Performance Analysis on Transfer Platforms in Frame Bridge Based Automated Container Terminals

This paper studies a new automated container terminal (ACT) system which utilizes multistory frame bridges and rail-mounted trolleys to transport containers between the quay and the yard. Beside typical ACT systems use trucks or automated guided vehicles for transporting containers between quay cranes and yard cranes, the new design uses three types of handling machines, namely, ground trolleys (GTs), transfer platforms (TPs), and frame trolleys (FTs). These three types of handling machines collaborate with one another to transport containers. This study decomposes the system into several subsystems. Each subsystem has one TP and several FTs and GTs dedicated to this TP. Then, a Markov chain model is developed to analyze the throughput of TPs. At last, the performance of the new ACT system is estimated. Sensitivity analyzes the numbers, and the processing rates of trolleys are conducted through the numeric experiments.

[1]  Jingshan Li,et al.  Throughput analysis of production systems: recent advances and future topics , 2009 .

[2]  Lu Zhen,et al.  A Comparative Study on Two Types of Automated Container Terminal Systems , 2012, IEEE Transactions on Automation Science and Engineering.

[3]  Kap Hwan Kim,et al.  Optimizing the Block Size in Container Yards , 2010 .

[4]  Mark Goh,et al.  Discrete time model and algorithms for container yard crane scheduling , 2009, Eur. J. Oper. Res..

[5]  Ling Qiu,et al.  A bi-directional path layout for conflict-free routing of AGVs , 2001 .

[6]  Loo Hay Lee,et al.  An Integrated Model for Berth Template and Yard Template Planning in Transshipment Hubs , 2011, Transp. Sci..

[7]  Kap Hwan Kim,et al.  An optimal layout of container yards , 2008, OR Spectr..

[8]  Lu Zhen Yard template planning in transshipment hubs under uncertain berthing time and position , 2013, J. Oper. Res. Soc..

[9]  Loo Hay Lee,et al.  A decision model for berth allocation under uncertainty , 2011, Eur. J. Oper. Res..

[10]  Kap Hwan Kim,et al.  A Look-Ahead Dispatching Method for Automated Guided Vehicles in Automated Port Container Terminals , 2004, Transp. Sci..

[11]  Petros A. Ioannou,et al.  Design, simulation, and evaluation of automated container terminals , 2002, IEEE Trans. Intell. Transp. Syst..

[12]  Kap Hwan Kim,et al.  Comparison and evaluation of various cycle-time models for yard cranes in container terminals , 2010 .

[13]  D Towsley,et al.  Symmetry property of the throughput in closed tandem queueing networks with finite buffers , 1991, Oper. Res. Lett..

[14]  Lu Zhen,et al.  A bi-objective model for robust berth allocation scheduling , 2012, Comput. Ind. Eng..

[15]  Satoshi Hoshino,et al.  Hybrid Design Methodology and Cost-Effectiveness Evaluation of AGV Transportation Systems , 2007, IEEE Transactions on Automation Science and Engineering.

[16]  Dong-Jo Park,et al.  Performance analysis and optimization of cyclic production lines , 2002 .

[17]  Michael G.H. Bell,et al.  An uncertainty-aware AGV assignment algorithm for automated container terminals , 2010 .

[18]  Stephan Biller,et al.  Closed Bernoulli Production Lines: Analysis, Continuous Improvement, and Leanness , 2009, IEEE Transactions on Automation Science and Engineering.

[19]  Der-Horng Lee,et al.  The Integrated Yard Truck and Yard Crane Scheduling Problem: Benders' Decomposition-Based Methods , 2010 .