Steam-Electric Scale Economies and Construction Lead Times
暂无分享,去创建一个
[1] J. Hausman. Specification tests in econometrics , 1978 .
[2] Paul L. Joskow,et al. The Effects of Technological Change, Experience, and Environmental Regulation on the Construction Cost of Coal-Burning Generating Units , 1985 .
[3] H. Wills. Estimation of a Vintage Capital Model for Electricity Generating , 1978 .
[4] J. Stewart. Plant Size, Plant Factor, and the Shape of the Average Cost Function in Electric Power Generation: A Nonhomogeneous Capital Approach , 1979 .
[5] Dale W. Jorgenson,et al. Statistical inference for a system of simultaneous, non-linear, implicit equations in the context of instrumental variable estimation , 1979 .
[6] D. Jorgenson,et al. TRANSCENDENTAL LOGARITHMIC PRODUCTION FRONTIERS , 1973 .
[7] Paul L. Joskow,et al. Productivity Growth and Technical Change in the Generation of Electricity , 1987 .
[8] P. Ruud. Tests of specification in econometrics , 1984 .
[9] Maintenance Branch. Thermal-electric plant construction cost and annual production expenses, 1981. [Glossary] , 1984 .
[10] Frederic S. Mishkin,et al. Electric Utility Fuel Choice Behavior in the United States , 1977 .
[11] G. Rothwell,et al. A Note on Allowed and Realized Rates of Return in the Electric Utility Industry , 1987 .
[12] Adrian Pagan,et al. The Lagrange Multiplier Test and its Applications to Model Specification in Econometrics , 1980 .