H. Bell,et al. An uncertainty-aware AGV assignment algorithm for automated container terminals , 2010 .
[18] Stephan Biller,et al. Closed Bernoulli Production Lines: Analysis, Continuous Improvement, and Leanness , 2009, IEEE Transactions on Automation Science and Engineering.
[19] Der-Horng Lee,et al. The Integrated Yard Truck and Yard Crane Scheduling Problem: Benders' Decomposition-Based Methods , 2010 .