Abstract This paper deals with a two-unit warm standby system. These units are identical, but have different failure rates and repair time distributions, when failed in operating or standby state. If the unit fails in operating state, we wait for the repairman for some maximum time or until the other unit fails, and if the unit fails in standby state we wait for the repairman until the other unit fails. On the failure of the second unit or on the completion of the maximum time, we call the repairman immediately at the higher cost. The system has been analysed to determine the various reliability measures by using semi-Markov processes and regenerative processes. Numerical results pertaining to some particular cases are also added.
[1]
Toshio Nakagawa,et al.
Stochastic Behavior of 2-Unit Standby Redundant Systems with Imperfect Switchover
,
1975,
IEEE Transactions on Reliability.
[2]
Boris Vladimirovič Gnedenko,et al.
Mathematical methods in the reliability theory
,
1969
.
[3]
Marvin Zelen,et al.
Mathematical Theory of Reliability
,
1965
.
[4]
K. Murari,et al.
Reliability system with two types of repair facilities
,
1983
.
[5]
R. Subramanyam Naidu,et al.
Stochastic behaviour of a two-unit repairable system subject to inspection
,
1982
.